• After booking stage and after accounts verifying. (M)
• Stage to go ASM, (M) • ASM will assign PM, (M) • PM Will do the needful and upload pics of lms • Then PM will complete the stage.(M) • Once PM completes stage it should go to designer • After design at revision stage , • again it should go to asm , (M) • asm will assign a PM, (M) • and PM will do needful and upload photos and completes • Once pm completes it should go to Design review (M) • Once packing stage is completed (M) • Again – ASM (M) – PM – Upload Photos of FSI and then complete (M)– Balance payment collection • Once dispatched , again it will go to asm (M)
• ASM will assign PM then PM will complete later all stages (M at last stage) • Between Raw material availability and packing • Production • Stage 1 Stage 2 • Stage 3 • Stage 4 • Stage 5