SKYWAY EXTENSION

UNDERCARRIAGE CONDUIT (Comments)


Location: KM 23+425
1
Comment:

Indicate the installation of proposed service box and


IMC conduit.

Note:
HDPE pipe should be connected with service box.
Location: Going to bored pile 92

Comment:

Indicate how the connection of Pull box will transition


in bored pile 92.
IMC Pipe
C-clamp

bored pile 92
3
Location: Transitioned from bored pile 92

Comment: Roadside Cabinet

Proposed IMC pipe from transition in bored pile 92


(image 3 ) should be connected with Roadside
Cabinet and existing conduit installed by EXE.

4
Location: Location: Alabang Northbound Exit near bored pile 84

Comment:

Indicate the installation of proposed IMC pipe attached with drainage pipe. Proposed IMC pipe should be connected with Roadside cabinet
and existing pull box (image 6 )

Note: Minimal open trenching is required.

Roadside Cabinet

6 5
Location: Bored pile 1 going to Skyway Main Bravo

Comment:

Add the proposal of c-clamp for undercarriage which measures


approximately 300 meters (see image below).
SUMMARY

1.The supply of  ODF Cabinet and RSC loop is not included in BOQ.

2. The as-plan should be in sequence based on geographical plan.

3. Requiring the detailed as-plan. Submitted as-plan from Fiber Home before
is only for reference.