COMPANY OVERVIEW

Page 1
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
SET UP IMPLEMENTATION TEAM
Nguyen D. Huu - Engineering design
Team Leader - Evaluate modification.
- Control progress
- Commissioning
- Monitoring the system

- Analysis data
- Do pre-commissioning,
Nguyen Phu Duc
commissioning
Team Sup-leader - Monitoring the system
- Make work instruction

Pham P. Quoc Truong T. Luc Le A. Nguyen Vo Viet Man Hoang S. K. Cuong Tran H. Dat Hong K. Trung
member member Member Member Member Member Member
- Engineering - Equipment test - Install electric - Install instrument - Built graphic, DCS , Test run system Check quality
design - Install equipment. cable cable sequence
- Supervise contractor - Monitoring equip. - Monitoring equip. - Monitoring equip.
install pipeline, civil during during during
commissioning commissioning commissioning
Get more support from: Purchasing, Store, SHE.
Page 2
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
MOTIVATION & THEME SELECTION
MOTIVATION VCM LOSS IDENTIFICATION

VCM LOSS IDENTIFICATION THEME SELECTION

Page 3
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
OBSERVATION ON EXISTING OPERATION OF INCINERA
TOR FOR OFF-GAS TREATMENT
EXISTING OFF-GAS

EXISTING INCINERATOR

Page 4
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
SELECTED SOLUTION FOR OFF-GAS TREATMENT

Incinerator system

Membrane system

WGA system

Page 5
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
OFF-GAS TREATMENT BY GAS MEMBRANE
MEMBRANE FOR SEPARATION PROCESS

Page 6
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
RESULT OF GAS MEMBRANE PROJECT

Membrane
Module
RESULT EVALUATION

Page 7
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane
RISK ANALYSIS & DIFFICULTY
No Problem Solution
Over pressure of gas holder due to batch Connect Gas holder tank with VCM blow down tank to
1
process. increase volume of OFF-GAS holder from 11m 3 to 55m3
2 Vacuum pump damage. Use bypass line with vacuum pump of PVC line
High pressure of Crude VCM Accumulator due to
3 Change inert purging control valve bigger.
returned inert gas from membrane.
Membrane damage or low performance (lifetime
4 a. Buy spare membrane module after about 5 years.
of membrane: >5 years).

Page 8
TPC VINA Plastic & Chemical Corp., Ltd. Recovery of VCM in off-gas by membrane