Professional Documents
Culture Documents
Presentation
Presentation
What I learnt?
Shifted old MDF (500 Lines) with New MDF (1000 Lines)installed in ISD’s
Server Room
Up gradation of existing PNRA’s Network infrastructure and design
Read Only Domain Controller (RODC)
Optical Fiber Professional Course
MDF Replacement in ISD’s Server Room
Installation of 20 Pairs armored voice cables for 4th and Ground floor of PNRA’s old
building.
Installation of New MDF and 100 Pairs cables from Exchange MDF to New MDF.
Installation of Krone Strip and punching of cables.
Tagging and color coding scheme.
Tracing and Troubleshooting.
Exchange Room
BEFOR NOW
E
Up gradation of PNRA’s existing Network
(shifting to VLAN)
Port Tagging of end user network points against port switch assigned in Access
switch on each floor of PNRA head office.
Up gradation of unmanaged switches with manageable Cisco switches WS-c2960
.
What is Vlan and how to create vlan?
VTP ( VLAN Trunk Protocol) and VTP Pruning.
Access Port and Trunk port
Basic configuration of Network equipment.
Fiber Optics Professional
What is Fiber Optic and different types of Fiber Optic
Single Mode FO (1550nm, 1310nm)
Multi Mode FO ( 850nm)
SPLICING/JOINTING
Indoor ( Tight Buffer cable)
Outdoor ( Loose Buffer Cable)
Different Type of Connector
FC, LC and SC
Fault Testing Equipment
VFL
OTDR
Power Meter
JOINT BOX
OPTICAL NETWORK TERMINAL (ONT) SPLICING
Read Only Domain Controller
INSTALLATION
CONFIGURATION
WORKING MECHANISM
Other Activities
Conducting the video conferencing
Maintaining server backup
Maintaining the Data base of PNRA employees i.e. IP Address, Email account
and Domain ID
Creating Email/Domain accounts
Installation of Antivirus
Helping in store to maintain the record
Troubleshooting's
Helpdesk Tasks
THANK
YOU