You are on page 1of 41

ENVIRONMENTAL IMPACT ASSESSMENT (E.I.

A) FOR THE PROPOSED TWENTY-NINE (29) FLOOOR LUXURY RESIDENTIAL APARTMENTS PROJECT AT PLOT 39A & 39B, BOURDILLON ROAD, IKOYI COMMUNITY IN ETI-OSA LOCAL GOVERNMENT AREA OF LAGOS -STATE.

BY KAIZEN PROPERTIES BOURDILLON 39 LIMITED.


OUTLINE

 Project Justification  Description of the


 Introduction and Alternatives; proposed project

 Description of Project  Associated and  Mitigation Measures


Environment. Potential Impacts.

 Environmental  Decommissioning /  Conclusions


Management Closure Plan and Recommendations.
Plan (E.M.P).
INTRODUCTION:

The Mega City status of Lagos-state has continually increased human migration to the State and
that has overtime geometrically increased her population thereby creating a housing deficit
especially in some selected axis of the state and this has made it imperative for the State
Government to make concerted efforts towards addressing the obvious housing deficits and
meet the aspirations of the citizenry for decent, quality and affordable housing facilities. This
obviously is a task that cannot be left for the State Government alone in the face of other
competing demands, thus requiring the partnership of individual and corporate investors in the
real estate sector. It is in this light, that the Lagos State Government has continued to
encourage private investors to participate in the development of the State through the
provision of decent and affordable housing Units and other amenities.

In response to this call and the quest of the Lagos State Government to meet the obvious housing
deficit in the State, Messrs Kaizen Properties Bourdillon 39 Limited intends to develop a
Twenty-nine (29) Floor residential apartments project on her parcel of land measuring
about 5169.625 m2 at Plot 39A & 39B, Bourdillon Road, Ikoyi in Eti-Osa Local Government
Area of Lagos State.
As part of the regulatory requirements, the proposed development is subjected to an Environmental
Impact Assessment in order to evaluate the baseline situation of the proposed project area and
identify the likely impacts (positive or negative) that could arise from the planned project.

 To ensure sustainable implementation of the proposed project and compliance with statutory
regulatory requirements, the proposed project is to be subjected to Environmental Impact
Assessment.

 The EIA included well-planned site visits, field survey and samples collection, laboratory analyses,
and secondary data acquisition from existing reports and publications, as well as derivation of
spatially referenced data using GIS and remote sensing technologies.

 The study covered a spatial boundary of about 1.5 Kilometres radius from the proposed project site.
LEGAL AND ADMINISTRATIVE FRAMEWORKS:

Some of the Legal Frameworks pivotal to the implementation of the proposed Twenty-nine (29)

Floor luxury residential apartment development project are listed as follows;

Federal Laws:
Federal Ministry of the Environment (Formerly FEPA) Act 58 of 1988;
Environmental Impact Assessment (EIA) Act Cap E12 LFN 2004:
National Environment Standards and Regulations Enforcement Agency (NESREA) 2007;
Nigerian Urban and Regional Planning Act Cap N138, LFN 2004:
Harmful Waste (Special Criminal Provisions) Act Cap H1, LFN 2004:
Land Use Act of 1978 now (Cap L5 Laws of the Federation of Nigeria 2004);
Criminal Code Act CAP 77 LFN 1990:
The Companies and Allied Matters Act, 2020:
Workmen's Compensation Act 1987 etc.
The Companies Income Tax Act CAP C21, 2020 (as amended):

Important State laws include;


Lagos State Environmental Management and Protection Law 2017
Lagos State Urban and Regional Planning and Development Law of 2010;
Lagos State Physical Planning Permit Regulations, 2019:
The Land Use Act 2000 of Lagos State:
Lagos State Land Use Charge Law (LUCL) 2018;

Other Important Legal Instruments include;


Eti-Osa Local Government Bye Laws:
Several International Regulations, Conventions/ Treaties,
BENEFITS OF THE PROJECT:

The proposed Twenty-nine (29) Floor luxury residential apartment development project will have a
number of attendant benefits which includes:

 CREATION OF EMPLOYMENT: The proposed Twenty-nine (29) Floor luxury residential apartment
development project will provide several employment opportunities (skilled and unskilled labor)
across all phases of the project implementation.

