What is impact It is central impact SQL database. Database is in cloud -Database is separated into design and detailing parts.
-You can create precast elements
through different functionalities such as AutoCAD, Bricscad. Also, in Revit.
-You can bring models from
Tekla. Also, create IFC and xml files. Rough Agenda
• Design part - Modelling of Hollowcore
• Calculations connections to PRE-Stress • Rough and fine planning including Erection, Storage, Transport and Cast • IMPACT Go for IOS and Android • Q&A?
• Duration approximately 1 hour
Impact Project Manager • Create New Project Impact Project Manager Create Drawing in Floor Plan Open in BricsCAD/AutoCAD Insert Architectural Plan How to Work Hollow core Commands Draw Hollow cores Add Recess Draw Hangers details Add Endcaps Insert Lifts Mirror Hollow cores Save Hollow cores Shop Drawing Generate Shop Drawing Open Shop Drawing In shop Drawing Plan and Section with CIM & Recess Details Model in Impact Project Manager Rough and Fine planning of Hollowcore
• IMPACT enables a complete overview of your project and planning
resources. It also incorporates planning of cast, stack, and transport planning with element status, which allows for complete control of the progress and easy tracking of each project and/or element. Build your factory with cast units, storages, stacks and transport vehicles. Erection Planning • Erection sequence according to requirement of Client / Contractor who needs the infomation Insert a Crane • We choose to insert a crane to control the lifting capacity of all elements we draw. • All elements that drawn will be checked against the crane’s capacity Simulate the Erection sequnce
• Check the desired Erection sequence
Cast Planning • Through IMPACT Cast Planning module, elements can be assigned to cast units (beds, tables or pallets). • There are two different views where we can insert the element: • Calendar view and Detailed View Stack Planning • The basic idea behind the stack module is to enable the user to stack their elements so that these stacks can be prepared to be loaded onto a truck. • The Stack Planning module enables the user to define how the elements are to be stacked. IMPACT Go for IOS and Android • This is amazing feature of Impact • Using Impact Go application on Android and IOS • Scan the QR tag and access the android /IOS • Set the storage location. Element control from anywhere Transport Planning • The Transport Planning module is where transports are planned and monitored. • Transport planning does not require the use of stacks before planning the elements on transport. However, stacking elements before loading them onto a transport can have definite benefits in many cases Thank You