Directorate General of Highways, Ministry of Public Works, Republic of Indonesia.

INDEKS

INTRODUCTION
INTRODUCTION

WESTERN INDONESIA NATIONAL ROADS


IMPROVEMENT PROJECT
(WINRIP)

Package
Package -- 08
08
PARIAMAN
PARIAMAN –– MANGGOPOH
MANGGOPOH
West
West Sumatra
Sumatra

WINRIP IBRD Loan No. 8043

PT. PP (Persero) Tbk – PT. STATIKA MITRA SARANA


CONSORTIUM
Package - 08 Introduction

PROJECT
PROJECT LOCATION
LOCATION

10Simp. Empat – Simp. Air Balam ( 61, 7 km)


Ending Project
STA 61+700 (SIMP.AIR
BALAM)
WEST Starting Project
SUMATRA STA 0+000 (SIMP.EMPAT)

Ending Project 08 Pariaman – Manggopoh ( 46 km)


STA 46+000 (MANGGOPOH)

Starting Project
STA 0+000 (BTS KOTA PARIAMAN)

12 Kambang – Inderapura ( 55,2 km)


KAMBANG
07 Inderapura – Tapan ( 19,5 km)
KETERANGAN
INDERAPURA
= Package no.
A N
TAP
= Project Location

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


2
Package - 08 Introduction

PROJECT
PROJECT LOCATION
LOCATION

WEST
SUMATRA

Ending Project
STA 46+000 (MANGGOPOH)

Starting Project
STA 0+000 (BTS KOTA PARIAMAN)

PANJANG EFEKTIF PENANGANAN = 46.5 KM

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


3
Package - 08 Introduction

PROJECT
PROJECT DATA
DATA

1. NO PACKAGE 08 (IBRDLoan No. 8043- ID)


2. PACKAGE NAMA PARIAMAN - MANGGOPOH
3. LENGTH 46,5 KM
4. PROJECT LOCATION PROVINSI SUMATERA BARAT (WEST SUMATERA)
Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum,
5. OWNER
Republik Indonesia
6. SOURCE OF FUNDS WINRIP IBRD Loan No. 8043~ID + APBN TAHUN ANGGARAN 2015~2016
7. RETENTION 5%
8. SYSTEM CONTRACT UNIT PRICE
9. ESCALATION EXIST
10. DOWN PAYMENT 10 % NK
11. PAYMENT MONTHLY PROGRESS
12. TIME PAYMENT 28 HK + 56 HK
13. PAGU Rp. 377.319.796.000,-
14. TIME SCHEDULE 720 DAYS
15. TIME MAINTENANCE 730 DAYS
13 Agustus 2015
16. TIME SUBMISSION
Jam 10.00 Wib Time Server (Full E-proc)
17. LATE CHARGE 0.1% OF CONTRACT VALUE / DAY, MAXIMUM FINE OF 5% CONTRACT VALUE

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


5
Package - 08 Introduction

SCOPE
SCOPE OF
OF WORKS
WORKS

NO. WORK ITEM


1 DRAINAGE WORKS

2 EARTHWORKS

3 PAVEMENT WIDENING AND SHOULDERS

4 GRANULAR PAVEMENT

5 ASPHALT PAVEMENT

6 STRUCTURES WORKS

7 REINSTATEMENT AND MINOR WORKS

8 DAYWORKS

9 ROUTINE MAINTENANCE WORKS

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


6
Package - 08 Introduction

MAJOR
MAJOR ITEM
ITEM
Estimate Percentage
No. Uraian Pekerjaan Pareto Unit Unit Price
Quantity (%)
1 Asphalt Tonne 7.598,44 11.002.000,00 25,87%  