 ECONOMIC GROWTH: Over Eighty percent (80%) of the project cost shall be injected into the local
economy which will help in stimulating the economy while the operational activities of facility shall
expectedly create new Small and Medium Scale Enterprises (SMEs).

 REVENUE GENERATION: the project shall generate revenues to all tiers of government (Federal,
State & local) via statutory levies, permits and taxes.

 REDUCTION IN CRIMES AND SOCIAL VICES: The proposed Twenty-nine (29) Floor luxury
residential apartment development project through its employment creation potentials will help to
curb crime rates and social vices within the project area as some of the idle youths that would have
hitherto been involved in criminal activities would have been gainfully employed.
AVAILABILITY/ PROVISION OF QUALITY AFFORDABLE HOUSING: The proposed Twenty-nine (29)
Floor luxury residential apartment development project when completed will make available to
individuals and investors secured, premium accommodation/ apartments equipped with state of the art
ancillary facilities for specifically designed for opulent living reminiscent of the best living spaces and
neighborhoods across the globe.

VALUE OF THE PROJECT:

The initial total investment outlay required for the proposed Twenty-nine (29) Floor luxury residential
apartment development project has been estimated at over Twenty Billion Naira
(20,000,000,000:00) which covers cost of project design, geo-technical survey/investigations,
construction works, provision of ancillary facilities, as well as acquisition of necessary approval/permits
including EIA.

The project will be funded directly by the core promoter of the project with Over Eighty (80) percent of the
total value of the project to be injected into the local economy bringing about an overall net positive
benefit to the nation’s economy.

The proposed Twenty-nine (29) Floor Luxury Apartments development project has been designed for a
minimum of Sixty (60) years after which it could be demolished and reconstructed or converted to
other uses.
PROPOSED PROJECT LOCATION:
THE PROJECT SITE IS LOCATED AT PLOT 39A AND 39B AT THE BOURDILLON ROAD END OF THE IKOYI COMMUNITY IN ETI-OSA LOCAL GOVERNMENT AREA OF LAGOS-STATE AND LIES WITHIN GEOGRAPHICAL COORDINATES: N6°26'45.40566"N; E3°26'42.44358". THE SITE IS LOCATED AT AN ESTIMATED 600M SOUTH -EAST OF LEKKI-IKOYI LINK BRIDGE WITH THE PROJECT’S LAND-TAKE IS APPROXIMATELY FIVE THOUSAND ONE HUNDRED AND
SIXTY-NINE SQUARE-METERS (5,169.625M2 )
PLATE 1: VIEW OF THE PROJECT SITE, PLATE 2: SITE ACCESS ROAD (BOURDILLON ROAD) PLATE 3: VIEW OF THE PROJECT SITE ADJOINING THE BOURDILLON ROAD.
Site Condition:

At the time of site assessment, the piling phase had already commenced with

some pilling equipment and machinery mobilized to the site. The nearest water

body is the Five Cowrie Creek which is located at an estimated 700m away from

the sites on the northern side. Based on the state of the site during assessment,

and at the present, there were no pristine environment that could promote thriving

and existence of species of conservation concern as per IUCN and CITES standard.

Furthermore, there were no cultural or archaeological objects that were reported

earlier during the pilling work in respect of the project development within the site

and likewise during the assessment or found at site.


PROPOSED PROJECT DESCRIPTION /OVERVIEW:
The project is to develop a state of the art 29-floor residential building apartment with a top class amenities

with the intention of selling the various apartment to interested buyers who shall then own and live there.

