- Partial excavation from Grid Line 12 and Shoring Installation
- Shoring is partial with IWF 100 x 50 and wooden 30 x 200 - One section/span for partial excavation and shoring = 12000 mm and continue for RC wall work (rebar, formwork and concrete) - Spare soil from wall existing (bak aerasi) to Edge shoring
- Partial Shoring Installation with IWF (100 x 50 x 5 x 7) and wooden 30 x 200
- IWF Installation for shoring method use existing excavator PC 130 - One section/span for partial excavation and shoring = 12000 mm and continue for RC wall work (rebar, formwork and concrete) - Spare soil from wall existing (bak aerasi) to Edge shoring - Shoring method just for construction RC wall beside (bak aerasi)