 Precautionary Measures to check Air Pollution Problems

1.By Using Absorbers


2. Application of Vapour Recovery System
3.Standardization of the height of the flare stacks.
4.By introduction of diluters
5.Air regulation control during the combustion of natural gas
6.Pre burning treatment to the various effluents before discharging to
atmosphere.
7.Replacement of the damages of greenery near installations, work centers
etc.
8.Control of flare light by virtue of which majority of birds & insects have been
migrated.
9.Good design of equipment's.