The building is a two- wing structure with a continuous vertical wall constructed from reinforced concrete

and consists of Forty-five 45 units of 4-bedroom luxury apartments. The proposed building when

completed is expected to be the tallest building in the whole of Ikoyi and by extension, Lagos State.

The building shall have the following essential features:

Swimming pools,
Gymnasium
Spa
Minimart/pharmacy
Minicrèche
Salon
Water treatment room
Bar
High speed elevators

In addition to the basic component of the proposed building as listed above, the project shall have other

complimentary and recreational services such as parking facilities with provision for disabled car parking

space, generator house a lush greenery area, basketball and tennis courts.
 
 Pile Design for the building:
The proposed Twenty-nine (29) floor residential building apartment will incorporate a total of Two
hundred and Nineteen (219) piles that will be drilled to between 48m to 60m depth below the soil
surface. The piles range from 800m to 1400 in diameter. The 1400m diameter piles shall be installed at
the middle of the building essentially to provide firm support to heavy load area such as lifts facility. The
piles designed according to the British standard are closely spaced but do not over-lap with the top of the
pile capped near the ground level with Integrity tests (Slump test and comprehensive strength test)
are then conducted on the drilled piles to ensure that they are capable of carrying the expected load
building loads.

 Effluent Treatment System:


The proposed Twenty-nine (29) floor residential building apartment project is designed to include an
efficient effluent Treatment System with Grease interceptors to be installed in all the kitchen drains to
traps oil and grease. After removing all and grease, waste water will be discharged directly into the
Sewage Treatment Plant the basement of the building where it will undergo necessary treatment before is
evacuated by LASWAMO for final disposal.
Sewage Treatment Facility:

The proposed Twenty-nine (29) floor luxury residential building apartment project will incorporate a
sewage treatment plant to take care of all sanitary waste and grey water. It is generally assumed that
one person produces 0.1m3 /day of sewage effluent (including flushing). It is anticipated that an
estimated 30,000m3/day of effluent shall be generated mostly from the toilet, bathroom and
restaurant water with traces of solid matter during the residence phase of the project. Saliently,
Sewage generated from each floor will be discharged into the treatment plant through piping system.

Water Treatment System:

The proposed Twenty-nine (29) floor luxury residential building apartment project whose primary
source of water supply shall be via a Borehole System to be sunk within the site will incorporate a
high-grade water treatment system. preliminary geophysical investigation of the properties of the
under-laying of the site, the site and the proposed project area implies the area is of high water table
and the water bearing aquifer will yield the required quantity of water sustainable for the project. An
estimated daily water consumption rate of 110,685Liters is projected for the residency phase of the
project.

The water treatment system will be in-form of cooling circuits with each cooling water circuit provided
with automatic water treatment systems that will minimize corrosion, scaling and microbiological
growth. Anti-scaling chemicals shall be fed into the system by monitoring raw water make-up.
PROJECT IMPLEMENTATION PHASES AND ACTIVITIES

S/N PROJECT PHASE ACTIVITIES

1
Site-Preparation /
Land/site Acquisition, Site Clearance, Zoning/demarcation of site,
Pre-construction
Acquisition of Regulatory approvals and permits, Mobilization of
Equipment, etc
2 Construction
Masonry, Concrete Work and Related Activities,
Trenching/excavation, Foundation works, Bored Piling Works,
Structural Steel works, Plumbing, Electrical works, Utilities
installation, H.V.A.C installations, Fire Alarm System and

Protection Systems, Ancillary works, Drainage Systems , Water


treatment Plant, Sewage treatment Plant, Landscaping, etc.

3 Operational/Residence Residency and Maintenance Activities

4 Decommissioning
Removal of Buildings and Utilities (water and fuel storage tanks,
concrete structures, storm water drainage channel. etc)
Site layout design of the proposed 29-floor building project
FLOOR AREA AND PARKING REQUIREMENT

Number of Floors 29

Number of Apartments 45

Car Parking Lots 2 per family

Car Parking Lots for Physically Challenged 15

Total Parking Requirement 157 cars

Total Parking Lots Provided 212 cars

LAND BUDGET ANALYSIS OF THE PROJECT SITE

Description of features Area occupied

Area of Site 5,169.625m2

Area to be developed 1,256 m2


Undeveloped Site Area 3,913.625 m2
Total landscaped area 650 m2

% of built area 24.30

% of unbuilt area 75.70


Floor Arrangement Plan of the proposed 29-Floor luxury Apartment building.

