Professional Documents
Culture Documents
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 2
Product Allocation
1 PrepareMe
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 3
Purpose
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 7
Product Allocation Functional Overview
Product allocation functionality combines the planning and
tracking tools of the Logistics Information System (LIS) with
the real time available to promise functionality in sales order
processing.
In the LIS system, users are able to define a custom planning hierarchy
for allocations. Hierarchy levels such as sales organization, customer
group, market, and customer can be selected. Once the hierarchy is
established, the allocation quantities can be planned at any level.
For example, allocations could be planned down to the market level and
then down to the customer level for two key accounts in that market.
Consistent planning tools in LIS allow for bottom up as well as top down
planning.
Step 1: An order line item is entered for a material currently on allocation. This is
determined by reading the material master and identifying that an allocation procedure is
assigned.
Step 2: An ATP check is then carried out to see if and when the requested quantity can be
confirmed. An ATP check is not, however, a prerequisite for product allocation.
Step 3: If the order quantity unit is different than the planning unit of measure, the order
quantity will be automatically converted prior to the allocation validity. Secondly, if a
conversion factor has been established to represent a constrained component, this factor
will be used to calculate the proper allocation requested quantity prior to the allocation
check against the planning data.
Step 4: First, based upon the date in the allocation information structure activation rule,
one of three dates (delivery date, material availability date, or planned goods issue date)
from the sales order is used to validate the allocation quantity for the requested period.
Secondly, depending upon the method selected and the allocation interval, quantities are
cumulated and the future proposal dates are determined.
Step 5: If, after performing the allocation checks, the ATP schedule lines determined above
need to be modified to concur with the allocation data, a dialog message is issued to the user
to inform them of the change due to allocation. Then the user will be taken to the availability
control screen to verify these altered schedule lines. From this screen, the user can branch
to the product allocation detail screen (Go to -> Product Allocation) to investigate the changes
further.
Step 6: Upon acceptance of the delivery proposal, the corresponding allocation quantities are
reduced to reflect the consumption of the allocated inventory. Subsequent orders will then
recognize these updated figures. This is accomplished by using the real-time updating
capabilities of LIS, which insures that product is not over-allocated.
The allocation check in sales order entry is capable of reading allocation quantities at multiple
levels in the LIS planning hierarchy. Allocation would first check to see if planning was done
at the most detailed level of the hierarchy. If so, the planned quantity at this level is used for
the validation. If not, the system continues to read subsequent levels of the hierarchy until a
record is found.
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 15
Product Allocation - Configuration
Allocation Specific
LIS Specific
Allocation Specific
LIS Specific
Maintain Allocation
procedure
IMG – Sales and Distribution – Basic Functions - Availability Check and Transfer of
Requirements - Availability Check Against Product Allocation - Maintain Procedure
(Transaction code:ov1z)
Usage: The product allocation procedure is the parent of the entire allocation
process. All materials that are to be included in the allocation scheme are required to
have an allocation procedure assigned to it in the material master.
Define Object
IMG – Sales and Distribution – Basic Functions - Availability Check and Transfer of Requirements -
Availability Check Against Product Allocation - Define Object (Transaction code:ov2z)
Usage:The allocation object is the root level of the allocation process where actual data is
entered and planned in LIS. The object allows the user to further break down a procedure
into smaller parts for future validation of components comprising a specific material.
Specify hierarchy
IMG – Sales and Distribution – Basic Functions - Availability Check and Transfer of Requirements
- Availability Check Against Product Allocation – Specify Hierarchy (Transaction code:ov3z)
Usage: This transaction permits the assignment of an allocation procedure to an LIS info-
structure. This link serves as the pointer to the allocation plan data that will be verified in sales
Order processing. Additionally, in this transaction, the user must assign a ‘mask’ character to
Permit collective planning.
IMG – Sales and Distribution – Basic Functions - Availability Check and Transfer of requirements -
Availability Check Against Product Allocation – control product Allocation (Transaction code:ov4z)
Usage: In order for the allocation process to function properly, allocation control records are
created primarily to map allocation procedure steps to their corresponding objects so that the
allocation data records can be located for validation.
Secondly, validity periods must be established to indicate when the allocation control records
are active. Finally, the user has the option of establishing a conversion factor per allocation
control record to accommodate BOM listings of constrained materials. Specifically, this
factor represents the relationship between the allocation sales quantity being entered and
the component BOM quantity needed for a restricted component.
Define consumption
periods
IMG – Sales and Distribution – Basic Functions - Availability Check and Transfer of Requirements - Availability Check Against Product Allocation - Define consumption periods (Transaction code:ov5z)
Usage: The consumption window indicates the number of past and future periods to be
used in the allocation check.
The consumption window indicates the number of past and future periods to be used
in the allocation check. These two parts work together as follows:
The number of past periods identifies the number of periods before the allocation
order date that are valid for inclusion into the current allocation quantity calculation.
The unused allocation quantities present in these past periods are then cumulated
together before the allocation check of the current period.
The number of future periods identifies the number of periods after the allocation
order date that are valid for inclusion into the current allocation window. If the
requested quantity cannot be confirmed within the future period window, any
remaining quantities will remain unconfirmed.
Note: In both cases, the period definition is defined by the corresponding information
structure activation rule (I.e. Period = Daily, weekly, monthly etc). Additionally, the
selection of which date from the order should be used for period determination is also
defined there.
Only three order dates are permitted to be used for allocation validation: Delivery
date, material availability date and the Planned Goods Issue date.
Create planning
hierarchy
Usage: In order to adequately establish allocation quantities, the user must initially
determine the level at which the allocation is to take place and the aggregation factor of
the allocation quantities. In this step, the levels for the collective allocation search
procedure are also identified.
Activate
Allocation for
Schedule Line
category
Usage: In order to ‘turn on’ allocation in the standard order processing functionality, the
schedule line must have a flag indicating that allocation is relevant.
Data: Place an ‘x’ in the allocation field for those schedule line categories relevant for
allocation.
Usage: In order to ‘turn on’ allocation in the standard order processing functionality, the
requirements class must have a flag indicating that allocation is relevant.
Data: Select the allocation radio button for those requirements classes relevant for
allocation.
• Allocation Specific
• LIS Specific
Assign Customer
Statistics Group
Assign Product
Allocation Procedure
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 34
LetMe
How do I do CONFIGURATION Settings ?!!
OV1Z Maintain Allocation Procedure
2 TellMe
3 ShowMe
4 LetMe
5 HelpMe
India SAP CoE, Slide 36
Tips and Tricks
Check settings for product allocation using report RMQUOT00