2 Asphaltic Concrete (AC – WC) Tonne 28.151,59 469.700,00 4,09%  

3 Asphaltic Concrete (AC – BC) Tonne 42.368,92 468.900,00 6,15%  

4 Asphaltic Concrete (AC – BASE) Tonne 53.996,14 451.300,00 7,54%

5 Asphaltic Concrete (AC – BASE) LEV Tonne 14.603,04 459.900,00 2,08%

6 Aggregate Base Class S Cu.M 28.743,65 385.500,00 3,43%

7 Aggregate Base Class A Cu.M 47.302,91 452.500,00 6,62%

8 Aggregate Base Class B Cu.M 63.443,42 414.900,00 8.14%

9 Aggregate Base Class A Minor Cu.M 292,63 497.500,00 0,05%

10 Aggregate Base Class B Minor Cu.M 417,97 459.700,00 0,06%

11 U Ditch Type DS 5B (With Covered) Ln.M 14.724,00 2.325.100,00 10,59%  

12 Mortared Stone Masonry Cu.M 40.561,56 613.500,00 7,70%  

14 Selected Embankment m3 54.988,41 182.500,00 3,11%

15 Common Excavation Cu.M 184.051,08 43.000,00 2,45%

16 Filler Added – Portland Cement Kg 2.643.273,84 1.300,00 1,06%

17 Reinforcing Steel Plain Round Bars BJTP24 Kg 248.845,80 13.600,00 1,05% 89,99%

18 Other Works Ls 1 32..374.731.394,00 10,01%

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


7
Package - 08 Introduction

EXISTING
EXISTING CONDITION
CONDITION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


8
Package - 08 Introduction

EXISTING
EXISTING CONDITION
CONDITION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


9
Package - 08 Introduction

--
--

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


10
Package - 08 Introduction

--
--

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


11
Package - 08 Introduction

TECHNICAL
TECHNICAL DATA
DATA

CL

250 100 200 150 NO URAIAN KET


Jalan Eksisting Widening Bahu Jalan Drainase 1. Lebar Jalan Eksisting 5.00 m
(Tipe A)
2. Lebar Jalan Rencana 7.00 m

3. Sisi Pelebaran Kanan & Kiri

4. Bahu Jalan 2.00 m

5. Drainase 1.50 m

6. Timbunan Pilihan 15 cm

7. LPA Klas B 20 cm

8. LPA Klas A 15 cm

9. AC Base 7.5 cm

10. AC-BC 6.0 cm

11. AC-WC 4.0 cm

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


12
Package - 08 Introduction

TECHNICAL
TECHNICAL DATA
DATA

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


13
Package - 08 Introduction

CROSS
CROSS SECTION
SECTION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


14
Package - 08 Introduction

CROSS
CROSS SECTION
SECTION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


15
Package - 08 Introduction

CROSS
CROSS SECTION
SECTION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


16
Package - 08 Introduction

CROSS
CROSS SECTION
SECTION

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


17
Package - 08 Introduction

DRAINAGE
DRAINAGE

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


18
Package - 08 Introduction

TYPICAL
TYPICAL RETAINING
RETAINING WALL
WALL

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


19
Package - 08 Introduction

GREEN
GREEN CONSTRUCTION
CONSTRUCTION PRACTICES
PRACTICES

As per the Environment Management Plan that the consortium will implement on the Project, the following chart presents the cycle of undertaking the
green construction practices:
In principle, the consortium will undertake the following green
construction practices in order to reduce CO2 emissions and to have the
least impact on the environment at the Project site area.
Baseline
identify
identify and
and quantify
quantify
environmental impact
impact A. Maintaining a green environment on site:
environmental
• Preserve trees and shrubs in areas that are not meant
for clearing and areas adjacent to the Project construction
Action plan areas.
Review
develop
develop an
an action
action plan
plan to
to • Protect against and prevent wild fires.
continuosly
continuosly improve
improve improve
improve environmental
environmental
environmental
environmental performance
performance onon the
the • Protect against dusts, smoke and fumes.
performance
performance for
for the
the Project and to address
duration of the Project
environmental impacts • Plant trees around Contractor’s facilities during
construction and complete landscape as per the Contract
requirements after work completion.
B. Rainwater runoff, water re-use, and water usage:
• Collect rainwater runoff in settlement ponds and
Monitor
reuse water after filtration in construction
the
the action
action plan
plan in
in terms
terms
of the success of activities; i.e. watering for dust control, watering of plants,
implentation in creating Implement the
improvements
improvements inin action plan etc.
environmental
environmental
performance
performance against
against the
the • Filter used water before discharging it into waterways.
baseline.
• Minimize water usage and conserve it.
• The consortium will not discharge any chemicals,
toxins, spoils, waste, debris, etc… into the waterways.
• Installation of water meters.
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT
20
Package - 08 Introduction

