You are on page 1of 39

INTRODUCTION

We thank you very much for giving us an opportunity to be


associated with you. We take a pleasure to present few things over
here…
We are entrusted with this field since last more than 14 years. We
have manifold experience in construction of industrial & corporate
building projects & Interior works. Also we have done many
infrastructure project for industrial & corporate clients.
We have a hardcore experienced & qualified team to take the
challenges in the construction field. We have very good
infrastructure such as office establishment and fully equipped with
modern plant & machineries.
“Our objective is to deliver the quality product in compliance
with the given specifications , well within schedule with the
standard safety norms applicable to the construction
industry.”
Our Philosophy:
We hereby strongly express that
Aditya Constructions is committed
to provide the best engineering
practices by providing good quality
work and timely completion of
project well within schedule as per
specification at the most
competitive rates.
LIST OF OUR PRESTIGIOUS CIVIL PROJECTS
Sr. Nature of work Work Value Name of Client
1 Construction of Heavy Duty Foundation, Admin Building, 1650.00 Lacs INOX Air Products Pvt. Ltd.
Compressor Shed, Special type RE Wall, Land development, Village Vasuli, Tal. Khed, Dist - Pune.
Road work and allied civil work.
2 Proposed Expansion of Mechatronics shop, PEB, HVAC High & 1750.00 Lacs KSPG Automotive India Pvt. Ltd. Village
Low side, Compressor Air, Electrical, Fire and allied works. Takve, Tal.Maval, Dist - Pune.
3 Construction of Plant Building, Extension of Admin Building, UG 1401.00 Lacs Schott Kaisha Pvt. Ltd., Village Anakhi,
Tank, Pump Room, Utility Building, Concrete Road and Drain, Site Jambursar, Bharuch, Gujarat.
Development Works
4 Construction of Factory Building, Compound Wall, HT Plant, 2104.00 Lacs Mahindra Gears and Transmission Pvt. Ltd.
Security Cabin, Utility Building, UG Tank, SWD, Land Village Varale, MIDC Chakan, Tal. Khed,
Development, Road and allied works. Dist - Pune.
5 Construction of Factory Building, Admin Block, Utility Building, 1750.00 Lacs Air Liquide India Holding Pvt. Ltd. MIDC,
UG Water Tank and Pump Room, Retaining Wall, and ACP Chakan, Tal- Khed, Dist- Pune
Sructural Glazing work,
6 Construction of proposed Warehouse PEB Structure, Office block 2200.00 Lacs Transport Corporation of India Ltd.,
and Canteen Building work. M.I.D.C., Chakan, Tal. Khed, Dist - Pune.
7 Construction of Factory Shed, Office Building, UG Tank and Pump 1435.00 Lacs Cogeme Precision Parts (India) Pvt. Ltd.
Room, Concrete Road and allied civil work / ACP Structural M.I.D.C. Chakan, Tal. Khed, Dist - Pune.
8 Construction of Residensial & Commercial Building and allied civil 1365.00 Lacs Sai Dwarka Residency, Dwarka, Nashik.
work, Electrical, Fire Hydrant work.
9 Construction of Utility Block, Entrance Gate, Security Block, 760.00 Lacs Sandvik Asia Ltd., @ Mumbai Pune Road,
Decorative Boundry Wall, ACP and Glazing Work. Dapodi, Pune - 12.
10 Construction of Factory Shed / Paint Shop Building including 655.00 Lacs John Deere India Pvt. Ltd.
allied Civil Foundation work. MIDC Sanaswadi, Tal. Shirur, Dist - Pune.

Continued..
Sr. Nature of work Work Value Name of Client
11 Construction of Under Ground Sump, Pump Room, Electrical, 427.00 Lacs ITC Ltd. (Tobacco Division) @ MIDC
Mechanical and allied works Ranjangaon, Tal. Shirur, Dist – Pune.
12 Construction of Press Foundation, Compressor Room, Canteen 455.00 Lacs Mahindra Forgings Ltd., @ Ambethan, M.I.D.C.,
Building, Heat Treatment Shop, RCC Retaining Wall, Cooling Chakan, Tal.Khed, Dist – Pune.
Water Tank and Misc. foundation and RCC Pipe line work etc.
13 Construction of Ware House Building and allied work. 120.00 Lacs Whirlpool of India Ltd. @ M.I.D.C. Ranjangaon,
(Including PEB) Tal. Shirur, Dist - Pune.
14 Construction of Workshop Building, Office Building, Security 355.00 Lacs Sanghvi Movers Ltd., @ Village - Sate, Tal.
Cabin, Earthwork, Boundry Wall etc. Maval, Dist - Pune.
15 Construction of Machine Foundations, Structural Steel work, 410.00 Lacs Times of India, Pune & Nagpur.
Glazing and partition work, Precast Boundry Wall, Admin
Building Repair, Signage and Culvert + 2nd gate with WBM
Road work.
16 Construction of Press Foundation, Generator Foundation. 270.00 Lacs TATA MOTORS LTD., @ Pimpri, Pune.
Earthwork & Civil work.