Description Units/flat Arrangement plan

Basement Floor 1 Car parking lots, utilities (Sewage Treatment Plant, Water Treatment Plant,
Generator plinth), restaurant, ,garbage collection point, Mini crèche, Mini
mart/pharmacy

1st floor 2 4-bedroom en-suite apartment


2nd -10th floor 2 4-bedroom en-suite apartment
11th- floor 2 1 unit of 4-bedroom en-suite apartment and 1 unit of duplex
12th and 1th -floor 1 each 5-bedroom en-suite apartment (duplexes)
13th, 15th , 19th and 21th –floor 4-bedroom en-suite apartment (duplexes)
16th –floor 2 1 unit of 4-bedroom en-suite apartment and 5-bedroom en-suite apartment each
17th –floor 2 4-bedroom en-suite apartment
18th –floor 1 A duplex and 1 unit of 4-bedroom en-suite apartment
20th and 22nd -floor 5-bedroom en-suite apartment (duplexes)
26th -floor 5-bedroom en-suite apartment (triplex)
27th -floor 2 5-bedroom en-suite apartment (triplex)
28th -floor 2 Triplex apartment
Available facilities/services Six(6 High speed elevator
Parking space for the disable with park management system
NFPA approved fire alarm/suppression system

24 hours security system


Access control system
Uninterrupted power supply
Fibre optic telecommunication system
Centralized mail/cargo delivery system
APPLICABLE CODES AND STANDARDS

 National Building Code 2006

 NIS 197: Specification for structural steel.

 NCP 01:1973 Structural use of concrete in building Pt-l and NCP 01:1973 Loading. Pt-3

 NIS 12:1974: Methods of testing concrete

 NIS 13:1974: Specification for aggregates from natural source for concrete.

 NIS 117:1992: Steel bars for the reinforcement of concrete

 NIS 87:2000: Specification for sandcrete blocks

 Applicable International codes and standards for high-rise building ;

 International Building Code IBC (ICC, 2003a)

 International Energy Conservation Code (ICC, 2003c)

 IS 456 for Plain and Reinforced concrete

 IS 873 part 1, 2, 3 and 5 for dead load, live load, wind load and combinations

 SP 34 for detailing Reinforcement

 NIS 349-1: 1997: Standard for safety of household and similar electrical appliances(Part 1)

 EN 1991: Part 1-4: General actions-Wind actions.

 Messrs Kaizen Properties Bourdillon 39 Limited’s adopted Design and Engineering Practice (DEPs).

 Messrs Kaizen properties Bourdillon 39 Limited facility design manuals.


WASTE GENERATION AND MANAGEMENT :
S/N PROJECT PHASE ANTICIPATED WASTE STREAMS

1 Site-Preparation /  Solids-excavated materials, paper, pet bottles, grease, Styrofoam, packaging


Pre-construction materials, sanitary wastes, empty cartons, Nylon, canisters, cement sludge human waste.
 Liquids- spent oils, sanitary wastes
 Gaseous Emissions-Carbon monoxide (CO), SO2Oxides of Nitrogen (NOX), and

particulate matter. PM2.5, PM10,)

2 Construction  Solids-excavated materials / Debris, grease, wood and Metal off-cuts, Paper, , Pet
bottles, packaging materials, Nylon, canisters, empty cartons Styrofoam, cement sludge,
human waste, Food wastes.
 Liquids- spent oils, Sanitary wastes
 Gaseous Emissions-Carbon monoxide (CO), SO2Oxides of Nitrogen (NOX), and

particulate matter. PM2.5, PM10,)