Green
Green Construction
Construction Practices
Practices

C. Saving Water Consumption • Follow an energy-saving code of conduct for the use of office
• Use of Automatic Faucet (Water saving Device) equipment (lights, television, computer etc.)
• Installing efficient appliances • Set the air conditioners air temperature to 25 ° (+/-1).
• Installation of awareness signs and stickers; ex: "Reduce • Where possible, use light sensors for lighting areas at night.
Water Use", “Do not leave faucet open”, etc. • To measure the intensity of light (+/-250 Flux/appropriate
• Use low flow shower facilities, no bath tubs will be provided. provisions).
• Use low flush toilets. • Operate heavy equipment and plants efficiently; minimize idle
• Use auto shut off taps / tap controls / infra-red switches. time and use appropriate power.
D. Recycled water usage • Using more fuel efficient vehicles.
• Plan work dewatering • Reduce the distance travelled.
• Recharge wells • Increase the utilization rate of vehicles: increase the average
• Ground water level gauge (Piezometers) load carried on each vehicle without compromising safety.
• Reuse collected water after filtration (settlement pond or • Increasing driving efficiency through driver behavior, follow
otherwise) in construction activities; i.e. watering for dust speed limits and/or other engine control units, if possible.
control, watering of plants, etc. G. Controlling the use of energy sources that have an impact on the
E. Monitoring and electricity consumption record environment
• Install KWH meter. • Perform vibration measurements to ensure adherence to legal
• Monitor electricity consumption per month and implement limits.
energy saving measure to reduce it. • Perform noise-level tests to ensure adherence to legal limits.
F. Saving Fuel and Energy Consumption • Provide Absorbent B3 for toxic material storage.
• Control generators to meet only current electricity needs • Ensure that all vehicles and heavy equipment has passed
• Avoid unnecessary night time site and accommodation regulated inspections for exhaust emissions in accordance to
lighting Indonesian regulations.
• Utilization of sunlight for lighting (optimization of design and
layout of temporary facilities and site accommodations).

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


21
Package - 08 Introduction

Green
Green Construction
Construction Practices
Practices

H. Waste management during construction J. Promotion of Green Construction Program


• Provision of construction trash collection, sorting and • Use leaflets and signs to alert and educate staff and workers
transport. to the importance of following green construction practices.
• Waste separation according to type: recyclable (glass, metal, • Use the Health, Safety and Environment (HSE) trainings to
wood, etc…), organic, and non-recyclable around the project educate staff and workers on the importance of green
works locations, buildings and facilities. construction.
• Cooperation with waste collector for efficient collection and • Place a “3 R” symbol label (Reuse, Reduce, and Recycle) on
recycling of waste. construction helmets.
• Monitor waste management on site and amend to ensure the • Erect boards with Green Slogans.
least impact on the environment. • Insert Green Construction requirement clause in the contract
I. Encouraging waste reduction, thus reducing the burden of landfills with vendors and suppliers.
• Use food catering system (minimize waste) at the canteens • Use vendors and suppliers that are certified with EMS (ISO
• Use refilled drinking water 14001).
• Use of paper bags and degradable plastics K. Using local and old buildings recycled materials to reduce the use of
• Provide concrete mold for waste overflow new materials
• Utilize the remaining pieces of iron rods<1 meter • Use of Temporary Facility (Long Life Cycle).
• Make LRB (Hole Infiltration Biopori) • Use old demolition waste materials, if possible.
• Avoid the use of beverages bottled in plastic. Use only tin L. Implementing Environment friendly production process
cans because it is recyclable. • Increase the use of pre-fabricated materials.
• Reuse suitable excavated materials for refills and temporary • Use recycled materials where possible.
works. • Use legally certified timber.
• Use local materials procured from within +/- 800 km.

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


22
Package - 08 Introduction

Green
Green Construction
Construction Practices
Practices

M. Reduce Impact of Cigarette Smoke Following are samples of PT PP’s green construction practices that have
• Place "No Smoking" signs in the site offices and facilities. been implemented successfully on its projects in Indonesia since 2008.
• Install “No Smoking” signs in work areas.
• Providing designated smoking areas near the offices and
facilities and works areas.
• Use the HSE training to encourage staff and workers to quit
smoking.
N. Maintaining Cleanliness and Convenience
• Use safety nets (to reduce dust)
• Water excavated surfaces, access roads and top soil cleared
area to reduce dust
• Providing washing bays for vehicle tires (if needed)
O. Reducing Pollution Chemical Substances hazardous to health.
• Asbestos materials will not be used
• Mercury lamps will not be used
• Styrofoam will not be used

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


23
Package - 08 Introduction

Green
Green Construction
Construction Practices
Practices

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


24