You are on page 1of 20

Hydraulic Mining Shovel

6040AC (e-drive) with CAMP/SIL and BCS4

11. Cylinders

Matthias Aust - 2014


Overview: Cylinders Service Training

FACE
SHOVEL
STICK

CYLINDER

BOOM

STICK CYLINDER
BOOM
CYLINDER
CYLINDER BACK HOE

BUCKET
BUCKET
CYLINDER
CYLINDER

CLAM

CYLINDER

2
Examples: Cylinder Head Pieces Service Training

3
Cylinder Head Assembly Service Training

1. Clean all parts.


2. Screw headpiece on cylinder rod until the rod end gets contact (3) 2 1
with the headpiece. If necessary use a small wedge to open the
slot slightly.
3. Unscrew headpiece 15°to 30°to get a bit clearance between
headpiece and rod.
4. Apply Sealing Compound (Sikaflex®) in the slot and on the thread
area between rod and headpiece to avoid moisture enters the
thread.
5. Torque bolts for specification in below table in sequence 1 - 2 (3).

Hexagon Bolts Din-EN Dodecagon Bolts


24014 and 24032 O&K Norm

Size Size

Sealing Compound (Sikaflex®)

(3) 2 1

All specifications valid for Bolt quality 10.9

M 195 x 3
4
Cylinder Head Assembly Service Training

1. Clean contact surfaces.


2. Insert dowel pin in head piece.
3. Screw nut on cylinder rod and position
headpiece on rod.
4. Take care of clearance between nut and headpiece.
5. Preassemble bolts.
6. Insert O-ring between headpiece and nut.
7. Torque bolts hand tight and check for similar
clearance all around.
8. Torque bolts in three stages crosswise stage by stage.
9. Cover exposed threads with sealing compound.

Sealing Compound (Sikaflex®)

Clearance: 1,5 – 3mm

Bolt Quality: 10.9 Wrech Size for Dodecagon Bolts!

Size M 14 M 16 M 18 M 20 M 22 M 24x2 M 27x2 M 30x2


Wrench size [mm] 15 19 22 24 27 30 32 36
MA [Nm] 1st Stage 65 110 135 200 225 335 570 850
MA [Nm] 2nd Stage 100 170 210 315 460 580 890 1350
MA [Nm] 3rd Stage 130 215 270 400 550 770 1135 1700
RH 340B Boom Cylinder

5
Assembly Procedure Service Training

6
Rod Sealing Types Service Training

Low Pressure Sealing High Pressure Sealing

Low Pressure Sealing High Pressure Sealing

7
Sealing between Guide and Cylinder Tube Service Training

Support Ring and O-Ring

8
Piston Sealing Service Training

Polyamid slipper ring with pre tension element

9
6040 FS – Boom Cylinder_#170088 Service Training

10
Boom Cylinder – Head Section Service Training

3x Phenolic
Resin / Cotton

1x Sealing 1x O-Ring with


High Pressure Support Ring

1x Dust 1x Sealing
Scraper Low Pressure

11
Boom Cylinder – Foot Section Service Training

1x Sealing

2x Phenolic
Resin / Cotton 2x Cast Iron

2x Teflon/Bronze

12
6040 FS – Boom Cylinder_#170088 Service Training

13
6040 FS – Stick / Bucket Cylinder_#170088 Service Training

14
6040 FS – Stick / Bucket Cylinder_#170088 Service Training

15
6040 FS – Clam Cylinder_#170088 Service Training

16
6040 FS – Clam Cylinder_#170088 Service Training

17
Dampening System – Extending Service Training

18
Dampening System – Retracting Service Training

19
More Information? Service Training

Hey Fellows,

Please find more Information


in the Technical Handbook!

Chapter 8.8: Hydraulic Cylinders

20

You might also like