USING BIM TO SET UP AN EFFECTIVE FACILITY MANAGEMENT PROCESS

DURING THE CONSTRUCTION AND TURNOVER PHASES


JULIO CÉSAR VÁSQUEZ TORAL
 Case of Study: Maryland General Hospital

INTRODUCTION  Project: Add 9600 square meters to the hospital with new facilities.

 No BIM during the design stage.


APPLICATION OF BIM TO THE PROJECT

Integrate various models to


create a partial one for the Clash checking
building.

Capture field data


Tracking the closeout
(including documentation
process
about equipment)
WHY WAS BIM USED DURING CLOSEOUT AND FACILITIES
MANAGEMENT?

01 02 03 04
To make the To diminish risk Create a central Linked to a 3D
process more and help the database model for betther
effective and hospital with its containing visualization.
productive future operation. closeout
documentation .
BIM helps reduce the waste around the facilities management process.

BIM enables an efficient and agile facilities management process.

BIM can be implemented and used at any stage.

BIM can be used during the whole life-cycle of a building.

CONCLUSSIONS