on
MIVAN Technology/Formwork
Date:30-11-2021
Roll No: 19CV097 1
Sr. Title/ Author/ Journal Details of the Paper
No.
8.
OUTLINE OF PRESENTATION
1) INTRODUCTION OF FORMWORK
2) WHAT IS FORMWORK?
3) TYPES OF FORMWORK
4) INTRODUCTION TO MIVAN
5) MIVAN: - A Versatile Formwork
6) AIM AND OBJECTIVE
7) COMPONENTS (wall components, beam components, deck components, other
components)
8) PROCEDURE OF MIVAN FORMWORK CONSTRUCTION
9) WORK CYCLE
10) ADVANTAGES OF MIVAN
11) DISADVANTAGES OF MIVAN
12) ECONOMICS
13) CONCLUSION
14) REFERENCES
INTRODUCTION OF FORMWORK
Steel formwork
Mivan/aluminium formwork
Timber formwork
Plywood formwork
Fabric formwork
Plastic formwork
INTRODUCTION TO MIVAN
Stud pin
BEAM COMPONENTS
1) Beam Side Panel :-
2) Prop Head :-
3) Panel for soffit beam :-
DECK COMPONENTS
1) Deck Panels :-
2) Deck Prop and Prop Length :-
3) Soffit Length:-
OTHER COMPONENTS
The other components used excluding wall, beam and deck
components are internal and external soffit corners, exterior and
interior corners for wall panels.
PROCEDURE OF MIVAN FORMWORK
CONSTRUCTION
The construction procedure in the case of MIVAN
formwork is quite similar to the traditional type of
formwork. The steps involved in the MIVAN
Formwork Construction are as follows :
1) Setting up the Wall reinforcing steel
2) Placing formwork
3) Pouring concrete
WORK CYCLE
The system usually follows a four day cycle : -
Day 1 : -
The first activity consists of erection of vertical reinforcement bars and
one side of the vertical formwork for the entire floor or a part of one floor.
Day 2 :-
The second activity involves erection of the second side of the vertical
formwork and formwork for the floor .
Day 3 :-
Fixing reinforcement bars for floor slabs and casting of walls and slabs.
Day 4 :-
Removal of vertical form work panels after 24hours, leaving the props in
place for 7 days and floor slab formwork in place for 2.5 days.
ADVANTAGES OF MIVAN