Professional Documents
Culture Documents
Energy-saving
wastewater treatment
system based on a
We design for the future
powerful aerator
Company working for energy conservation and environmental
improvement based on biotechnology and environmental engineering
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
Research History & Participating in National Projects
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
Research History & Participating in National Projects
2007 NEDO installed a rapid wastewater treatment system using strong oxidative decomposition bacteria in a Vietnamese beer brewery
Conducted joint research with the Institute of Environmental Technology (IET) of the Vietnamese Academy of Science and Technology and
environmental technology transfer –March 2008 (This research is a collaborative research with Professor TADAYUKI IMANAKA of Kyoto University
2008 Participated as a member of industry, academic and governmental missions in Kyoto Prefecture, signed technical cooperation for solving
environmental problems with Shaanxi Province of China
2014 The Purification system for Lake Kandawgyi of Myanmar which is polluted by Algae . Algae processing system
with coagulant and pressurized 10 million yen subsidy business (Cooperation project with TESCO at JICA)
2015 Ministry of the Environment "Bilateral cooperation project with Indonesia on international development
of co-benefit type environmental measures"
Indonesia PTPN II palm oil supply plant wastewater treatment system new construction model equipment
provided 10 million yen Shinko Research outsourcing business
2016 Energy saving in industrial wastewater treatment for rubber industry in Indonesia
2018 In this project, the aeration equipment of the natural rubber factory ABP company in Indonesia was exchanged
from the Diffuser to the AERATOR S1, the power consumption was reduced by 40%. Subsidies for half the
cost from the Ministry of the Environment, JCM Project ,AERATORS1 504 Sets replacement installation
( Joint Members EMATEC ,Mitsubishi UFJ Research and Consulting)
2017 "Asian Water Environment Improvement Model Project" Indonesia's Leather Industrial Park LIK has
2018 improved energy-saving processing systems with efficient industrial wastewater treatment projects,
The aerator R1 50Sets was replaced with a diffuser. ( Joint Members EMATEC ,Mitsubishi UFJ Research and Consulting)
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1
STRUCTURAL DRAWING
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
SUZUKI AERATOR R - 1
The Aerator R-1 is a stationary diffusing cylinder developed especially Improvement of Processing Performance of BOD, COD
for aeration of activated sludge tank and it has no movable parts.
Air blown to bottom passes through the aerator together with water. Agitation of for gas and liquid by strong stirring
Then, the air and water are mixed with each other by stirring and Improvement of liquid circulation and oxygen
generate ultra-fine bubbles.
dissolution efficiency
Simultaneous by the cylinder absorb and lift the lower fluid materials
up. Extinction of stink due to accumulated of waste sludge
To circulate the whole fluid materials continuously the bubbles
exchange, oxidize, deoxidize, absorb the upper and lower fluid
materials continuously and efficiently.
The Spiral fluid stream, i.e., mixture of water and air, is stirred by
3. CURRENT CUTTER a current cutter of special shape and becomes into turbulent
CHAMBER flow. It is further mixed and is transformed into ultra-fine bubble
stream.
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1
SPECIFICATION
Model Dia. Length Material Weight Air capacity per unit Aeration
area per
Upper Lower
Main Skirt unit
Standard limit limit
mm mm Connector Kgs
Unit Unit
R1 m3/min m3/min m3/min m2
125 680 ABS ABS ABS Flange 2.7 1.0 1.4 0.7 6-7
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1
ADVANTAGE OF THE POWERFUL AIR DIFFUSER AERATOR R1
1. No clogging!
2. No sludge deposit, no maintenance!
3. No need for regular cleaning!
4. Lower electricity bill!
5. Easy installation!
Allows installation without draining
wastewater
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1
Diffuser
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 T Dying factory wastewater
JAPAN treatment
Blower, KW 59 kw 37 kw
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 WASTEWATER NEW PLANT
THAILAND AMATA CITY CENTRAL
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 CHOTIWAT TUNA CAN MANUFACTURING
THAILAND WASTE WATER TREATMENT SYSTEM IN
HATYAI
Biological treatment by surface aeration of
the lagoon pond.
Examples of the introduction of the powerful air diffuser Aerator R1
From the surface aeration system of the lagoon pond will be energy- saving air system by AERATOR R1.
It has become a high efficiency of processing performance. It became a significant reduction in
electricity bills.
AERATION TANK
9,000×12,000×5,500H × 4 Tanks
2,376㎥
Aerator R1 15×4 60 Nos.
Blower 27㎥ 33kw 2sets
Electricity fee running cost 132Kw ⇒ 66 Kw 50%
Electric bill will be about half as compared to the
surface aeration
New Aeration system by Aerator R1 (60 No’s) STABLE NO-MAINTENANCE AFTER 6 YEARS
8
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1
THAILAND AERATOR R1 SYSTEM TTW
Bang-pa Industrial WWTP
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 ADITYA BIRLA CHEMICAL
THAILAND (EPOXY) IN RAYONG
It had been using the diffuser of the tube type, It had exchange from obstruction.
High salinity wastewater treatment of the salt concentration of 20%.Wastewater treatment system by
halobacterium. Running smoothly without any trouble from 2012.
