WEEKLY PROGRESS

REPORT #18
AUGUST 22, 2021

7 STOREY BUILDING
Item Schedule

On-going
1. Painting of ceiling walls and traffic paint – Basement

Done , Need to finish punch list


2. Electrical works for elevator and Testing

Done
3. Installation of Glass door at Roof Deck

On-going
4. Water supply from water tanks to units

On-going
5. Plastering on the walls of the left side Unit

Done
6. Plastering and re-paint of gap on the elevator

On going
7. Installation of fire pump
PROGRESS PHOTOS

Re-paint of the basement walls and traffic paint


PROGRESS PHOTOS

Plastering and re-paint the gap on the Elevator


PROGRESS PHOTOS

Plastering on the wall of the left side Unit


PROGRESS PHOTOS

Elevator Testing (wiring, high speed,


buttons, phone and weight)
PROGRESS PHOTOS

Alexur works
PROGRESS PHOTOS

Installation of glass door on the Roof deck


WEEKLY PROGRESS
REPORT #8
August 22, 2021
PARKING SPACE
Item Schedule

1. Concrete Pouring on post (rear) Done

2. CHB laying on the Partition Done

3. Concrete Pouring of Wall Footing (Left) and CHB laying On-Going

4. CHB Laying on Right side On-going

5. Cutting tree Done

6. Excavation of Septik Tank On-going

7. CHB laying on CR On-going


PROGRESS
PHOTOS

CHB laying on right


wall and concrete
pouring on the right
post
PROGRESS
PHOTOS

CHB laying on
the CR
PROGRESS
PHOTOS
CHB LAYING ON
LEFT WALLS
AND CONCRETE
POURING ON
LEFT POST
PROGRESS
PHOTOS
PAG PUTOL NG
PUNO