3 Operational/ Residency  Solids-, Cement sludge, Kitchen wastes, Furniture ,wood and office wastes, empty
cartons, Paper, Pet bottles, packaging materials, Nylon, canisters, Electronic wastes,
Styrofoam, human waste, Food wastes.
 Liquids- spent oils, grease, Waste-water, Sanitary wastes
 Gaseous Emissions-Carbon monoxide (CO), SO2Oxides of Nitrogen (NOX), and

Particulate Matter. PM2.5, PM10,)

4 Decommissioning  Solids-, Demolition rubbles/ debris, Furniture, Household/Electrical appliances Kitchen


wastes, wood and office wastes, Paper,, Pet bottles, packaging materials, Nylon, canisters,
Electronic wastes, Styrofoam, human waste, Food wastes.
 Liquids- spent oils, grease, Waste-water, Sanitary wastes
 Gaseous Emissions-T.S.S, Carbon monoxide (CO), SO2Oxides of Nitrogen (NOX), and

Particulate Matter. PM2.5, PM10,)


WASTE MANAGEMENT:

Messrs Kaizen Properties Bourdillon 39 Limited shall take all practical and cost-
effective measures to minimize the generation of wastes, by employing the four R’s
(Reduce, Reuse, Recycle and Recovery) through process of optimization or design,
efficient procedures and good housekeep. Waste shall be managed in the following ways:

 Waste stream identification

 Proper waste categorization

 Waste segregation

 Appropriate handling and disposal practice; and

 Recommended Management practice.

Messrs Kaizen Properties Bourdillon 39 Limited as a matter of Policy shall adopt the
best waste management practices and contract the Lagos Waste Management
Authority (LAWMA)’s accredited waste contractors for disposal of the Pavilion’s
generated wastes.
Manpower Requirement:
The proposed Twenty-nine (29) Floor luxury residential apartment development project will
require some personnel during the all phases of the project; the site preparation and construction
phases will require over a Hundred (100) workers while the operational/residency phase shall
require an estimated total of about Twenty (20) workers. The construction phase workers are to
work for five (5) days a week from Monday to Friday while operational phase workers are
expected to work daily in shifts and they include managers, cleaners, security personnel e.t.c.

Electricity Supply and Consumption:

The project will obtain power supply from the national grid through Eko Electricity Distribution Company

(EEDC) while Four (4) electric generators of 500kVA capacity shall also be installed as a backup

in case of power failure from the grid. The total power consumption of the building and associated

installations is estimated at 41,907kilowatt/hour including HVAC Load

Project Implementation Schedule:

The proposed Twenty-nine (29) Floor Luxury Apartments development project has been designed for a

minimum of Sixty (60) years after which it could be decommissioned, reconstructed or converted to

other uses.
FIELD STUDIES AND RESULTS:

 A one-season field study exercise was undertaken in line with the approved EIA’s
Terms of Reference by the Lagos-State Ministry of the Environment and Water
Resources for wet season between Tuesday 26th & Wednesday 27th July,2022.

 Secondary Data were obtained from approved EIA Reports for Environmental Studies
Reports that relates to the project area and similar High-rise residential development
projects around the Ikoyi axis.

 The field data collection and studies covers Air Quality, Noise Level, Water Quality,
Soil Quality and Socio-economic parameters within the proposed project environment.
GEOGRAPHICAL COORDINATES OF WET SEASON SAMPLING POINTS FOR
VARIOUS ENVIRONMENTAL ATTRIBUTES:
Sampling Code Theme Northing Easting

GW1 Groundwater N6026’41.13”, E3026’ 43.37”

GW2 Groundwater N6026’44.99” E30 26’ 41.07”

GWC Groundwater (Control) N6026’44.52” E3026’ 42.04”

AQ&N 1 Air Quality/Noise N6026’43.98” E3026’43.91”

AQ&N 2 Air Quality/Noise N6026’44.21” E3026’41.17”

