Professional Documents
Culture Documents
PP Overview
PP Overview
Planning)
Organizational Elements
– Client
– Company Code
– Plant
– Storage Location
Master Data
List of Master Data in SAP PP Module are:
– Material Master
– Bills Of Material
– Work Centers
– Routings
Master Data
Material Master
Material Master
MRP View 1
MRP View 2
MRP View 3
MRP View 4
Master Data
Bills Of Material
Bills Of Material
Bills Of Material
Bills Of Material
Master Data
Work Centers
Work Centers
Capacity
Machines Requirements
Cost
Planning
Center
Assembly Work
People Costing
Line Centers
Scheduling,
Production Execution Times
Line
Work Center
Work Center
Work Center
Work Center
Work Center
Master Data
Routings
Routing
Routings - Components
Material Allocation
Production Planning
• Demand Management
• Material Requirement Planning
− Planning of Purchased parts
− Planning of in house assemblies
Planning Process: Strategies
While doing planning, you need to decide which planning strategy to use when the customer places their
order.
• Make-to-Stock Production
− Make-to-stock production means we build stock in anticipation of customer demand. We ship the
customer order from our stock of finished goods
• Make-to-order Production
− We wait for a customer order before we start production/procurement. i.e. We produce as per demand
from customer
MRP Overview
Uses of MRP
MRP Functions
MRP Prerequisites
Planning Run
Planning Run - Types
الهيكل التنظيمى للشركة الوطنية
مصنع اقمشة
مصنع الزوى
التريكو
مصنع الصباغة
والطباعة
والتجهيز
البيانات الرئيسية لخصائص المنتج نهائى ( قماش جاهز )
القيم الخصائص
مصبوغ مطبوع مبيض نوع التجهيز
- Text الطباعة
- Text لون الصبغة
double peqe summer melton melton reb single gerce ستان مبرد ساده نوع القماش
7 5 2/3 3/2 3/1 2/1 1/3 1/2 3/3 2/2 1/1 2\1 3\1 التركيب النسجى
200 …. 17 16 15 14 13 12 11 10 عدد الفتل فى اللحمة
مخلوط قطن ليكرا بوليستر قطن فسكوز قطن بوليستر الخامة لحمة
10/90 20/80 30/70 40/60 50/50 60/40 70/30 80/20 90/10 100 نسبة الخلط لحمة
ممشط كومباكت ممشط مسرح كومباكت مسرح نوع الغزل لحمة
محلول كريب تريكو نسيج نوع الصناعة لحمة
240/3 …. 12/3 240/2 …. 12/2 240/1 …. 18/1 16/1 12/1 نمرة الخيط لحمة
200 …. 17 16 15 14 13 12 11 10 عدد الفتل فى السداء \ سم
مخلوط قطن ليكرا بوليستر قطن فسكوز قطن بوليستر الخامة سداء
10/90 20/80 30/70 40/60 50/50 60/40 70/30 80/20 90/10 100 نسبة الخلط سداء
ممشط كومباكت ممشط مسرح كومباكت مسرح نوع الغزل سداء
محلول كريب تريكو نسيج نوع الصناعة سداء
240/3 …. 12/3 240/2 …. 12/2 240/1 …. 18/1 16/1 12/1 نمرة الخيط سداء
360 … 160 150 140 130 120 110 100 90 عرض القماش \ سم
500 … 95 90 85 80 75 70 65 60 وزن المتر
ال يوجد يوجد ليكرا
0.2 … 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 نسبة الليكرا:
البيانات الرئيسية لخصائص المنتج نهائى ( قماش جاهز )
بيع )25
القيم (امر ِ بيع )24
القيم (امر ِ الخصائص
Physical Movement
Storage Loc MAIN Storage Loc WIP
Production Execution
Planned Order
Availability Check
Convert Order
BOM
Production
Routings Move
Order
stock
Work Center
Goods issue
Production
Confirmation
Goods receipt
TECO
Logistics Planning
Purpose and Benefits:
• Purpose
− The purpose of logistics planning is to make sure that future demand can be satisfied by your
company’s available resources and to point out situations where demand cannot be met in time
or in the desired quantities.
• Benefits
− Seamless Integration in complete planning cycle
• CO-PA SOP LTP Demand Planning
• Key process flows covered
− Sales and Operation Planning
− Long Term Planning
Rework Processing (Work-In-Process)
• Purpose
− Processing of defective material on a production order.
• Benefits
− Scraps at defined operation automatically trigger rework process.
− After rework, additional activity and material consumption can be confirmed.
− Fully integrated in the production process
• Key process flows covered
− Confirming Production Activities
− Confirm Scrap defective material
− Confirm Parent Order at Rework Operation
− Continue Shop floor-Activities
Rework Processing (Work-in-Process) – Process Flow Diagram
Confirming
Production Activities End Process
Event
No
Quantity
Scrap Defective
Quantity that Can’t
Be Reworked
Yes
Rework Processing (Stock-Manufactured Material) – Process Flow Diagram
Identified
Component in Stock End Process
Requires Changes
Production Planner Event
Confirmation of
Rework
Shop floor
Production
Specialist
Activities
Warehouse Clerk
Posting Goods
Receipt for
Goods Issue for Rework
defective Material Production
Order
Review Order
Production
Supervisor
Confirmations
عرض التقارير الخاصة بإدارة البيع
عرض التقارير الخاصة باالنتاج
تقارير تحليل الطاقات االنتاجية”