STRIP MAP TYPICAL PEKERJAAN JALAN

RENCANA STRIP MAP TYPICAL PEKERJAAN JALAN

STA 0+000 s/d STA 0+750 s/d STA 1+100 s/d STA 1+400 s/d STA 2+012 s/d STA 2+062 s/d STA 2+112 s/d STA 2+137 s/d STA 3+650 s/d STA 4+650 s/d STA 5+000 s/d
STA
0+750 1+100 1+400 2+012 2+062 2+112 2+137 3+650 4+650 5+000 5+625
DESAIN PENANGANAN Typical 1A Typical 2A Typical 1A Typical 1B Typical 3 Typical 5 Typical 3 Typical 1C Typical 1D Typical 2A Typical 1D
Laston Lapis Aus (AC-WC)
Laston Lapis Antara (AC-BC)
Laston Lapis Pondasi (AC-Base)
LPA Kelas A
Timbunan Pilihan Dari Sumber Galian

BATANSUIKUNYIT
BATANSUIDURI

BC.2x(3.0x3.0)
BC.(2.0x2.0)

BC.(3.0x3.0)
BC.(2.0x2.0)

BC.(3.0x3.0)

BC.(4.0x3.0)
BC.(3.0x3.0)
BC.(3.0x3.0)

BC.(4.0x3.0)
Geotextile Komposit
Geotextile Non Woven Separator
JEM

JEM
Cerucuk dia. 10 cm

Metode Kerja Pelaksanaan Relokasi Jalan Nasional Ruas Sei Duri - Mempawah