17 Construction of Boundry Wall, P& L RCC Hume Pipe Line for 175.00 Lacs TATA MOTORS LTD., @ Chinchwad, Pune.
Sewage / Storm Wate & Industrial Effluent.

18 Construction of Tower Foundation (Overhead & Ground Level), 130.00 Lacs Reliance Industries Ltd., M.I.D.C. Kurkumbh,
Construction of Sludge Drying Bed at ETP, Construction of Daund, Pune.
Boundry Wall, Renovation of Residensial Colony.

ii OM SAI ii
Duration
Work
S.N. Name Of Client In Nature of work
Value
Months
1 Tata Motors Ltd. ( Through SPCL ) 11 Months 670.00 Lacs Earthwork (Cutting & Filling) & Subgrade work.

Skoda Motors Ltd., MIDC


2 4 Months 380.00 Lacs Earthwork (Cutting & Filling) & Subgrade work.
Aurangabad ( Through SPCL )
JCB Manufacturing Ltd.,
3 7 Months 527.00 Lacs Earthwork (Cutting & Filling) & Subgrade work.
Talegaon, Pune. ( Through SPCL )
General Motors India Pvt. Ltd., Earthwork (Cutting & Filling) GSB,
4 6 Months 355.00 Lacs
MIDC Ambi , Pune WBM Road work.
NHAI through Ashoka Buildcon Earthwork (Cutting & Filling), WBM Road Work
5 8.5 Months 325.00 Lacs
Ltd.( Western Bye Pass of Pune ) & Civil work
Cipla SEZ Goa ( Through Ashoka Earthwork (Cutting & Filling)
6 7 Months 430.00 Lacs
Buildcon Limited.) & Allied Work.
Raisoni Industrial Park, Earthwork (Cutting & Filling),
7 9 Months 867.00 Lacs
Hinjewadi, Pune Road Work & Allied Civil Work.
Shree Precoated Steel Ltd.,
8 4 Months 187.00 Lacs Earthwork (Cutting & Filling)
Sanaswadi, Pune
Tata Ryreson Ltd., MIDC ,
9 5 Months 210.00 Lacs Earthwork (Cutting & Filling)
Ranjangaon , Pune.
Fiat India Ltd. , MIDC,
10 3 Months 120.00 Lacs Earthwork (Cutting & Filling) & allied Work.
Ranjangoan ( Through SPCL )
LIST OF OUR PRESTIGIOUS PROJECTS
(INTERIOR WORK)
Sr. Nature of work Work Value Name of Client
1 Office Interior, ACP Glazing, False Ceiling, Electrical 310 Lacs Cogeme Precision Part Pvt. Ltd,
work and Furniture work, HVAC, Landscaping work, MIDC Chakan, Tal. Khed, Dist - Pune.
canteen.
2 Office Interior, False Ceiling, Air conditioning work, 174 Lacs Mahindra Gears & Transmission Pvt.
Electrical work and Furniture work. Ltd. MIDC Chakan, Tal. Khed, Dist -
Pune.
3 Office Interior, ACP Glazing, Electrical, Air 94 Lacs Air Liquide India Holding Pvt. Ltd.
conditioning work and Modular Furniture work. MIDC Chakan, Tal. Khed, Dist - Pune.

4 Office Interior, False Ceiling, Electrical work and 56 Lacs Pricol Limite, Koregaon Park, Pune.
Modular Furniture work.

5 Office Interior, False Ceiling, Electrical work and 120 Lacs Sharma & Associates, Pune.
Modular Furniture work.

6 Office Interior, Auditorium, Conference Hall, 219 Lacs National Chemical Laboratory, Pashan,
Electrical and Modular Furniture work. Pune.