AQ&N 3 Air Quality/Noise N6026’45.81” E3026’42.16”

AQ&N 4 Air Quality/Noise N6026’46.98” E3026’43.16”

AQ&N 5 Air Quality/Noise (Control) N6026’41.98” E3026’42.46”

AQ&N/C Air Quality/Noise N6026’44.96” E3026’43.61”

SQ 1 Soil Quality N6026’45.15” E3026’42.83”

SQ 2 Soil Quality N6026’44.77” E3026’442.49”

SQ 3 Soil Quality N6026’44.72” E3026’43.23”

SQC Soil Quality (Control) N6026’45.60” E3026’44.20”


SATELLITE IMAGERY DEPICTING THE VARIOUS SAMPLING POINTS:
The Results of Air Quality Measurements at the Project Area:

PM (mg/m3) NO2 SO2 H2S CO CH4 CO2


1 2.5 7 10 (mg/m3) (mg/m3) (mg/m3) (mg/m3) (mg/m3) (mg/m3)

AQ1 0.005 0.024 0.116 0.160 0.301 0.000 0.000 8.7 1.82 1117

AQ2 0.006 0.029 0.108 0.141 0.040 0.000 0.000 0.0 2.32 1551
AQ3 0.005 0.026 0.127 0.173 0.208 0.000 0.003 6.4 1.99 1126
AQ4 0.010 0.039 0.131 0.172 0.299 0.000 0.000 0.0 2.79 1190
AQ5 0.005 0.027 0.106 0.145 0.121 0.000 0.000 0.0 2.32 1181
AQ6 0.006 0.032 0.127 0.172 0.136 0.000 0.000 0.0 2.12 1401
Range 0.005 - 0.024 - 0.106 - 0.141 - 0.040 - 0.000 0.000 - 0.0 - 8.7 1.82 - 1117-
0.024 0.072 0.131 0..171 0.301 0.003 2.32 1401

MEAN 0.008 0.036 0.122 0.167 0.192 0.000 0.002 2.3 2.29 1287
NESRE 0.250 0.250 0.250 0.313 0.425 26.2 16.5 *8995
A 0.01
/FMEnv/
WHO
Limits

World Health Organization (WHO) Limit Source: Upward Trend Nigeria Limited July, 2022
AIR QUALITY ASSESSMENT RESULT:

Air Quality assessment was carried out at the proposed project site with respect to gases and TSP and these results as

well as the concentration of air quality parameters sourced from the secondary data were compared with the Nigeria Air

Ambient Air Quality Standards (NAAQS) and World Health Organization (W.H.O) Air Quality Guidelines adopted

by the World Bank. :Generally, the gases were detected, the concentration are within background levels and below

regulatory limits.

Particulates:

The recorded value during the wet season range from 10.8 to 118.0µg/m3. This is consistent with the relatively low

level of activities around the project area. Particulate matter can be of great concern to human health if present above

permissible level in an environment (WHO, 2000). Particulates are ubiquitous in the troposphere and of special interest

since they contribute to both light scattering and absorption of radiation with consequential visibility and climate effects.

Nitrogen Oxides (NOx):

For the proposed Twenty-nine (29) Floor Luxury Apartments development project, The value of NO2 recorded were below

the detection limit of 0.1ppm of the equipment used for the analysis across all the sampling locations; the obtained values

ranks within the safe limit levels as exposure to NO2 emitted from varieties of outdoor even at low concentration sources

could cause chronic irritation of respiratory tract. Headache, loss of appetite and corrosion of the teeth.

