CRITERIA FOR SELECTION & ALLOCATION OF MASAJID AS PER PC-I
SELECTION: • First Priority will be given to OFF-Grid areas. • Second Priority will be given to heavy load shedding areas. ALLOCATION: • District wise allocation of Masajid is as per population census 2017. IDENTIFIED: • List of Masajid received from the E&P Deptt. Through Chief Minister Secretariat. DIVISION OF 4000 MASAJID INTO 12 PACKAGES: • For the smooth and efficient execution of the project, the project is divided in 12 packages. ALLOCATION OF MASAJID AS PER PC-I Sr. No. District Population as per Census 2017 Allocation out of 4000 Masajid 1 Peshawar 4,269,079 559 2 Nowshera 1,518,540 199 3 Mardan 2,373,061 311 4 Charsadda 1,616,198 212 5 Swabi 1,624,616 213 6 Swat 2,309,570 303 7 Buner 897,319 118 8 Shangla 757,810 99 9 Malakand 720,295 94 10 Lower Dir 1,435,917 188 11 Upper Dir 946,421 124 12 Chitral 447,362 59 13 Abbottabad 1,332,912 175 14 Haripur 1,003,031 131 15 Mansehra 1,556,460 204 16 Batagram 476,612 62 17 Kohistan 784,711 103 18 Torghar 171,395 22 19 Bannu 1,167,892 153 20 Lakki Marwat 876,182 115 21 Kohat 993,874 130 22 Hangu 518,798 68 23 Karak 706,299 93 24 Tank 391,885 51 25 D. I. Khan 1,627,132 213 TOTAL 30,523,371 4000 DETAIL OF PACKAGES FOR THE PROJECT "SOLAR ELECTRIFICATION OF 4000 MASAJID IN KHYBER PAKHTUNKHWA" S.No District Package Detail Total Allocation of Masajid in District 1 Peshawar Package 01 559 2 Mardan Package 02 311 a) Charsadda Package 03 411 3 b) Nowshera 4 Swabi Package 04 213 a) Swat b) Buner Package 05 520 5 c) Shangla a) Malakand Package 06 282 6 b) Lower Dir a) Upper Dir Package 07 183 7 b) Chitral a) Abbottabad Package 08 307 8 b) Haripur a) Mansehra b) Batagram Package 09 391 c) Kohistan 9 d) Torghar a) Bannu b) Lakki Marwat Package 10 319 10 c) Tank a) Kohat b) Hangu Package 11 291 11 c) Karak 12 D. I. Khan Package 12 213 Total 4000