7 Office Interior, False Ceiling, Electrical work and 224 Lacs Amanora Park, Hadapsar, Pune
Modular Furniture work.
" LIST OF WORKS IN HAND "

Name of Site Location Nature of work Schedule Work Value Status

Construction of 11 KVA Cable 1500.00 Lacs 60 % completed


STT Global Data Centre Village Dighi, TCL Premises, Trench, OFC Trench work, STP
4 Months
India Pvt. Ltd. Pune. and allied civil work.
LIST OF PLANT & MACHINERY
No. Make Quantity Remarks
1 Shuttering & Centering Material , Scaffolding material
M.S. Plate, Props, Acro Spans, Steel H Frame with Bracing, Bracing
1.1 Pipe, etc. 7400 m2
1.2 Cup lock System 6700 m2
1.3 Bar Cutting Machine 5 nos.
1.4 Bar Bending Machine 4 nos.
1.5 Concrete Chipper 7 nos.
1.6 Wood Cutter Machine 10 nos.
2 Construction Machinery & Equipments
2.1 Concrete Batch mix Plant - 12 -15 Cum /Hr capacity ( Universal ) 2 Nos.
2.2 Concrete Pump 1 no.
2.3 Concrete Mixer – Universal 15 nos.
2.4 Vibrator with 40 mm & 60 mm Needle – (Electrical / Mechanical) 14 nos.
2.5 VDF Floor Machinery (Tremix) 2 nos.
2.6 Concrete Lift Machine – Universal 3 nos.
2.7 Manlift (Boom Lifter) 2 Nos.
2.8 Water Tanks - 18000 Liters 3 nos.
2.9 Water Tanks - 4000 - 6000 - 8000 Liters 7 nos.
3 Surveying Equipments
3.1 Total Stations of Survey (Trimble - 3603) 2 Set
3.2 Auto Level (Sokia / Nikon Make) 13 nos.
3.3 Aluminium Staff – 5 Mtrs. Long 9 nos.
3.4 Aluminium Staff – 6 Mtrs. Long 6 nos.
LIST OF PLANT & MACHINERY
No. Make Quantity Remarks
4 Transporting Equipments
4.1 Water Tanker / Truck Mounted water Tanker 10000 Ltrs. Capacity 3 nos.
4.2 Tractors (Ford / Mahindra / John Deere) 5 Nos.
4.3 Jeep (Mahindra Bolero / max Pick Up) 4 nos.
4.4 Dumper / Tipper / TATA Hyva ( 10 CUM Capacity ) 5 nos.
4.5 Dumper / Tipper / TATA / AMW Hyva ( 15 CUM Capacity ) 7 nos.
4.6 Tata Dumper ( 5 CUM Capacity ) 4 nos.
4.7 Ashok Leyland Dumper ( 5 CUM Capacity ) 3 nos.
5 laboratory Equipments
5.1 CTM – Cap. 100 Ton Hand Operated 3Nos.
Sieve- 20 cm dia brass , Size- 2.8 mm, 2.36mm, 1.18mm, 600, 425, 300,
5.2 180,150 mic. 5 Sets
5.3 Size – 75, 90 Mic. 2 nos.
5.4 Slump Cone App. With rod & base plate 7 nos.
5.5 Measuring Cylinder – Plastic Cap. 500 Ml. 4 nos.
5.6 Measuring Cylinder – Plastic Cap. 250 Ml. 4 nos.
5.7 Cube Mould – 15 x 15 x 15 cms 30 nos.
5.8 Electronic Weighing Balance ( 60 Kg Capacity with 5 Grams Accuracy ) 3 nos.
5.9 Digital Thermometer – Pen Type , Range – to 300 Degree 4 nos.
5.10 Glass Thermo Meter 3 nos.
LIST OF PLANT & MACHINERY
No. Make Quantity Remarks
6 Excavation, Cutting , Drilling & Compaction Equipments
6.1 Hydraulic Excavator 20 MT Capacity - Poclain JCB / CAT 4 nos.
6.2 Hydraulic Excavator – CAT JCB / JCB / Escorts JCB - 3D 4 nos.
6.3 Hydraulic Rock Breaker - Atlas Krupp 6 no.
6.4 Dozer - D 5 / D 80 2 nos.
6.5 Vibratory Soil Compactor – IR ISD–100 / Escort / Greaves 4 nos.
6.6 Static Roller – (Mayur / Joseph) 8MT-10MT 3 nos.
6.7 Air Compressor – (Atlas Copco) VT6 2 nos.

