EOR Management Plans

1. Oil Remaining Reserves


2. Selected EOR methods
3. Laboratory study and reservoir simulation study
a) Fluid characterization and analysis
b) Rock characterization
c) Compatibility test
d) Phase behaviour
e) Imbibition test
f) Adsorption
g) Steam quality
h) Thermal stability test
i) MMP test
j) Core flooding
4. Pilot project
a) Traces test, Surveillance, injectivity test,
Connectivity
b) Monitoring
c) Evaluations project and economics analysis
5. Full scale
a) Study optimization oil production ( infill well,
rate production)
b) Scenario development strategy ( well pattern,
methods injection))
c) Production Facility ( increasing production)
d) Transmission pipe line
e) Evaluation eng and economics analysis
f) HSE
g) Community Development
6. abandoment
EOR METHODS
 Thermal Process ( Hot water, Steam
stimulation, Steam flooding, In situ
Combustion)
 Miscible displacement ( LPG, CO2, Enrich gas,
Nitrogen)
 Chemical Flooding (Surfactant, Polymer,
Alkaline, SP, ASP, AP)
 Unconventional
 Nuclear, Electromagnet, Microbial EOR
STEAM STIMULATION- HUFF
AND PUFF
STEAM FLOOD PROCESS
INSITU COMBUSTION
MISCIBLE FLOODING- WAG