You are on page 1of 5

1st Term Practical Exam

The administration floor plan is given. As a network engineer of your company, your task is to
design the administration building based on the requirements below:
1) Place the data nodes into the appropriate location. (10 data nodes and each has 2 ports).
2) Place the Wireless access point and switch into the appropriate location. (3 wireless access
point and 1 switch).
3) Use only 2 boxes of UTP cable (each box is consisted of 100 meters).
4) Estimate the distance between the data nodes/wireless to switch. Don’t exceed the
available UTP cable length.
5) Fill up the Port Map and Single line diagram based on your design and estimation.

*The placement of nodes/access point/switch is based on the network engineer design


perspective.
125 m

D02
D01 D03

D04

D07
Access point 2

100m
D10 D05

LEGEND:
Access point 3
-DATA NODE
D06
-SWITCH
D09 D08
-ACCESS POINT

-UTP CABLE

ADMINISTRATION BUILDING EXISTING STRUCTURED CABLING FLOOR PLAN LAYOUT


Project Title Produced By: Prepared By: Noted by: Recommending Approval: Approved:
PHYSICAL DIAGRAM OF JOLYN
CLSU ADMINISTRATION
FLOORPLAN
MATEO
PORT LOCATION LABEL DISTANCE PORT LOCATION LABEL DISTANCE
(meters) (meters)
1 Internal Audit D01 12m 13 Access Point 3 D13 15m
2 Records Office D02 5m 14 D14
1 2 3 4 5 6 7 8 9 10 11 12
3 Cashier’s Office D03 5m 15 D15
13 14 15 16 17 18 19 20 21 22 23 24

4 Conference D04 15m 16 D16


Room
17 D17
5 Secretary  D05 16m
18 D18
6 Procurement D06 18m
19 D19
Office
20 D20
7 Accounting Office D07 14m
21 D21
8 Budget Office D08 16m
22 D22
9 President’s D09 18m
23 D23
10 HRMO Office D10 15m
11 Access Point 1 D11 15m
= 179 meters
12 Access Point 2 D12 15m

ADMINISTRATION BUILDING STRUTURED CABLING PORT LAYOUT


Project Title Produced By: Prepared By: Noted by: Recommending Approval: Approved:
JOLYN
Admin Phase 1
MATEO
10 X 2 UTP CAT6
PATCH PANEL 20 DATA NODE

3 UTP CAT6
3 WIRELESS ACCESS POINT

:Patch Panel (24 Ports) :Fiber Patch Panel (24 Ports)


=

:Managed Switch (24 Ports+ 4 ports SFP) :UPS

ADMINISTRATION BUILDING STRUTURED CABLING SINGLE LINE DIAGRAM


Project Title Produced By: Prepared By: Noted by: Recommending Approval: Approved:
LOGICAL DESIGN OF JOLYN
CLSU ADMINISTRATION
FLOORPLAN
MATEO

You might also like