Professional Documents
Culture Documents
Mishra DGM
LD&C PGCIL
LD&C_SCADA
Stop Gap Arrangements
WAN
HSB Adaptor
Penalty Factor
Calc.
LF/OS/IS/
ISR
OPF Schedules
Platform
STOA Possible Change in Process
Hard copy / standalone
TO RTUs T
O
Sub LDC
Serial Interface
R
T
SCADA U
SERVER s
Sub LDC
T
O
PNA WAN
SERVER RLDC
R
Sub LDC T
ISR U
SERVER s
Sub LDC/
Backup
SLDC
SLDC System
KMS
WS WS WS WS SERVER
1 2 3 4
WEB
WEB SERVER
SERVER
Metering &
Settlement ABT
ABT
Scheduling &
EXTRANET Scheduling &
Open Access
Open Access
Meters
GENCOS IPPS DISCOS
8
LD&C_SCADA
Up gradation of SLDC
(Future Issues)
System Security
SSH
SYSTEM M TERMINAL SERVER
CONSOLE
External
GPS
SCADA system
DUAL CFE
DMZ ZONE
COMMUNICATIONCOMMUNICATION
PERIPHERALS ROUTER
Encryp
FRONT END FRONT END
user
PROCESSOR PROCESSOR
SPLITTER
web & e-
1 SLDC/ Sub LDC
ted
MODEM
side
VIDEO PROJECTION
SYSTEM
mail server
JUKE TO RTUs
login
BOX
Other Utility
WORKSTATION DEVELOPMENT ICCP
SCADA /EMS ISR DTS * CONSOLE COMMUNICATION
SERVER SERVER (Only at RLDC)WITH TWO CRT SERVER- PDS
SERVER
DUAL CFE
COMMUNICATIONCOMMUNICATION
FRONT END FRONT END PERIPHERALS ROUTER
SPLITTER
1 SLDC/ Sub LDC
server
MODEM
VIDEO PROJECTION
SYSTEM
TO RTUs
Functionality Options
- SCADA only
- SCADA and Scheduling
- Full fledged SCADA & EMS
Data acquisition
- All RTUs data through Sub-LDC
- Other RTUs (reporting to SLDC) - directly reporting i.e. two masters
Technology Change-Field Interface
Control centre
Substation/Plant
Serial
Serial
IEC 60870-5-101
Serial
Trans- 4-20mA
RTU
ducer CFE
-5 - 101
80
C 60
I E
IEC 61850
GATEWAY
Serial
IED SAS
Technology Change-Field Interface
Substation/Plant
Serial
Trans- 4-20mA
RTU
ducer
Se
ria
l
IEC 61850 to
GATEWAY
Serial
IP
IED SAS co
nv
er I
te EC
r 60
87
0 -5
-1
04
IP
04
Meter 5- 1 CFE
7 0-
8
60
C
IEC 61850 SAS IE
IED GATEWAY
IP
Proposed ISR Interface
Meter &
Settlement Schedule
DATABASE DATABASE
ISR
DATABASE
Real-Time Open
SCADA Access
DATABASE DATABASE
ISR
• SCADA v/s all system ISR – Metering &
Settlement/ STOA
• ISR from 3rd party?
• ISR across the firewall (different LAN)
• Report with spreadsheet interface
• Trending
• Of different Values
• Of Same value diff timeline
• Import and configure existing database
Existing Data Base Management
System (GE system)
Office LAN
Othe r reports
As per
requirement
Scheduling Open Access
Meter DATABASE Limited Report
DATABASE DATABASE
Generation by
Specialised
software for
accessing
Sampling @ 1 Minute RDBMS system
Historical
Real-Time
RDBMS
SCADA
DATABASE
Physical
DATABASE Sampling
@ 1 Second
Continuous
Special Report
Legends Recording
Generation
Database 1 sec data
Automatic
Cyclic
Manual Buffer
THANK
YOU
Capex Planning
SYSTEM CHANGE
INSTALLED CAPACITY
2002
2009
28,092
2,241
16,191
31,374 38723
2255
27,099 20814
46347
140000
120000 41174
100000
80000 2002
60000 2007
40000
20000
2012
AS ON MAY 2009
0
IR Exchange Load
POWER SECTOR ENVIRONMENT CHANGE
ENABLERS STRUCTURE
•Legislation •Balancing Mechanism
•Indian Electricity Act 2003 •Frequency linked Unscheduled
•National Electricity Policy Interchange
•Regulation
•Intra-day STOA
•IEGC Feb 2000
•ABT Jan 2000
•Day-ahead PX
•Open Access May 2004 •Short-term Bilateral
•Power Exchange Aug 2007 •Day-ahead
•Execution •First-come-first served
•CTU/STU, RLDC/SLDC •Three-month ahead
•Grid & Market Operation •Long-term Bilateral
•Control Centres & SEMs
• Shared resources (ISGS)
•ABT settlement: in stages 2002-03
•Own resources
LD&C_SCADA
BACKUP - THREAT Vs LOCATION
Functionality Options
- SCADA only
- SCADA and Scheduling
- Full fledged SCADA & EMS
Data acquisition
- All RTUs data through Sub-LDC
- Other RTUs (reporting to SLDC) - directly reporting i.e. two masters
Proposed ISR Interface
Meter &
Settlement Schedule
DATABASE DATABASE
ISR
DATABASE
Real-Time Open
SCADA Access
DATABASE DATABASE
ISR
• SCADA v/s all system ISR – Metering &
Settlement/ STOA
• ISR from 3rd party?
