Professional Documents
Culture Documents
Modul 9c Persiapan Kontrak
Modul 9c Persiapan Kontrak
Content of a Contract
2
CONTENT OF A CONTRACT (1)
3
CONTENT OF A CONTRACT (2)
4
CONTENT OF A CONTRACT (3)
5
TENDERING PROCEDURE:
FIVE MAIN PHASES
Prequalification of potential Tenderers
4 to 8 months Preparation of the call for tenders (by client)
‒ Conditions for tender preparation & issue
‒ Contract conditions (clauses, prices, etc…)
‒ Scope of work and specifications
2 to 4 months
Tenders preparation (by Tenderer)
‒ Technical and commercial
‒ Competition analysis
‒ Positioning and tender submission
2 to 4 months
Tenders analysis (by Client)
‒ Receipt and formal opening
‒ Comparison
‒ Clarification meetings
‒ Additional submissions
‒ Evaluation and recommendations
?? Decision
6
TENDERING PROCEDURE:
SUBMITTAL OF THE TENDERS
Tenders are generally requested to be submitted in three
parts:
‒ The contractual part (essentially the qualifications or items of non
compliance with the contractual conditions),
‒ The technical part (essentially the qualifications to the design
dossier (plant definition and specifications)) including the “execution
plan” with the means and the proposed work time schedule,
‒ The commercial part with the proposed price conditions.
in separate Sealed packages, with standardized identification,
at the same date or at different dates
7
TENDERING PROCEDURE
OPENING OF THE TENDERS
Several philosophies exist for Tenders opening:
8
TENDERING PROCEDURE:
ANALYSIS OF THE TENDERS
• Qualifications in the Tenders are usually split into three categories:
• Acceptable: for which the Operator has no objection and even may consider they are
helpful for clarification purpose,
• Not acceptable: for which the relevant Tenderer will be requested to withdraw if he
wants to remain into the competition,
• Negotiable: which are usually technically acceptable, but may affect the price and the
work time schedule.
• In some instances, the contents of the Tenders are measured against
pre-established criteria, all weighted to arrive at an overall assessment
and a rating of the Contractors, e.g. (based upon a more detailed
breakdown)
‒ "Planning: rating 3/5 Weighting: 20%
‒ "Technical: rating 2/5 Weighting: 50% Overall rating: 2,8
‒ "Organisation: rating 4/5 Weighting: 30%
9
TENDERING PROCEDURE:
CLARIFICATION MEETINGS
• The objective of Clarification meetings is for the Operator is to review
and clarify with each Tenderer:
‒ The Contract “execution plan” submitted by the Tenderer, including the work time
schedule,
‒ The qualifications that the Tenderer has submitted with his tender,
‒ The alternative Tenders submitted by the Tenderer, his reaction to the acceptable
qualifications or suggestions made by other Tenderers,
‒ His position vis-à-vis the “endorsement” of the plant design dossier.
• The joint review with each Tenderer of the comments he has made to
the design dossier will enable:
‒ The Operator to appreciate the understanding and motivation of the Contractor
‒ The Tenderer to improve his understanding of the Client’s position,
‒ The Operator to improve the general quality of the dossier by taking into account the
relevant comments.
10
TENDERING PROCEDURE:
REVISED CFT.S (NOT ALWAYS)
If necessary, the result of the clarification meetings will be that the Client will
update the basic documents and issue modified call for tender documents to
the Tenderers (all of them or only short list of acceptable ones), with:
• All the tenderers qualifications he finds acceptable,
• The negotiable qualifications assumed not to have a significant impact on
the price and the work time schedule.
• The technical documents amended by the relevant qualifications and
comments of the Tenderers
• The documents updated, as part of the normal project progress
• Other interesting negotiable qualifications may be proposed as options by
the tenderers in order to appreciate their price and time schedule impact.
12
TENDERING PROCEDURE:
FINAL SELECTION
Opening of final tenders and selection of the Contractor
• After having checked that each tenderer has accepted (through his initialling)
the Contract conditions, the Operator opens the commercial proposals.
• The selection is made in principle on the lowest price basis, or at least on the
most economical solution, based upon “Life cycle cost” (OPEX +CAPEX)
• If it is not the case, the Operator is usually requested to document his decision,
which he may do on the basis of the weightings and detailed scored evaluations
• To accept at the last minute an uncontrolled price reduction from one contractor
outside the normal competitive procedure would be :
‒ Unfair to the other Tenderers (and counter-productive for next project)
‒ Risky, as the Contractor will probably try to recover such reduction during the performance of the
Contract
13
CONTRACT PREPARATION:
PROJECT FRONT STAGE
The front stage work to be performed is critical for the success of the Project
14
CONTRACT PREPARATION: SPCs &
BLUEBACK CONTRACTS
15
PREPARING SERVICE PURCHASE
CONTRACTS
16
PREPARING BLUEBACK
CONTRACTS
At a minimum, the contract must contain all the information
required for an SPC:
• The date
• A contract inquiry number
• Two signatures
• The printed name and printed title of every person who
signs
• Mandatory provisions
• The specifications are to be complete, explicit, and detailed.
