You are on page 1of 10

What I have learnt this year

What I learnt?

 Shifted old MDF (500 Lines) with New MDF (1000 Lines)installed in ISD’s
Server Room
 Up gradation of existing PNRA’s Network infrastructure and design
 Read Only Domain Controller (RODC)
 Optical Fiber Professional Course
MDF Replacement in ISD’s Server Room

 Installation of 20 Pairs armored voice cables for 4th and Ground floor of PNRA’s old
building.
 Installation of New MDF and 100 Pairs cables from Exchange MDF to New MDF.
 Installation of Krone Strip and punching of cables.
 Tagging and color coding scheme.
 Tracing and Troubleshooting.
Exchange Room
BEFOR NOW
E
Up gradation of PNRA’s existing Network
(shifting to VLAN)
 Port Tagging of end user network points against port switch assigned in Access
switch on each floor of PNRA head office.
 Up gradation of unmanaged switches with manageable Cisco switches WS-c2960
.
 What is Vlan and how to create vlan?
 VTP ( VLAN Trunk Protocol) and VTP Pruning.
 Access Port and Trunk port
 Basic configuration of Network equipment.
Fiber Optics Professional
 What is Fiber Optic and different types of Fiber Optic
 Single Mode FO (1550nm, 1310nm)
 Multi Mode FO ( 850nm)
 SPLICING/JOINTING
 Indoor ( Tight Buffer cable)
 Outdoor ( Loose Buffer Cable)
 Different Type of Connector
 FC, LC and SC
 Fault Testing Equipment
 VFL
 OTDR
 Power Meter
 JOINT BOX
 OPTICAL NETWORK TERMINAL (ONT) SPLICING
Read Only Domain Controller

 INSTALLATION
 CONFIGURATION
 WORKING MECHANISM
Other Activities
 Conducting the video conferencing
 Maintaining server backup
 Maintaining the Data base of PNRA employees i.e. IP Address, Email account
and Domain ID
 Creating Email/Domain accounts
 Installation of Antivirus
 Helping in store to maintain the record
 Troubleshooting's
 Helpdesk Tasks
THANK
YOU

You might also like