Sulphur Dioxides (SO2):

As in NOx emissions, SO2 is usually released anthropogenically when Sulphur-containing materials are involved in

combustions. Sulphur dioxide was not detected in any of the sampling locations around the project area during the

sampling periods.
RESULT: NOISE LEVEL MEASUREMENTS AT THE PROPOSED PROJECT AREA:

S/N Location NESREA LASEPA Limit Min. Noise Max. Noise Mean Noise Level
Limit dB(A) - dB(A)- Level dB(A) Level dB(A) dB(A)
Residential Residential

1. Gate 50 55 47.3 50.5 63.4

2 Project Site 50 55 43.9 47.8 73.4

3 Northern Fence line 50 55 48.0 50.1 69.1

4. Southern Fence line 50 55 45.0 48.7 73.4

5 Along Access Road to the Site 50 55 62.9 65.3

6 Control (500m from Project site) 50 55 45.2 47.2

The noise level recorded ranged from 43.9dB(A) to a maximum of 65.3dB(A), crucially, the values
recorded were generally below the permissible noise level set for residential areas by both NESREA and
LASEPA for day time. However, a breach of the limits were recorded at the sampling location along the
bourdillon road and this can be attributed to noise from vehicles plying the road; the major sources of noise
around the site are from vehicles plying the road Bourdillon road and other connecting streets in the area.
GROUNDWATER QUALITY
ASSESSMENT:

The ground water samples for the proposed project location were analyzed and results of the analysis of
samples depicted that there were no Salmonella Sp, Shigella Sp, faecal Coliforms nor heavy metals
contamination of the groundwater for the season analyzed. The samples were odourless, clear and
colourless but acidic both in dry and wet seasons.

The conductivity of all the groundwater samples including control (GW1 –GW3) were within the WHO and NIS
limits of 1000µS/cm.

The water samples were analyzed for the PTM (presence of toxic metals ) and some of the toxic metals
screened for include Cd, Cr, Cu, Fe, Mn, Ni, Pb and Zn. The presence of toxic metals in groundwater
when present above their natural or background levels could indicate contamination from anthropogenic
influences or influences from the surrounding geologic formation of the soil. If present in high
concentration in water, these metals pose health risks to living organisms including humans who
consume the water.

Crucially, the Concentrations of Pb, Cu, Ni, Cd and Cr were all below detection limit of <0.001 mg/L. The
observed concentrations of Fe in the groundwater at Station 1 at 0.31 mg/L was slightly higher than
the recommended limit of 0.30 mg L-1 while those of station 2 at 0.06 mg/L was within range.
Iron was not detected at Station 3 (GW3) at all.
The observed Mn concentration was 0.48mg/L, 0.14mg/L and 0.02 mg/L Station 1 (GW1), Station 2 (GW2)
and Station 3 (GW3) respectively.

The Mn level at Station 1 (GW1) was higher than the SON recommended limit. Other metals were all below the
threshold prescribed by SON. Generally, the results indicate that the ground water sources have not been
contaminated by heavy metals.

Microbiology Parameters of Groundwater:


Microbiology Station 1 Station 2 (GW2) Station 3 Mean Std. Dev. SON Limit (NIS 554:2015)
(GW1) (GW3)

Total Plate Count (cfu/ml) 3.0 x 101 <2 4.0 x 101 3.5 x 101 7.07 -
Total Coliform count (cfu/ml) <2 <2 <2 <2 - 10
Faecal Coliforms Count (cfu/ml) <2 <2 <2 <2 - Nil

E.Coli (cfu/ml) <2 <2 <2 <2 - Nil


Clostridium perfringens spore <2 <2 <2 <2 - Nil

The water samples were analyzed for microbial parameters including Total Plate Count, Total coliform, faecal
coliform, Clostridium perfringens spore and E. Coli and results obtained indicated that the total coliform counts were
all below the S.O.N threshold of 10. While the Total Plate Count were 3.0 x 101 cfu at Station 1 and 4.0 x 101
cfu at Station 3 respectively, the count at Station 2 was < 2.

Total coliform, faecal coliform and E. Coli were all less than 2 indicating that the groundwater resources at the
proposed project location have not been contaminated by microbes, most especially human feacal coliform.
SOCIO-ECONOMIC STUDIES:

Consultation Exercise:

 Focused Group Discussions (FGDs), Semi- Structured Interviews (SSIs), and Key Informant Interviews

(KIIs), all participatory rural appraisal techniques were used for the socio- economic data collection.

