You are on page 1of 10

Presentation on

Development
of
Timetable Generation System
[ATGS]
Timetable Generation System
[ATGS]
Flow of Data Within Project
• Collect data from
data store
• Initialize Timetable
• Perform Allocation
• Generation of
Timetable
• Formatting of
Timetable
Project Flow

Stage-I Stage-II

1. Design
1. Literature Survey
• Knowledge Base
• Timetabling Algorithms
Design (XML)
• Search for existing
• GUI Designing
applications
2. Implementation
2. Analysis
• GUI Coding
• Requirement of Project
• Main Timetable
• Flow of project
Generator Coding
3. Planning
• Export to HTML
It Consist Of Scheduling Of Lectures And Rooms

Based On Strong Constraints and Weak Constraints in given Time Slots

Strong Constraint

A classroom is not assigned to more than one lecture at the same time.

Weak Constraint

There should be break after 2 hrs

A teacher can take maximum 3 lectures a day


Teachers List Subjects List Rooms List

ARS DSP
R1
SSC ADMP
R2
SRP IS
R3
SMV MC
R4
SHB SE

Time Slots List Years List Days List


8:30-9:30
Mon
. I
Tue
. II
Wed
2:30-3:30 III
Thu
3:30-4:30 IV
Fri
4:30-5:30
Constraints Matrix
Teachers List Subjects List Rooms List

ARS
DSP R1
SSC
ADMP R2
SRP
IS R3
SMV
MC R4
SHB

Time Slots List Years List Days List

8:30-9:30 Mon
. I Tue
. II Wed
2:30-3:30 III Thu
3:30-4:30 IV Fri
4:30-5:30
Project Demonstration
Timetable Generation System
Timetabling The Stress Free Way !

Thank You !

You might also like