17
PREPARING AN INDIVIDUALLY
DRAFTED BLUEBACK CONTRACT
FROM SCRATCH
In drafting any agreement, there are essential elements that are to be contained in
all contracts.
1. The contract must clearly and accurately identify the parties (i.e., corporation,
fictitious name, individual).
2. The signature date of the contract should be completed.
3. The contract price and any qua ntities of goods or services to be provided must be
specified.
4. If services or goods are to be provided, then the goods or services must be clearly
described.
5. The dates relating to the commencement and completion of the contract are
essential and should be specifically addressed.
6. Include a payment schedule specifying the amount and due date of each payment.
7. The contract must include all mandatory language.
8. The parties, including the proper number of parties with title identification, must
sign
9. If any tables, descriptions, inventories, drawings, pictures, etc., are to be attached
to the contract
18
PERSIAPAN KONTRAK JASA PELAKSANAAN
KONSTRUKSI KEMENTERIAN PUPR (1)
19
PERSIAPAN KONTRAK JASA PELAKSANAAN
KONSTRUKSI KEMENTERIAN PUPR (2)
20
SOP MANAJEMEN KONTRAK:
DIREKTORAT LOGISTIK ITB (1)
Alur Proses Pembuatan Kebijakan/Strategi/Evaluasi Pengadaan
SOP MANAJEMEN KONTRAK (1)
Penyedia
Prosedur Seksi Perencanaan Subdit Pemilihan Seksi Hukum& Seksi Pemeriksaan Seksi
Unit Kerja Barang/
(Kode SOP) Barang/Jasa Penyedia Pengendalian Kontrak Barang/Jasa Keuangan&Monitoring
Jasa
Start
S01.00-0 SOP Pemilahan, Pengalihan Jalur
Kewenangan dan Perencanaan Pengadaan Input Rencana Pemilahan Jalur
Barang/Jasa Implementasi RKA Pengadaan
S01.00-0 S01.00-0
21
SOP MANAJEMEN KONTRAK:
DIREKTORAT LOGISTIK ITB (2)
SOP MANAJEMEN KONTRAK (2)
Seksi
Prosedur Seksi Perencanaan Subdit Pemilihan Seksi Hukum&Pengendalian Seksi Pemeriksaan Direktorat Sarana
Unit Kerja Keuangan& Penyedia Barang/Jasa
(Kode SOP) Barang/Jasa Penyedia Kontrak Barang/Jasa Prasarana
Monitoring
A
22
SOP MANAJEMEN KONTRAK:
DIREKTORAT LOGISTIK ITB (3)
SOP MANAJEMEN KONTRAK (3)
Prosedur Seksi Perencanaan Subdit Pemilihan Seksi Hukum& Seksi Pemeriksaan Barang/ Seksi
Unit Kerja Direktorat Keuangan Penyedia Barang/Jasa
(Kode SOP) Barang/Jasa Penyedia Pengendalian Kontrak Jasa Keuangan&Monitoring
⋄ Keuangan
S01.03-3a SOP Prosedur Keterlambatan S03.01-3
Pembayaran Setoran Denda Oleh Tindak Lanjut S03.01-4
Penyedia Pemutusan S01.03-3a
S03.01-3 SOP Pelaksanaan Pekerjaan Kontrak ⋄ Monitoring
YES
Dalam Masa Denda S01.04-3 S01.04-3
S03.01-4 SOP Pemutusan Kontrak dan
Daftar Hitam
S01.04-3 SOP Tindak Lanjut Pemutusan
Kembali Ke Awal
Kontrak
S01.00-0
S01.00-0 SOP Pemilahan, Pengalihan Jalur
Kewenangan dan Perencanaan Pengadaan
Barang/Jasa
C
23
SOP MANAJEMEN KONTRAK:
DIREKTORAT LOGISTIK ITB (4)
SOP MANAJEMEN KONTRAK (4)
Prosedur Seksi Perencanaan Subdit Pemilihan Seksi Hukum& Seksi Pemeriksaan Barang/ Seksi
Unit Kerja Direktorat Keuangan Penyedia Barang/Jasa
(Kode SOP) Barang/Jasa Penyedia Pengendalian Kontrak Jasa Keuangan&Monitoring
End
24
TERIMA KASIH
25