Notification
Notification
1.1 Introduction:
1.1 Introduction:
Thenotification
The notificationisisaatechnical
technicaldocument
documentuseful
usefultotocall
callthe
themaintenance
maintenancepersonnel
personnel
totofix
fixaafailure
failureor
oraatechnical
technicalproblem
problemononthe
theoperative
operativesite.
site.Many
Manytimes
timesisisthe
the
firststep
first stepofofthe
themaintenance
maintenanceprocess.
process.This
Thisrequest
requestcan
canbebecreated
createdbybypeople
peopleofof
anydepartment of
any department ofthe thecompany to
company torequest
requestmaintenance
maintenancetasks
tasksor to
or todocument
document
tasks carried out. Therefore the notification provides technical data reporting
tasks carried out. Therefore the notification provides technical data reporting
ininthe
theMaintenance
MaintenanceInformation
InformationSystem.
System.
1.2 overview:
1.2 overview:
Thenotification
The notificationisismainly
mainlyidentified
identifiedwith
withthe
thefollowing
followingareas:
areas:
WorkRequest
Work RequestHeader
Header
MalfunctionBreakdown
Malfunction Breakdown
Attacheddocument
Attached document
ItemsOverview
Items Overview
Notification structure
Notification structure
1 2 3 4
Notification number
Notification type
Descriptive text
Notification status
Maintenance
responsibilities
Notification dates
Malfunction; Breakdown
Malfunction; Breakdown
In the
In the
"Malfunction;
"Malfunction;
Breakdown"
Breakdown"
folder tab,
folder tab,
many fields
many fields help
help
to specify
to specify the
the
time of
time of
Breakdown
Breakdown
start and
start and end,
end,
if it
if it happened,
happened,
and therefore
and therefore
the duration.
the duration.
In the
In the
"Attached
"Attached
Document"
Document"
folder tab,
folder tab,
many
many
Document
Document
Info Records
Info Records
can be
can be added
added
to better
to better
describe the
describe the
maintenance
maintenance
failures and
failures and
actions done
actions done to
to
fix them.
fix them.
Items Overview
Items Overview
The last
The last
"Item
"Item
Overview"
Overview"
folder tab
folder tab is
is
useful to
useful to
enter aa
enter
multiple set
multiple set
of items
of items
when more
when more
than one
than one
failure has
failure has
been found
been found
during the
during the
maintenance
maintenance
work.
work.
Transactions
Transactions
ID Transaction Description
Code
1 IW21 Create Notification
2 IW22 Change Notification
3 IW23 Display Notification
List Editing transactions
4 IW28 Change (upon selection criteria)
5 IW29 Display (upon selection criteria)
CreateNotification
Create Notificationby
byusing
usingtransaction
transactionIW21
IW21
Selection of
Selection of Notification
Notification Type
Type
Select the
notification type
Notification Types
Notification Types Table
Table
Selection of
Selection of Equipment
Equipment Number
Number
Select equipment
number
Selection of
Selection of Equipment
Equipment No.
No. –– List
List of
of Functional
Functional Location-1
Location-1
Selection of
Selection of Equipment
Equipment No.
No. –– List
List of
of Functional
Functional Location-3
Location-3
Selection of
Selection of Equipment
Equipment No.
No. –– List
List of
of Functional
Functional Location-4
Location-4
ZOHR plant
Functional Location
for example
Selection of
Selection of Equipment
Equipment No.-
No.- Functional
Functional Location
Location Structure
Structure list
list
ZOHR plant
Functional Location
Based on the
required equipment,
select one of them
Selection of
Selection of Equipment
Equipment Number
Number
Typing the
Typing the Notification
Notification Description
Description
Type short
description for the
notification
Degrees of
Degrees of Urgency
Urgency
Emergency
Emergency Work requiring immediate action, to be carried out where there is an
immediate danger to loss of life, damage to the environment or significant
loss of production. Work is to continue continuously until the emergency is
alleviated. The request for work may be verbal, but must be followed up by a
“a posteriori” formal Work Order within 24 hours
Urgent
Urgent Work requiring action within 24 hours of the request being received where
there is a potential of danger to the health or safety to the employees,
damage to the environment or loss of production. A formal Work Order, even
not planned, must be issued before the work commencement
Vital
Vital Work on critical equipment that has installed active spare equipment. This
work requires action within seven days of the request being received.
Ordinary
Ordinary Work required which has no potential of endangering health, safety,
environment, or production. Work will be planned accordingly.
Shutdown
Shutdown Work requires the shutdown of the plant in order to perform the work.
Catalogues
Catalogues
Reference Tables
Examplefor
Example forCentrifugal
CentrifugalCompressor
Compressor(COCE)
(COCE)
Saving the
Saving the Notification
Notification
IW29Display
IW29 Display (upon
(upon selection
selection criteria)
criteria)
USINGTHE
USING THESEARCH
SEARCH
CRITERIA
CRITERIA
DISPLAYED IN
DISPLAYED IN THE
THE
NEXT SLIDE
NEXT SLIDE , , YOU
YOU
CAN VIEW
CAN VIEW THE THE
LIST
LIST OF
OF THE
THE
NOTIFICATIONS
NOTIFICATIONS
IW29Display
IW29 Display (upon
(upon selection
selection criteria)
criteria)
Execute
Display Notification
Display Notification by
by using
using transaction
transaction IW23
IW23
or press the
“Notification”
button
Write the
Notification
number then
press Enter
or press the
“Notification”
button
Write the
Notification
number then
press Enter
IW28Change
IW28 Change Notification
Notification (upon
(upon selection
selection criteria)
criteria)
Execute