Comments • *Some valves doesn’t have a handle so is important to have some locking pliers/adjustable wrench on hand to take immediate action if we observe a valve open. • * The audit took emphasis in the areas of the plant with least traffic • *Its important to know what kind of fluid/water its leaking and where it is going; harmful fluids can cause big loses if they go thought the city sewers without proper treatment • *We need to be watching for this kind of issues on daily basis when most of the valves and pipes have fluids in motion. • Medium pressure valve was not completely closed by DeliWOG area, I got a locking pliers to close the valve. • The water heater tank by the maintenance workshop is showing some small holes where its constantly leaking water, making the tank look rusty. A work order will be issued to fix it. • Sprayers in the picking room were open with the shackles chain not running at the moment of the audit, a locking pliers were used to close the valve again. • Valve by Emergency shower station in waste water area wasn’t completely closed leaking some small amount of water. • Pipe in the hot water tank located in the picking room seems to be missing some Thread seal tape, probably due to the wearing that the high temperature and steam causes on it, small leaking was seen. • On the Nalco Solid cooling water tank bottom there is some leaking coming from the pipe couple, the pipe attachment may be presenting some looseness.