DEPARTMENT OF CIVIL ENGINEERING, DIPLOMA IN ARCHITECTURE

SEMESTER 3
DCA 30123 WORKING DRAWING 2
PROJECT 2 TWO STOREY DETACH BUILDING
SITE VISIT REPORT

NAME : NURUL ATIKAH AMIRA BINTI AZRUL


MATRIX NUMBER : 02DSB19F1006
CLASS : DSB 3A
NAME OF LECTURER : CIK WAN NURUL HASINAH BINTI WAN KAMARUDIN
PUAN MASITA BINTI HASAN
CONTENT
 INTRODUCTION

 KEY PLAN

 LOCATION PLAN

 SITE PLAN

 SUMMARY

 RECOMMENDATION
INTRODUCTION
• Site visit for Working Drawing class 2 (DCA 30123) was arranged by Ms. Wan Nur Hasinah and Mrs. Masita on 8
Sept 2020. The site location is in Kuantan, Pahang. Because all students only go through online classes due to
the spread of the Covid-19 pandemic, we have selected a site from one of our classmates and the lecturer sent
5 student representatives who are in Kuantan to do the site visit on 9 Sept 2020. Further discussions were held
on 10 Sept 2020 through online classes at Microsoft Teams and a total of 32 students attended.
• 5 students consisting of 2 boys and 3 girls. They split up to do some survey work around the site. A group of
women led to the site and began taking pictures and measuring the drain at the front of the site. A group of
men moved to the site in the afternoon to measure the TNB sub station located in the housing behind the site.
• The purpose of the site visit is to identify the site position, main road, have facilities or not, know the bad view
and good view, the area around the site, and what is related to site analysis.

SUB STATION TNB


SELECTED SITE
KEY PLAN
• Pahang is located in the east of peninsular Malaysia,
which is the largest state in Peninsular Malaysia. For this
Project 2, the selected site is in the capital of Pahang,
which is in Kuantan District, Pahang.
• The site is located in Kampung Baharu Pantai Sepat,
Mukim Penor, Kuantan, Pahang Darul Makmur.
LOCATION PLAN
• From Kuantan City, it takes 26 minutes to get to the
chosen site via the main road which is Jalan Tanjung
Lumpur. After that, you will see a Borhan Tomyam
Seafood stall as a landmark junction to the site which
takes 6 minutes. After that, you will see a food stall called
D 'Sepat Diner. Go a little further and you will see a site
on the right side of the road in front of Sepat Beach.
• On the left and right of the site of choice, there is a
residential area and behind the site, there is only a check.
• In my opinion, this site is suitable for the development of
two-storey bungalow houses. This is because, the area is a
tourist destination and far from the city causing the
occupants of the house will feel calm and can see the
beautiful beach scenery in front of this site.
• This lot is located at LOT 1798, Jalan Kampung Baharu,
Pantai Sepat, Mukim Penor, Kuantan, Pahang.
SITE PLAN
THE SITE COVERS AN AREA OF 1374.09m². BUNGALOW HOUSE BUILT IN 350sqm² SETBACK.

SETBACK
A setback is the distance which a building or other structure is set back from a street or road, a river or other
stream, a shore or flood plain, or any other place which is deemed to need protection. Depending on the
jurisdiction, other things like fences, landscaping, septic tanks, and various potential hazards or nuisances
might be regulated. Setbacks are generally set in municipal ordinances or zoning. Setbacks along state,
provincial, or federal highways may also be set in the laws of the state or province, or the federal government.
• Front building setback (from road) 20' @ 6.096m
• Side and rear building setbacks 10' @ 3.048m

ROAD
The main road to the site is called Jalan Kampung Baharu. The road distance from the site is 900 cm and the
drain is 136 cm including the lip of the drain. The width of the driveway from the main road is 720 cm.
BOUNDARY LINE
A boundary is a line that divides one area from another. It may also be called a border and defines the extent of one or
more areas that are adjacent or in close proximity.

Boundaries can be defined physically by coastlines, rivers, roads, walls, fences and lines painted on the ground, or they can
have no manifestation other than on maps, plans, charts and legal documentation. Boundaries between counties,
administrative regions and nation states often appear only as lines on maps.

Boundaries are often the subject of disputes and may have perimeter security to prevent unauthorised access.
• The boundary line on the north side is 36219mm and the bearing is 72°00°.
• The boundary line on the west side is 37434mm and the bearing is 159°00°.
• The boundary line on the south side is 37133mm and the bearing is 252°00°.
• The boundary line on the east side is 37489mm and the bearing is 158°00°.
RIGHT VIEW AT SITE FRONT VIEW AT
SITE

REAR VIEW AT SITE LEFT VIEW AT SITE


LANDMARKS ROAD TO SITE LANDMARK AT THE SITE
(BORHAN TOMYAM SEAFOOD) (D 'SEPAT DINER)
SUMMARY Drains that are too
POSITIVE NEGATIVE large and less secure.
Fresh air because it is Disruption in terms of No water facility
close to the beach. sound of vehicle. system
Natural and less man- Drains that are too large
made areas. and less secure. Fresh air because it is
Close to the main route. No water facility system close to the beach
Good main road. There is no specific way to
enter the site Natural and less man-
made areas.

RECOMMENDATION
• Plant more trees for shade.
• Create a new specific path.
• Place the drain cover
• Propose to upgrade the water system. Close to the main route.