8.2.2.

Construcciones e instalaciones
Materiales requeridos Corto Plazo Mediano Plazo Largo Plazo
Concepto Precio Unidad Cantidad Total S/ Cantidad Total S/ Cantidad Total S/
Cemento 20.00 Bolsas 300 6,000.00 450 9,000.00 800 16,000.00
Tabla 5.00 Unid 100 500.00 200 1,000.00 250 1,250.00
Piedra 50.00 Unid 8 400.00 10 500.00 15 750.00
Hierro 1/8 40.00 Unid 5 200.00 6 240.00 8 320.00
Varilla 10 lineas 35.00 Unid 15 525.00 16 560.00 18 630.00
Ceramica 10.00 Paquetes 30 300.00 50 500.00 60 600.00
Arena 40.00 Unid 8 320.00 10 400.00 20 800.00
Ladrillos 2.00 Unid 800 1,600.00 1000 2,000.00 1200 2,400.00
Malla 30.00 Unid 12 360.00 - - - -
Calaminas 100.00 Unid 1 100.00 - - 2 200.00
Alambre 2.50 Metros 100 250.00 150 375.00 180 450.00
Clavos 3' 15.00 Bolsa 1 15.00 3 45.00 3 45.00
Cable 1.20 Metros 600 720.00 800 960.00 850 1,020.00
Focos 1.00 Unid 50 50.00 30 30.00 20 20.00
Tomacorrientes 2.00 Unid 50 100.00 40 80.00 20 40.00
Interruptores 1.50 Unid 20 30.00 15 22.50 10 15.00
Tubos PVC de 4' 4.00 Unid 20 80.00 40 160.00 50 200.00
Satinizacion 200.00 Unid 1 200.00 1 200.00 1 200.00
Mano de Obra 10.00 Unid 500 5,000.00 600 6,000.00 650 6,500.00
Inodoro y Lavado 120.00 Unid 3 360.00 4 480.00 3 360.00