Professional Documents
Culture Documents
Fdocuments - in - Leed India Case Study Cii Sohrabji Godrej Itc Green Center
Fdocuments - in - Leed India Case Study Cii Sohrabji Godrej Itc Green Center
CERTIFICATION
Independent third party verification that the building project meets highest
performance standards.
SPECIFIC PROGRAMS
LEED India for New Construction
Design of commercial buildings-hotels, institutions, services
Under the direct control of the owner or developer
LEED India for Core and Shell
Design of core and shell buildings-leased or rented spaces
Not completely under the direct control of the owner or developer
LEED India Green building
LEED Points overview
Sr. Criterions Points Points
no:
3 Water Conservation 18
4 Energy Efficiency 28
TOTAL 100
SUSTAINABLE SITE
Outlines various “green” opportunities for reducing the negative impact the
building has on the environment.
The opportunities range from
Preventing erosion of top soil,
:Preventing water contamination & creation of heat islands,
Effective use of a barren or waste lands etc.
40% of the carbon dioxide that contributes to our warming planet comes from
buildings.
Some of it is a secondary effect of operational needs such as electricity, a/c, and
heating, many ghg’s arise from resource extraction, manufacturing and production
of the building materials themselves.
Choosing ingredients wisely makes all the difference in terms of the overall
impact of the building throughout its life. -‘Environmental footprint’ or ‘life cycle
assessment’
The materials are in the picture from the first round of planning to the final stages
of demolition or renovation of a building or product.
Credit: Resource Reuse
Intent :
Reuse building materials and products in order to reduce demand for virgin
material and reduce waste, thereby reducing impacts associated with the
extraction and processing of virgin resources.
Requirements :
Use salvaged or refurbished materials for 5-10% of building materials (by value)
Methods suggested like, reuse of partition panels,broken tiles,Used carpets.
(Note : Movable furniture like chairs are not accounted for calculation)
Requirements:
Use rapidly renewable building materials and products (made from plants
that are typically harvested within a ten-year cycle or shorter)
for 5% of the total value of all building materials and products used in the
project.
Consider use of materials such as bamboo, wool, cotton insulation,
agrifiber, linoleum, wheat board, strawboard and cork.
Indoor Environmental Quality
Relative Humidity
Economical
Energy-saving
Environmentally-friendly
Sustainable development.
Sohrabji Godrej Green
Business Centre in
Hyderabad. It’s a
commercial building which
consists of office
buildings, research labs
and conference rooms
GREEN BUSINESS CENTER
Wind Towers
Water Body
Roof garden
Solar PV
Water Efficiency
Sustainable Site
Energy Efficiency
Materials & Resources
Indoor Environmental Quality
Formation of positive and negative pressure zones when wind flows around
rectangular and circular bodies.
The pressure coefficient cp can be used with the wind velocity to calculate
positive and negative pressure loads.
Green Building Tour
Central courtyard.
Rain water
Rain
water
seeps in Water
the utilized
openings for the
. plants
inside.
Solar
Photovoltaic
The solar panels are placed on the
eastern side and they are sloping
which helps production of energy
throughout the day and as it is a
commercial building more amount of su
nr
energy is consumed during the ay
s
working hours [day] compared to
the evenings.
Solar
panel
Wind System
Wind tower with evaporative cooling
Due to the unpredictable wind direction, opening on all four sides are provided with an additional
affect due to wind pressure. The rate of heat transfer mainly depends on surface area with
which, the air comes in contact. Here the surface area is increased by having vertical conduits,
which gives less resistance to air flow. Further, the effectiveness is increased by having
sprinklers to promote the evaporative cooling
Wind Deflectors
Consider healthy lighting, color and sound, controlled temperature and humidity and
good indoor air quality to enhance the living environment
Apply an integrated wiring system for lighting, power, security, fire alarm and audio
facilities.
Vegetation that was lost to the built area was replaced by gardens on 55
percent of the roof area.
www.igbc.in
www.climatechange.thinkabout.edu
www.hydro.mb.ca
www.Wikipedia.com
www.igbc.in
THANK YOU
Arjun #6
Lala # 12
Rishan # 18
Nimisha # 24
Rajiv # 30
Sneha # 36
Twinkle # 39