You are on page 1of 25

Chapter 2:

Fundamental Cost Concepts


成本基本概念

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Objektif:

Untuk menganalisis alternatif


当钱和
jangka pendek apabila nilai masa 决定因
替代方
wang bukan lagi faktor penentu.
To analyze short -term alternatives when the time value of money is no
longer the determining factor.

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Kos boleh dikategorikan dalam beberapa
cara yang berbeza.
Costs can be categorized in a number of different ways.
• Kos tetap (Fixed cost): tidak terjejas oleh perubahan di tahap 不受活
aktiviti not affected by changes in activity levels

• Kos berubah-ubah (Variable cost): berbeza-beza dalam setiap


jumlah dengan kuantiti output masing2
每个量

varies
• Kos in each volume
tambahan with thecost):
(Incremental respective outputunit
tambahan quantity
kos akibat
penambahan sistem output oleh satu unit (atau lebih)

由于一
导致的
additional unit costs due to the addition of system output by
one unit (or more)
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Konsep Kos
KONSEP KOS
(Berkaitan dengan Teori Kos Pengeluaran)
Kos Sosial (Social Cost) Costs
Kos Tunai (Cash Cost )
Kos yang ditanggung negat
oleh masyarakat akibat devel
ments. kos yang melibatkan kesan negatif yang
pembayaran wang 由于
用。 tunai. wujud daripada
perkembangan aktiviti 的负
ekonomi 本
Kos Eksplisit ( Explisit Cost)
Jumlah wang
yang
of money spent by producers
dibelanjakan oleh
ctors of production in the process pengeluar kerana
g goods and services menggunakan faktor
产品和服务的过程中利用生产要素 pengeluaran dalam
proses mengeluarkan
barang dan perkhidmatan

Copyright
4 ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Konsep Kos
KONSEP KOS
(Berkaitan dengan Teori Kos Pengeluaran)

Kos Buku (Book cost) Kos Hangus (Sunk Cost)


actions Costs
stem. kos yang tidak Kos yang tercipta pada be ta
melibatkan urus niaga masa lepas dan tidak
到的成本。 decis
boleh diambil kira semasa
tunai tetapi dapat dilihat
membuat keputusan pada
dalam sistem masa hadapan 成本是
perakaunan.
Kos Implisit (Implisit cost)

exist due to using own production Kos yang wujud kerana


he process of producing goods and menggunakan input
pengeluaran yang
dimiliki sendiri dalam
商品和服务过程中使用自己的生产投
proses pengeluaran
成本
barang dan
perkhidmatan
Copyright
5 ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
LEBIH BANYAK CARA UNTUK
MENGKATEGORIKAN KOS MORE W

• Langsung ( Direct): boleh diukur dan


Direct: ca
diperuntukkan kepada aktiviti kerja tertentu specific wo
• Tidak langsung (Indirect): sukar untuk 直接:可以衡
Indirect:
mengaitkan atau memperuntukkan kepada outputparticular
tertentu atau aktiviti kerja (juga overhed atau overhead
间接的:难以
beban) 作活动(也包

• Kos Standard : kos seunit output, wujud di awalStandard


existing a
pengeluaran atau perkhidmatan service
标准成本:在
单位产出的
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Konsep Kos
KOS TETAP (FC)

Kos Tetap (FC)


ry and
manent Contoh: bayaran faedah, sewa, TOTAL COST
FC
ents susut nilai kilang serta alat

Jumlah Kos (TC)


kelengkapan, insurans, gaji
,保 TC
pekerja tetap dan bayaran
kemudahan asas Jumlah Keluaran (Q)

Kos Berubah (VC)


+ =
and KOS BERUBAH (VC) VC
labor Jumlah Keluaran (Q)
Contoh: kos bahan mentah
产工 dan barang perantaraan, serta
TC = FC + a VC
upah buruh langsung seperti
operator pengeluaran Jumlah Keluaran (Q)

Rajah 1B.2 Jenis Kos dan Keluk Kos

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Hubungan Umum : Harga - Permintaan

Permintaan bagi produk atau Demand for


perkhidmatan secara to its price a
is demand, a
langsung berkaitan dengan a particular
harganya mengikut p = a-BD
根据 p = a-BD
di mana p ialah harga, D 相关
permintaan, dan a dan b •p 是价格
adalah pemalar yang •D 是需求
•a 和 b 是取决
bergantung kepada produk
atau perkhidmatan tertentu.

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
TOTAL REVENUE (TR)
总收入

TR = price x demand
= pD
= (a – bD)D
=

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Jumlah pendapatan bergantung kepada
mand. harga dan permintaan.

ice Jumlah pendapatan adalah produk harga jualan


)
乘积
seunit (p) dan bilangan unit yang dijual (D)

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
微积分
Kalkulus boleh membantu menentukan Calcu
permintaan yang memaksimumkan hasil. deman

TR = aD – bD2

Penyelesaian, permintaan
optimum ialah

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
TOTAL COST

TC = FC + VC
@
CT = CF + CV
= CF + cvD

Where;
CF = Fixed cost
CV = Variable cost
= cv(D)

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Konsep Untung dan Rugi
copyright @ mia

