ABSTRACT
This mini project work program has been under taken to investigate the
requirement of steam pipe lines in ammonia plant at “ NAGARJUNA
FERTILIZERS AND CHEMICALS LIMITED (NFCL) KAKINADA”. And to
study about the types of steams ,valves used in pipe lines , welding procedure of
pipe lines , working of steam pipe lines.
By following this process we can prevent leakages and damage of steam pipe lines
and also we can reduce corrosion by insulation process
Page 2
INTRODUCTION
Nagarjuna fertilizers and chemicals Limited operates a large modern Ammonia urea
complex compromising two streams of ammonia and urea each.
The manufacturing facilities are located at Kakinada in the state of A.P. It is the first
gas based fertilizer complex in South India .
In NFCL the manufacturing urea for this the main raw material is liquid ammonia
by steam .Air from atmosphere comes in contact with the process gas from primary
reformer.
This plant had gone a major revamping in September 2009.The capacities are
enhanced to ammonia 2325 tones .
Page 3
NFCL PROFILE
NAGARJUNA GROUP
PROJECT PROFILE
RAW MATERIAL
OBJECTIVES OF NFCL
Page 4
A STUDY ON STEAM PIPING IN
AMMONIA PLANT AT NFCL
Generally the steam is produced in power plant in boilers, auxiliary boilers, waste heat
boilers (heat recovery steam generation units, HSRG) The piping for the steam is
according to the SNAMPROGRETTI‘s ITALY Specifications. Each line is designated
with specific number designating various features
Page 5
Very High Pressure Steam:(KS)
Ex. 14”-11-K.S1100-88D-I.
It indicates
14”-size of pipe.
11-plant unit code
K.S – service of the pipe.
1100 -location.
88D- spec for pipe.
I –insulated..
Page 6
Page 7
Various piping components and specifications:
Page 8
Non return valve
Page 9
Pressure Design Of Piping Components
The required thickness of straight section of pipe shall be determined by
equation Tm=t + c
The minimum thickness T for pipe selected, considering, manufacture minus
tolerance than tm. Shall be not less than tm. The following nomenclatur is used in
equations for pressure design of straight pipe.
Rating:
2500 LB RJ
(ringjoint gasket)
Page 11
Composition of K.S Pipe Material & Manufacture:
ASTM A 335 GRADE P22 SMLS +60637(I.B.R)
P22:
Carbon 0.05-0.15
Manganese 0.30-0.60
Max 0.025
Chromium 1.90-2.60
Molybdenum 0.87-1.13
Page 12
Insulation
Insulation is also followed according to snamprogetti’s specifications. The various letters
indicate the various types of insulations.
A=internally treated and externally coated line
B=line with externally coating only
E=electric traced line
F=cold insulated line (+5ºc to -273ºc)
I=hot insulated line (temp +6ºc and above)
N=non painted and non insulated line
S=internally treated and externally painted line
T=hot fluid traced line
V=line with external painting only
W=jacketed line
Each insulation is to be carried out according to their respective specification.
Page 13
Ball Valve
Page 14
WELDING SPECIFICATIONS
CONTENTS:
SCOPE AND FIELD OF APPLICATION:
This specification provides the requirements for chromium molybdenum steel
piping
PREPARATION FOR WELDING:
EDGE PREPARATION:
HOT ADJUSTMENT:
Temperature range from 700 to 950.all pieces having under gone hot adjustment
shall be subjected to PWHT.
Page 15
WELDING PROCEDURE QUALIFICATIONS:
The welding procedure shall be previously qualified according to the
requirements of ASME.
PREHEATING:
It is required for any type of welding , including the welding of yokes,
tack welding, and the welding of permanent of temporary support.
ROOT PASS:
For but joint without back welding and for branch connections, the
root pass shall be performed with the welding process and the filler metal.
PWHT TREATMENTS:
The heating rate, measured at 100c intervals, shall not be higher than
200c/hr and difference measured by the various thermo couples shall never be higher
than 50c
Page 16
HIGH PRESSURE STEAM (HS)
The HS lies in temperature of 370°c & a pressure of 37 kg/m^2. The Steam of this
network is coming from plant B.L &is utilized in Hydrolyzer 01-R—102. HS, there is no
hour.
•At PAC (PROCESS AIR COMPRESSOR) DSTK 421 is 28 tonnes per hour.
Page 17
H.S Pipe Line Specifications
Pipe line: 24”-11-HS-1100-65A-I
We already know about 24, 11, HS, 1100, 65A, I
In detail about 65A SPEC:
Service: Steam condensate; Medium pressure steam (I.B.R) pipe size& thickness
available are as follows:
Page 18
Composition:
Pipe Line Material & Manufacture:
ASTM A 335 GRADE P1 SMLS +60637
P1:
UNS Designation K 11522
Carbon 0.10-0.20
Manganese 0.30-0.80
Phosphorus Max 0.025
Max 0.025
Silicon 0.10-0.50
Chromium --
Molybdenum 0.44-0.65
Page 19
LOW PRESSURE STEAM
Page 20
Page 21
GATE VALVE
Page 22
LS pipe line specification:
pipe line 26”-11-LS-1100-11H-I
Properties :
Tensile strength minimum
Yield strength minimum
Top ups:
Tapings:
Page 23
Chemical composition:
Page 24
How to charge LS pipe line:
LS vent values PV-39 is open full by PIC-39on manual. open the isolated values.
Page 25
Conclusion:
By this project we got an over view of steam piping network i.e. selection of
valves, pipes & thickness, welding spec and how the mechanical equipment
is being used.
By this process we can prevent leakages and damage of steam pipe lines
and hence we can reduce corrosion by insulation process.
Page 26
QUERY’S
Page 27
Thank Q