⇒
AERATION SYSTEM BY
AERATOR R1 (104 No's) ADITYA BIRLA Chemical(EPOXY) in
BARUCH INDIA
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 INDONESIA MEDAN HIGH-PERFORMANCE
PTPN Ⅱ NEW PLANT PALM OIL WASTE WATER TREATMENT
SYSTEM
Environment technology bilateral cooperation projects The introduction of the waste water treatment system in October 2014
Palm oil factory in Medan Indonesia . BOD500⇒20mg / L
with the JAPAN Ministry of the Environment AERATOR R1 12 Nos. Waste Water Flow: 200 m3/D
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 MALAYSIA SABAH SD PALM OIL FACTORY WWTP
PALM OIL FACTORY NEW PLANT BOD20PLANT
The palm oil wastewater treatment was insufficient treatment in a huge lagoon pond even a few months, but by adopting this
system, it is possible to achieve BOD discharge regulation value of 20 mg /L
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
AERATOR R1 MALAYSIA SABAH BENTWAWASAN PALM OIL FACTORY
PALM OIL FACTORY WWTP NEW PLANT BOD 20PLANT
DO was measured by sending the same amount of waste water and air to
the two aeration tanks of the new wastewater treatment tank
(September 2013) wastewater treatment new facilities of palm Dissolved oxygen value from DO meter There was a remarkable
oil factory Drainage volume 960㎥/D difference inthe numerical value of DO
AERATOR R1 36 Nos.
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
《 Example of introduction in Japan》
Already over 500 companies have been delivered to food factories,
dyeing factories, livestock wastewater, chemical factories, etc.
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
Replacement example from diffuser to AERATOR S1
M Dairy Okinawa Factor
11 Replaced 34 sets of “Aerator S1” from Diffuser
【 Odor removal】
In the diffuser type aeration, malodor was generated due to lack of oxygen
and accumulation of sludge. Therefore, there was a complaint from a nearby
house, and a deodorization hut and an activated carbon adsorption tower were essential. With the
introduction of Aerator S1, there is no accumulated sludge, eliminating the odor problem and
eliminating the need for a deodorizing shed deodorizer.
【 Improvement of biota】
High-efficiency acidity treatment has improved the viscosity, color
and odor of sludge. SV30, which confirms the sedimentation
status, has been greatly improved.(Change from anaerobic state to
aerobic sludge group)
【 Treated water status】
The BOD treatment status has improved, and stable water quality below the river
regulation level has become possible.
【 Energy saving effect 】
The introduction of the aerator S-1 contributes to a reduction in electricity bills by greatly reducing
the blower air volume. Blower air volume 58㎥ / 78kW before introduction → Processing with
about half the air volume is now possible.
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
Replacement example from diffuser to AERATOR S1
Replaced 32 sets of “Aerator S1” from Diffuser
【 Improvement of biota】
Since the introduction of Aerator S1, the processing
capacity has been improved, unstable conditions such
as bulking have been resolved, and after 2 to 3 months
after introduction, the generation of filamentous fungi
has disappeared, the biota has been improved, and the
number of drugs to be introduced has been reduced.
【 Energy saving effect 】
With the introduction of the aerator S1, high efficiency treatment was obtained
due to the improvement of the air diffusion efficiency. In addition, the
reduction in pressure loss has resulted in a significant reduction in electricity
bills, and real depreciation has been achieved one year after
installation.Before introducing the Aerator S1
37 kW 5 units in operation (1 unit INV control)
After installed Aerator S1
37KW 3 units (1 unit INV control 30Hz)
After 6 months Changed to 22kW 2 units
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
Replacement example from diffuser to AERATOR S1
N Food Kanto Factory
Replaced 23 sets of “Aerator S1” from Diffuser
【 Improvement of biota】
After replacing the diffuser type with the aerator S1,
the processing capacity is improved and unstable conditions
such as bulking are resolved. Introduced without draining
liquid every Sunday. N Food Shiga Factory was introduced
in the same way as it has obtained good results.
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
1ST JCM PROJECT IN SOUTHSUMATRA
“ENERGY SAVING INDUSTRIAL WASTEWATER
TREATMENT PROJECT FOR RUBBERINDUSTRY”
IN JULY2015, MOEJ (MINISTRY OF ENVIRONMENT OF JAPAN)
OFFICIALLY AGREEDTO START JCM PROJECT OF “ENERGY SAVING INDUSTRIAL
WASTEWATER TREATMENT PROJECT FORRUBBER
INDUSTRY” AT PT.A FACTORY INPALEMBANG,
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
OUTLINE OF JCMPROJECT
The improvement of AN Industrial wastewater treatment plant
WWTP1 Aerating Tank 3,134㎥ Due to the obstruction of the DIffuser, it was
necessary to change it in 1 - 2 years. Aerator R1 can
Wastewater 4,725 ㎥ /D BOD expect no maintenance for more than 10 years
790mg/L ⇒ 20mg/L
COD 3,305mg/L ⇒100mg/L
BOD-volume-loading 0.7kg-BOD/ ㎥ .D BOD-SS-loading
0.24kg-BOD/kg.MLSS.D Replacement work without draining
drainage
Necessary Oxygen requirement 2,256kg-O2/D Necessary
amount of Aerator 214p WWTP2 Aeration Tank
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
OUTLINE OF JCM PROJECT
Applied technology of aerator
High efficiency aerator draws water mixed with bottom
sludge into the air diffuser (1.3ton/min).
Benefits of aerator
30–50% Reduction of electricity consumption
Maintenance free more than 10 years
No sludge on the bottom of tank (no sludge deposit)
Improvement of sedimentation ability
Reduction of residual sludge
No odor from aeration tank
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control 19
Turnkey Solutions | O& M Services | Research | Training
ONGOING PROJECTS IN INDIA
Solid Waste Management | Water & Wastewater Treatment | Waste to Energy | Bioremediation | Air Pollution Control Turnkey Solutions | O& M Services | Research | Training
CONTACT US
Tel: +91-‐44-‐2363-‐5600
E: info@kankyo.global
Web: www.kankyo.global
KANKYO GROUP OF COMPANIES SUZUKI SANGYO CO LTD