Professional Documents
Culture Documents
Profile
Kimberley Turner
Chief Executive Officer
Aerosafe Risk Management
Slide 1 EXHIBIT/P-00058
Overview of Presentation Structure
• Introductions
• Risk management
• Industry Risk Profile
– Methodology
– Output & use of an IRP
• Additional discussion topics
• OSHI use of risk management concepts
Slide 2
Part 1: Introductions
Slide 3
Introductions
Slide 4
Part 2: Risk Management
Slide 5
What is Risk?
Slide 6
What is Safety Risk?
Slide 7
What is Safety Risk?
Slide 8
What is Risk Management?
Slide 9
Slide 10
Governance & Oversight for
Integrating Helicopter
Transportation Safety
Slide 11
Part 3: Risk Profiling
Slide 22
Industry Risk Profile (IRP)
Slide 23
Industry Risk Profile
• Define the industry
• Establishes the context
• Clarify the core objective
• Recognize that the profile changes
• Draw boundaries for the assessment
• Influences on data sources
• Depth of analysis
Slide 24
What is Risk?
Slide 25
Industry Risk Profile
Methodology
Slide 33
IRP Methodology
• ISO31000 risk management process
• Structure provided by IRP model
• Driven on information accumulated
• Available documents reviewed
• Industry stakeholders identified
• Over 12 risk identification techniques used (layer)
• Many pieces of risk data extracted from these
sources initial assessment
Slide 35
Summation of Results
• Risks presented by Risk Ranking
– Highest to lowest
– A number of risks have same rating or level
• Risk presented against matrix
– Scatter plot of risk (consequence & likelihood)
– Before & after results
• Risks presented against IRP Model
– Used to develop road map to risk reduction
– Allocating accountability for action
Slide 36
Example Risk Matrix
Result Presentation
Example Risk Matrix
Result Presentation
Summation of Results
• Risks presented by Risk Ranking
– Highest to lowest
– A number of risks have same rating or level
• Risk presented against matrix
– Scatter plot of risk (consequence & likelihood)
– Before & after results
• Risks presented against IRP Model
– Used to develop road map to risk reduction
– Allocating accountability for action
Slide 39
Output & Use of an IRP
• At the Commissioner’s request an IRP will
be developed concurrently with the inquiry
process
• IRP development will be in collaboration
with stakeholders to extract key issues
and suggested solutions for enhancement
• IRP content will be presented for
consideration by the Commissioner and
used in his deliberations
Slide 41
Part 4: Additional discussion topics
•Governance
•Risk Management
•Safety Management Systems
•Contract Management
Slide 42
Governance
Slide 44
Compliance
Slide 45
Compliance
Assurance
Slide 46
Risk
Compliance
Management
Assurance
Slide 47
Risk
Compliance Management
Governance
Assurance
Slide 48
Risk Management
Slide 49
Slide 50
Slide 51
Slide 52
SMS
Aviation
Safety Management Systems (SMS)
Slide 53
Defining SMS…….
A safety management system (SMS) is an
organized approach to managing safety,
including the
• Necessary organizational structures
• Accountabilities
• Policies and
• Procedures
International Civil Aviation Organization
Slide 54
Defining SMS…….
The purpose of a safety management
system is to provide a systematic way to
control risk and to provide assurance that
those risk controls are effective
FAA
(USA Regulator)
Slide 55
Defining SMS…….
“A safety management system is a
business-like approach to safety. It is a
systematic, explicit and comprehensive
process for managing safety risks”
CASA
(Australian Regulator)
Slide 56
Defining SMS…….
A documented process for managing risks
that integrates operations and technical
systems with the management of financial
and human resources to ensure aviation
safety or the safety of the public.
Transport Canada
Slide 57
What does an SMS look like?
• Most of the regulations around the world are
promulgating principle based SMS
• There are suggested activities which demonstrate
the effective running of an SMS
• Difficulties in grasping the difference between the
“system” and the “doing”
• The most visible aspects are the application of
processes (risk management)
Slide 60
Component of an SMS
Contract Management
Slide 62
Contractor Safety Management
• Setting standards
• Measuring achievement
• Provision of confidence or “assurance”
• Corporate responsibility for:
– Aircraft capability definition
– Aircraft selection
– Oversight of system implementation
• Measuring effectiveness
Slide 63
Part 5:
OHSI use of Risk Management
Concepts
Slide 64
OSHI Adopts Risk Based Approach
• Recognition that aviation industry is
complex and not free of risk
• Recognition that the swiss cheese model
has merit in respect to accident prevention
• Relationship of broader systemic issues
• Recognized process for identification,
assessment and reduction of risk
• Ultimate aim is to provide assurance so
that confidence can be regained
Slide 65
OSHI Adopts Risk Based Approach
Phase OHSI Risk Profile
Prep Preparation Establishing Context
1A Public Hearing Issues identification and data
collection
1B Investigative Phase Development of IRP in
consultation with industry
1C Response to Investigative Consultation and confirmation of
phase agreed risk treatments measures
OHSI findings and Submission of the draft IRP to
recommendations the Commissioner as requested
2 Response to TSB Evaluation of draft IRP against
Investigation TSB investigation report
Slide 66
Question & Answer
Session
Slide 67