7 Road Construction Equipments


8.1 Hot Mix ( Drum Mix Type ) Asphalt Plant ( 60 TPH ) - Apollo Make 1 no.
8.2 Paver – Apollo 1 no.
8.3 Asphalt Hot Mixer ( Mini Plant ) 1 no.
MANAGEMENT KEY PERSONNEL
S.N. Name Designation Age Qualification Experience
1 Raman H. Shinde C.E.O. 45 Years B.E.( Civil ) 25 Years
2 Vijay H Shinde Head Operation – Infra Work 35 Years D.C.E. 10 Years
3 Anant Hiray Head Operations & Co – Ordination 44 Years B.E.( Civil ) 23 Years
4 Shivprakash Desai V.P. Projects 52 Years B.E. (Civil) 26 Years
5 Kishor Choudhari Project Co – ordinator 53 Years B.E. (Civil) 27 Years
6 Imam Patel Quality Assurance & Quantity Surveying 42 Years B.E.( Civil ) 21 Years
7 Sunil S Mali GM (Infra) 45 Years B. Com 21 Years
8 Atul Hiray Site Survey & Layout 46 Years D.C.E. AMIE 24 Years
9 Rajendra Jadhav Billing Engineer 34 Years B.E.( Civil ) 9 Years
10 Parag Bhattad Quality & Quantity Engineer 27 Years M.E. (Civil) 3 Years
11 Mahesh Shirke Project Manager 43 Years B.E. (Civil) 19 Years
12 Dnyaneshwar Gole Project Manager 45 Years B.E. (Civil) 24 Years
13 Rajendra Aher Sr. Site Engineer 30 Years D.C.E. 13Years
14 V. R. Shinde Surveyor 41 Years Diploma in Survey 20 Years
15 Ashok K. Kalokhe Accounts & Admin. 42 Years M. Com. 20 Years
16 Suresh S Rasal Manager - H.R. 47 Years M. Com 22 years
17 Dilip B. Gaikwad Earth Moving work Incharge 44 Years D.C.E. 22 Years
18 Sanjay Kalokhe Store Manager 42 Years M A ,MBA 20 Years
19 Datta P. Thorat Manager Purchase 41 Years B. Com MBA 19 Years
20 Gunjan Sinha Safety Manager 35 Years Diploma in EHSC 8 Years
21 Vrushali Hiray Interior Designer 40 Years B Arch 15 Years
22 Priydarshani Burhade Interior Designer 32 Years Interior Designer 10 Years
23 Senior Engineers Site Execution / Project Engineering /Billing 7 Nos. B.E.( Civil )/ D.C.E 5 to 18 Years
24 Site Engineers Site Execution / Project Engineering /Billing 10 Nos. B.E.( Civil )/ D.C.E 5 to 10 Years
25 Junior Engineers Site Execution / Quality Control 15 Nos. B.E.( Civil )/ D.C.E 2 to 3Years
26 Site Supervisors Site Execution 15 Nos. Graduate/H.S.C./ITI 2 to 25 Years
27 Civil Foremen Civil Foremen 10 Nos. Graduate/H.S.C./ITI 3to 22Years
QUALITY POLICY
Aditya Constructions is committed to have stringent Quality Procedures to be
personalized:
•The dedicated & well equipped site laboratory to produce quality
concrete. The details of laboratory equipment attached herewith.
•The earthwork related site tests.
•The quality procedures and check lists to be followed from time to time
irrespective of the tasks.
•The materials procured to be accompanied with Manufacturer’s Test
Certificates and if needed materials will be tested in well equipped ISO –
marked Laboratory as Third Party Inspection.
•To ensure above, we have special tie ups with the Quality Audit Company like
Soiltech India Pvt. Ltd. / Constrologix, which are an ISO 14000 mark.
Aditya Constructions ensures high safety standards towards Safety,
SAFETY POLICY
Environment and Health:
The provision of safety gears such as helmets, shoes, goggles, belts etc.
to workers. Strict implementation of the usage of same is ensured
through the induction programs carried out by safety officer from time to
time to ensure the safe working environment.
Provision of labour hutments with toilet facilities.
Provision of drinking water for labours.
Provision of electricity to labours for their basic needs.
Disposal of construction debris properly to avoid environmental
hazards and helping to cut down on Global warming.
Maintaining the housekeeping in the construction area as well as
Labour campus under control to achieve healthy and safe working
environment.
SITE ORGANIZATION CHART
Project
Director

Project
Coordinator

Project
Manager

Senior Quantity & Stores &


Quality Purchase Safety Officer
Engineer
Engineer officer

Site Engineers Site Junior Engineer Safety Foremen


Assistant
Supervisors

Site Supervisor
Foremen
Cogeme Project @ Chakan, Pune.
Cogeme Project @ Chakan, Pune.
Sandvik Asia Ltd. Project @ Pune.
Sandvik Asia Ltd. –
Utility cum Store Building @ Pune.
TCI Limited Project @ Chakan, Pune.
TCI Limited Project @ Chakan, Pune.
Mahindra Forging Ltd. Utility Building @ Chakan, Pune.
Mahindra Forging Ltd. Canteen Building @ Chakan, Pune.
Whirlpool of India Ltd. Project @ Pune.
Saghavi Movers Ltd. Project @ Pune.
Sai Dwarka Residency @ Nashik.
Sai Dwarka Residency @ Nashik.
Certificate of Special Appreciation
Monogram of Special Appreciation
ADITYA CONSTRUCTION TEAM

Thank You!!!!

You might also like