You are on page 1of 19

SOUTH EAST UTTAR PRADESH POWER TRANSMISSION COMPANY LIMITED

TRIPPING DETAILS
400KV REWA ROAD-BANDA CKT-1
DATE:16.06.2019
TIME: 15.13 hrs
C.B. No. Flags & Flags &
Tripping Closing Tripping
Sl Name of with Type of Relay Indications Indications F/L Tripping Reason Corrective
Name of Element Date/Ti Date/Ti parameter Remark
No. Substation Direction( Scheme Observed Observed (KM) Analysis indentfied action taken
me me (3ph V&I)
Code) our end other end
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

400 kV LINES

VL1: 199.140
General kV
Distance
Trip, General Trip, VL2: 87.06 kV 400kV Rewaroad -
400kV Rewaroad - 16.06.20 16.06.20 Protection: Earth fault Informed to
400kV GIS 404(Forwa DEF 86A 86B VL3: 125.65 Band line-1
1 Banda 19/15:1 19/19.0 REL670 (Main- Non not found found in UPPCL
REWAROAD rd) 86A 86B optd. kV tripped from both
line-1 3 hrs 2 hrs 1) R-phase in for patorilling.
optd. DT RECEIVE IL1: 999 A end.
P444 (Main-2)
DT SEND IL2: 243 A
IL3: 376 A
MICOM P444
REL 670
REL 670
400KV REWA ROAD-BANDA CKT-2
DATE:16.06.2019
TIME: 15.13 hrs
November' 2019
C.B. No. Flags & Flags &
Tripping Closing Tripping
Sl Name of with Type of Relay Indications Indications F/L Tripping Reason Corrective
Name of Element Date/Ti Date/Ti parameter Remark
No. Substation Direction( Scheme Observed Observed (KM) Analysis indentfied action taken
me me (3ph V&I)
Code) our end other end
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

400 kV LINES

General 400kV Band line-2


VL1: 66.140
trip, no tripping found
kV
R-phase in same time
Distance VL2: 236.06
Fault, trip at 16.25 when rewa road
400kV Rewaroad 16.06.20 16.06.20 Protection: kV Earth fault Informed to
400kV GIS 405(Forwa Zone-1 hrs end tripped after
1 - Banda 19/15:1 19/18:0 REL670 (Main- Non VL3: 233.65 Earth fault found in UPPCL
REWAROAD rd) optd. due to over some time (16.25
line-2 3 hrs 6 hrs 1) kV R-phase for patorilling.
TOV optd. voltage hrs)banda ckt -2
P444 (Main-2) IL1: 1.16K A
Fuse Fail. tripped due to
IL2: 341.60 A
86A, 86B over voltage
IL3: 366.9 A
optd.
MICOM P444
REL 670
REL670
400KV REWA ROAD-BANDA CKT-2
DATE:26.06.2019
TIME: 16.33 hrs
November' 2019

C.B. No. Flags & Flags &


Tripping Closing Tripping
Sl Name of with Type of Relay Indications Indications F/L Tripping Reason Corrective
Name of Element Date/Ti Date/Ti parameter Remark
No. Substation Direction( Scheme Observed Observed (KM) Analysis indentfied action taken
me me (3ph V&I)
Code) our end other end

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
400 kV LINES

VL1: 66.140
General Trip,
General kV
R,Y,B three
trip, VL2: 236.06
phase fault,
R-phase kV
Distance Started 400kV Rewaroad
Fault, VL3: 233.65
400kV Rewaroad 26.06.20 26.06.20 Protection: Phase AB, Earth fault Informed to -
400kV GIS 405(Forwa Zone-1 - 509 kV
1 - Banda 19/16:3 19/16:3 REL670 (Main- 86A 86B Earth fault found in UPPCL Band line-2
REWAROAD rd) optd, m IL1: 1.1876K
line-2 3 hrs 3 hrs 1) optd, R-phase for patorilling. tripped from both
Fuse Fail, A
P444 (Main-2) DT- end.
86A, 86B IL2:286.316
Received,
optd, A
Distance:
AR optd, IL3: 408.056
-509m
A
MICOM P444
REL670
REL670
REL670
400KV REWA ROAD-BANDA CKT- 1 & 2
DATE:31.8.2019
TIME: 00.07 hrs

C.B. No. Flags & Flags &


Tripping Closing Tripping
Sl Name of with Type of Relay Indications Indications F/L Tripping Reason Corrective
Name of Element Date/Tim Date/Ti parameter Remark
No. Substation Direction( Scheme Observed Observed (KM) Analysis indentfied action taken
e me (3ph V&I)
Code) our end other end
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
400 kV LINES
Distance
31.8.201 400kV Rewaroad -
400kV Rewaroad - Protection:
400kV GIS 31.8.2019/ 9/ 404(Forwar no flag Banda line-1
1 Banda REL670 (Main- over voltage NA NA NA NA NA
REWAROAD 0.07 hrs 11.08 d) found tripped from
line-1 1)
hrs Banda end only
P444 (Main-2)
Distance
400kV Rewaroad -
400kV Rewaroad - 31.8.201 Protection:
400kV GIS 31.8.2019/ 405(Forwar no flag Banda line-2
2 Banda 9/ REL670 (Main- over voltage NA NA NA NA NA
REWAROAD 0.07 hrs d) found tripped from
line-2 2.01 hrs 1)
Banda end only
P444 (Main-2)
NOTE:
ABOVE 400 KV REWA ROAD – BANDA CKT 1 & 2 ,TRIPPED AT BANDA END
ONLY DUE TO OVER VOLTAGE PROTECTION OPERATED
NO TRIP WAS FOUND IN REWA ROAD END
400KV REWA ROAD – OBRA CKT
DATE:2.11.2019
TIME: 10.50 hrs
November' 2019

Tripping Closing C.B. No. with Type of Relay Flags & Indications Flags & Indications Tripping parameter Corrective action
Sl No. Name of Substation Name of Element F/L (KM) Tripping Analysis Reason indentfied Remark
Date/Time Date/Time Direction(Code) Scheme Observed our end Observed other end (3ph V&I) taken

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

400 kV LINES

VL1: 244.16 kV
Y-phase trip, VL2: 192.00 kV
Distance Protection: General trip, Zone-1 optd.
02.11.2019/1 02.11.2019/1 VL3: 241.40 kV Earth fault found in Informed to UPPCL 400kV Rewaroad - Obra line
1 400kV GIS REWAROAD 400kV Rewaroad - Obra line 414(Forward) REL670 (Main-1) Y-phase trip, Zone-1B optd. 96.5 KM Earth fault
0:50 hrs 2:22 hrs
P444 (Main-2) Zone-1 optd. Definitive trip, IL1: 32.92 A Y-phase for patorilling. tripped from both end.
A/R block IL2: 3128.73 A
IL3: 460.44 A
MICOM P444
REL 670