 KEADAAN SUATU FIRMA


RM
(TC) = Total Revenue (TR) – Total Cost (TC) Untung
Titik Pulang Modal TR

 KEPUTUSAN Rugi TC
 TR > TC : UNTUNG A
 TR = TC : PULANG MODAL
FC
 TR < TC : RUGI

0 Q0
Jumlah Keluaran

Rajah 1B.3 Untung dan Rugi Suatu Firma

Chapter 1B - Konsep dan Kegunaan Copyright


13 ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth EditionKos Pengeluaran
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
With that, we can also find maximum profit ...
Dengan itu, kita juga boleh mencari
keuntungan maksimum ...
Keuntungan adalah pendapatan tolak kos:

Profit = total revenue (TR) - total cost (TC)


= - CF + cvD

Di mana,

Nilai Keuntungan Max, D:

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
BREAKEVEN POINT
(Titik Pulang Modal)

Total Revenue (TR) = Total Cost (TC)


= CF + cvD

= 0
Bila, Jumlah pendapatan = Jumlah Kos.
So, dapat ditentukan bahawa permintaan berlaku apabila;

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Dua tugas utama yang terlibat dalam 成本
pengoptimuman reka bentuk yang didorong Two
-dri
oleh kos.

1. Tentukan nilai optimum bagi satu-satu rekabentuk alternatif


1.
yang tertentu.
2. Pilih alternatif terbaik, di mana masing-masing dengan nilai 确定
yang tersendiri bagi pelbagai reka bentuk.
2.

Model kos akan wujud pada satu-satu rekabentuk, X. 选择


其自

Ac

成本
Copyright ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
cost terminology
• Kos Peluang (Opportunity cost) : kelebihan Opport
advant
kewangan yang ada terpaksa diketepikan resourc
disebabkan sumber yang terhad. 机会成本
势。
学生,但选 Pertimbangkan seorang pelajar yang boleh mendapat S20,000 untuk bekerja selama Consider
学生。 机会 setahun, tetapi memilih untuk pergi ke kolej selama setahun dan menghabiskan S5,000 but choos
于不可接受 untuk berbuat demikian. Kos peluang untuk pergi ke sekolah untuk tahun itu adalah do so. Th
S25,000 (pengeluaran tunai S5, 000 dan S20,000 untuk pendapatan tidak dapat S25,000 (
这 个数字 diterima). Angka ini mengabaikan pengaruh cukai pendapatan dan mengandaikan
unaccepta
生在学校学 bahawa pelajar tidak mempunyai keupayaan pendapatan ketika di sekolah. income ta
to earn wh

• Kitaran hayat kos (Life-cycle cost) : Life-cy


penjumlahan dari semua kos yang berkaitan associa
structu
dengan produk, sistem, struktur, atau
生命周
perkhidmatan semasa hayatnya 其生命

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Kitaran Hayat
copyright @ mia

PROJECT Yes PRE DETAILED


FEASIBILITY

NEED STUDY DESIGN DESIGN

P1 P2 P3
Fasa Perolehan No
PROJECT POSTPONED OR
CANCELED P4

Fasa Operasi dan Senggaraan

O&M CONSTRUCTION

Notes Fasa Pelupusan


P1 : Consultant for conclude the project need
P2 : Consultant for FS
P3 : Consultant for design and project management TERMINATION
P4 : Consultant for supervision, contractor and supplier
Rajah 1B.4 Kitaran Hayat Suatu Projek

Chapter 1B - Konsep dan Kegunaan Copyright


22 ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth EditionKos Pengeluaran
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
采购阶段 运营阶段

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Kos Kitaran Hayat KOS PERMULAAN
- Kos pelaburan- pelaburan modal yang diperlukan • Co
bagi kebanyakan aktiviti dalam fasa
pengambilalihan. in t
Peratus Kos Terlibat - Pelaburan kerja- Dana yang diperlukan bagi aset • Wo
semasa (peralatan, kemudahan dan lain-lain) yang (eq
perlu untuk menubuhkan dan menyokong aktiviti
100 operasi.
sup
- Kos dalam fasa perolehan, berlaku 1x sahaja • Co
- Contoh: Kos asas mesin, kos pengangkutan, kos • Ex
75 pemasangan, kos latihan dll ins
KOS OPERASI DAN SENGGARAAN
- Kos dlm fasa operasi, berulang sepanjang
hayat
- Terdiri dari: •
 kos berubah (kos buruh & bahan •
langsung) ---
 kos tetap (kos buruh tak langsung, ---
insurans)
Masa dan Aktiviti KOS PELUPUSAN
Fasa Fasa Fasa - Kos pada akhir hayat sesuatu aset, tidak
Perolehan Operasi & Senggaran Pelupusan berulang •
- Nilai sisa = Nilai tukar beli – kos pelupusan •
Rajah 1A.5 Kos Kitaran Hayat Suatu Projek - Contoh: kos pengangkutan, bahan, buruh •
(Life Cycle Cost – LCC)
untuk melupuskan aset tersebut, kos
pembersihan kawasan
Chapter 1B - Konsep dan Kegunaan Copyright
24 ©2012 by Pearson Education, Inc.
Engineering Economy, Fifteenth EditionKos Pengeluaran
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.
Exercise Chapter 2

• Answer Five (5) question selected below in


page 74 Sulivan’s Book
2-1
2-2
2-6
2-7
2-10

Copyright ©2012 by Pearson Education, Inc.


Engineering Economy, Fifteenth Edition
Upper Saddle River, New Jersey 07458
By William G. Sullivan, Elin M. Wicks, and C. Patrick Koelling
All rights reserved.

You might also like