Professional Documents
Culture Documents
–
A COMPANY WITH A MISSION TO DELIVER
An ISO 9001:2015 & ISO 14001: 2015 CERTIFIED
COMPANY
Jaybee Energy Pvt. Ltd founded in 1989 under the able leadership of
Mr.J.N.Buragohain, is a pioneer oilfield Services company in NE India having
more than 26 years of experience in providing services in the field of Drilling,
Work-over, Well Stimulation, Gravel Pack, ESP etc to renowned clients like: -
An IADC MEMBER
ISO 14001:2015 :Environment Management System
ISO 9001:2015 : Quality Management System
VSD Unit
Tubing
Pump
Intake
Seal/Protector
Motor
Pre-Installation Data:
Post-Installation Data
60
55
50
40
OIL
32
Wate 30 28
r
20
10
5
0
Pre-Installation in m3 Post-Installation in m3
• Model: 0215-ESP-A-CW-60V
• No. of Stages: 423 Stages
• Motor HP: 60 HP
• Rated Capacity: 60 m3/Day
• Pump setting Depth: 2500 m
• Date of Installation : 29/04/2016
• Generator rating(Diesel): 125 kVA, 3 phase, 415 V
• Current Production : 50 m3/day
• Water Cut : 1.5%
Pre-Installation Data:
Post-Installation Data
60
50 49.25
40
OIL
30
WAT
ER 21
20
10.1
10
0.75
0
Pre-Installation in m3 Post-Installation in m3
• Model: 0215-50V-MI
• No. of Stages: 398Stages
• Motor HP: 60 HP
• Rated Capacity: 50 m3/Day
• Pump setting Depth: 2675 m
• Date of Installation : 03/07/2016
• Generator rating(Gas): 125 kVA, 3 phase, 415 V
• Current Production :
• Water Cut :
An ISO 9001:2015 & ISO 14001:2015 Certified Company
MAKUM #48
PRE-POST INSTALLATION DATA
Pre-Installation Data:
Post-Installation Data
25
21
20
15
OIL
WATER
10 9
0 0
0
PRE-INSTALLATION IN M3 POST-INSTALLATION IN M3
An ISO 9001:2015 & ISO 14001:2015 Certified Company
GRAVEL PACK
250000
Pre-Installation Data:
200000
Gas Production : 90000 scmd
150000
Fluid Production: 8000 lpd
100000
50000 PRE
Post-Installation Data :
0 INSTALLATION
Gas Production : 20000 scmd
POST
Fluid Production : 21000 lpd INSTALLATION
Pre-Installation Data: 35
Fluid Production : 30klpd
30
Water Production : 8klpd
Oil Production:22 klpd 25
20
Post-Installation Data : Water
15 Oil
Fluid Production : 46 klpd
Water Production : 14 klpd 10
Oil Production: 32 klpd
5
0
Pre-Installation Post-Installation
SAND INGRESSION: NIL
An ISO 9001:2015 & ISO 14001:2015 Certified Company
QUIZ
• Video-monitored
Faster:
• Up to 80% shorter cleaning time
Cost Efficient :
• Minimal tank downtime due to faster cleaning
• Up to 95% oil recovery from sludge
• Up to 80% reduction of disposable waste
`
PREAPARATION
OIL WASH
WATER WASH
SEDIMENT
REMOVAL
DISMA
NTLE
MANHOLE-CANNONS
CLEANING
CANNON BEFORE
INSTALLATION
CLEANING
CANNON
MOUNTED TO
BOTTTOM
MANHOLE
An ISO 9001:2015 & ISO 14001:2015 Certified Company
EQUIPMENTS
OIL WATER
SEPARATION
MODULE
6) Heat Exchanger:
• Inlet and outlet: DN100
• Pressure: 100m3/h
• Heat exchanging Area: 40m3
An ISO 9001:2015 & ISO 14001:2015 Certified Company
EQUIPMENT DETAILS
7) Nitrogen system(including compressor unit)
Media: Nitrogen
Capacity: 200Nm3/h
Purity: 99.9%
• Compressor power: 55 kW
Heating control station Heating cable Casing-head Basic and secure locks
stuffing box
Additional equipment:
COIL TUBING
SCRAPER
BOILER UNIT
Example:
On average, according
to the data of 7 wells, In Raduzhnij city (Khanty-Mansiisk
incremental oil rate – 26% autonomous district) all wells, equipped
On average incremental oil with electrical heat tracing system by
Rate of the field – 34% heating cables, remain efficient at t˚ =
-60˚С. At the rest of the wells there were
registered work failures during oil
production and outage of downhole
equipment.
Results:
-There is an increase of well capacity from 18% to 45%.
-Water cut decreases.
- Increasing workover interval of electrically-centrifugal pump unit
57
An ISO 9001:2015 & ISO 14001:2015 Certified Company
COST EFFICIENCY
Cost efficiency is determined by a range of factors and at each
field has its own technological peculiarities and calculation
procedures but basic factors which determine efficiency are the
following:
1. Increasing wells’ workover interval;
2. Increasing well capacity and water-cut reducing;
3. Cost reduction to scraping operations and hot-oil processing;
4. Availability of oil-associated gas and possibility of its recycling
through energy generation and its back supplying into the well.