• ISR across the firewall (different LAN)
• Report with spreadsheet interface
• Trending
• Of different Values
• Of Same value diff timeline
• Import and configure existing database
Proposed Data Base Management System -Features
Office LAN
Othe r reports
As per
requirement
Scheduling Open Access
Meter DATABASE Limited Report
DATABASE DATABASE
Generation by
Specialised
software for
accessing
Sampling @ 1 Minute RDBMS system
Historical
Real-Time
RDBMS
SCADA
DATABASE
Physical
DATABASE Sampling
@ 1 Second
Continuous
Special Report
Legends Recording
Generation
Database 1 sec data
Automatic
Cyclic
Manual Buffer
Technology Change-Field Interface
Control centre
Substation/Plant
Serial
Serial
IEC 60870-5-101
Serial
Trans- 4-20mA
RTU
ducer CFE
-5 - 101
0 80
Se 6
I EC rial
IEC 61850 t
GATEWAY
o
Serial
IP
IED SAS co
nv
er I
te EC
r 60
87
0 -5
-1
04
IP
04
Meter 5- 1 CFE
7 0-
8
60
C
IEC 61850 SAS IE
IED GATEWAY
IP
Technology Change-Computer Hardware
Processor- Then
Hard Disk
10/100 Mbps
8GB
RAM-1GB
LAN
Version
CRT OS-AIX 4.3.2.0
Monitor Sybase 11.9.2
ACAD 13
Maintainability?
Processor- Now
10/100/1000 Mbps
Hard Disk
72 GB
RAM-4GB
LAN
Version
TFT OS-AIX 6.1
Monitor Sybase
ACAD 2007
SCHEDULING FUNCTIONS
Scheduling (CSGS & STOA) applications
shall be separate and shall have interface Constraints Other inputs
UC
IS
ITE
COP
HTC
OS
HS
Hourly
Weather Forecasted
IF Application Schedule
Parameters water inflow
SC OPF
ATC AND
TTC Post-contingency
control recommendations
RLDC ENVIRONMENT CHANGE - ABT
CONTROL
R PS MODEL
T UI Calculation
SCADA NT SE
V SCADA/ISR
ALARMS`
S
AGC ED PF CALC.
50 Hz
OPF
INTEGRATION LAYERS
LD&C_SCADA
IEC Common Information Model (CIM)?
• A Unified Modeling Language (UML) based
information model representing real-
world objects and information entities
exchanged within the value chain of the
electric power industry
• Maintained by IEC in Sparx Enterprise
Architect modeling tools
• Enable integration of
applications/systems
• Provides a common model behind all
messages exchanged between systems
• Basis for defining information exchange
models
CIMug Access and Inetraction
GRID
SERVER
SSH
SYSTEM M TERMINAL SERVER
CONSOLE
NSA
GPS
DUAL CFE
DMZ ZONE
COMMUNICATIONCOMMUNICATION
PERIPHERALS ROUTER
Encryp
FRONT END FRONT END
SPLITTER
web & e-
1 SLDC/ Sub LDC
ted
MODEM
VIDEO PROJECTION
SYSTEM
login
internet
CISCO 1721
POWERGRID
LL Virus Wall intranet
and
Srldc.org (RH)
Proxy cent
OS
If Upgraded SRLDC-
AIX 4.3.2 to 6.1
? upgradeable
Work
station
REDUNDANT
NETWORK REDUNDANT
New UI
MANAGEMENT Application
SERVERS Servers Req Ports, Memory,
Application -
PRINTING// To be upgraded
SCADA/EMS LAN 1 interface
DEVICES
SCADA/EMS LAN 2
Exist SCADA/EMS
Solution for
Renewable
High Speed Bus/ Energy
Enterprise Bus- Integration
SOA IP based
Architectur
e
Provision for
PMU data
Built-In-Security Integration-
- System Smart grid
Resistant to
cyber attacks
Replacement- Mission Critical LDCs
Creation of
Backup CC
circumventing this
challenge
Infrastructur
e Issues
REDUNDANT REDUNDANT
Down Time
Meticulous REDUNDANT
REDUNDANT
ICCP/EMC/
NETWORK ICCP/EMC/ Planning NETWORK
APPLICATION MANAGEMENT APPLICATION
MANAGEMENT SERVERS
SERVERS SERVERS SERVERS
PRINTING PRINTING
DEVICES DEVICES
LD&C_SCADA