Professional Documents
Culture Documents
‐ 10" x #300
Project Description Feasibilit Time Cost
y
Structural Analysis
• CFD Analysis of Truninon mounted ball valve at 10 different angle of rotation with cavitation analysis Possible 3 weeks
(0°to90°)
• Strength analysis of trunion and bonnet mountings of Ball including Shear, Deformation & Displacement 3 weeks
(Shear Strength, Torsional strength under pressure)
• Open to Close and Close to open Torque under max Differential pressure i.e. 51.1 Bar Not sure. 2 weeks
• Calculation of required torque to open the valve under Max. Differential pressure at different angles of Need to
rotation explore
10 weeks