 Focused Group Discussions (FGDs) on the socio-economic and health conditions of the community were

held separately amongst the various interest groups viz: cluster of trader groups, youths, women

groups, amongst other stakeholders in the project area

 This entailed the administration of well-structured survey instrument (questionnaire) to Thirty (30)

respondents who were selected through stratified random sampling technique.

 Self-administered questionnaire technique was used for certain respondents who could read and write

while interviewer-administer questionnaire technique was used for those who could neither read nor

write, a 100% return rate for the administered questionnaire was achieved.
POTENTIAL NEGATIVE IMPACTS:

Construction Phase Impacts;


 Impacts on Air Quality:

Air-borne particulates would result from disturbances to the soil during construction activities of the
proposed luxury residential apartment project. For instance, a lot of dust would be generated during
foundation works which includes pilling. All diesel-powered facilities such as electricity generators and
heavy-duty equipment as well as project vehicles would emit SO2,CO2,NOx and other gases. Degradation
of air quality could occur due to emissions from vehicles. The emissions are short-termed and localized
within the immediate project environment.

 Impact on Noise Level and Vibration:

During construction, a lot of noise will be generated particularly during foundations works, iron cutting and
welding works as well as vehicular movement. Foundation works such as pilling for the Building
construction is expected to cause some level of vibration. Noise levels arising from these activities though
expected to exceed ambient levels at times will be transient and localized.

 Impacts on Geology:

Only minimal geological impacts are expected in the construction phase of the project, as there will be no
topographic or geologic alteration due to the construction of the proposed housing units. The landscape is
flat and needs no sand filling. Soil erosion is not anticipated as the adequate control measures will be put
in place.
  Potential Positive Impacts of the Proposed Project:
The proposed twenty-nine (29) Floor luxury residential apartment project shall come with some

attendant positive impacts and some positive impacts likely to arise from the proposed project include

the following:

Impact on Employment:

The proposed project will create employment opportunities for both skilled and unskilled labour.
Hundreds of temporary and direct employment opportunities will be created during the construction
phase of the project. Indirect employment opportunities will be created through of contractors and
suppliers of construction materials. Some direct permanent employment will be created during
operational phase particularly for facility maintenance and security.
 
Impact on Economic Growth:

The injection of over eighty percent of the project cost into the local economy will help in stimulating
the economy particularly with the current economic challenges in the Country.

 
Impact on Housing Sector:

The implementation of the proposed project will impact positively on the Housing sector. It will
provide decent and affordable housing units for the citizens, thereby helping to address the obvious
challenge of housing deficit in the State and by extension the country.
Impacts on Soil:

The potential impacts on soil resources are closely related to site clearing, site preparation and
construction. These could manifest mostly as soil erosion, land degradation and fugitive dust released into
atmosphere. Other significant potential effects on the soil include compaction, changes in drainage patterns
and contamination from discharges, leakages and accidental releases.

Impacts on Groundwater:

The Construction activities of the proposed a twenty-nine (29) Floor luxury residential apartment project is
not expected to disturb the flow of groundwater in the area, as only the topmost layer of the earth
materials would be involved during construction. The only possibility of impact on the groundwater is
expected to occur in the remote case of percolation of materials, oils and grease and wastes if not properly
stored.

Impacts on the terrestrial Ecosystem:

The components of the terrestrial ecosystems likely to be affected during any construction work of this
magnitude include vegetation and wildlife associated with the area. However, the project area and
environment is an already built-up area. The vegetation to be affected are likely to be grasses/weeds
growing on the site.
 
Impacts on Transportation

In the course of site preparation activities, there will be need to transport materials

and men to the project site at various times. The increased presence of trucks

associated with the site preparation activities may further worsen the sometimes

difficult traffic situation in the area.


 
Impacts on Waste Management

A lot of wastes are expected to be generated during the site preparation phase of this

project. These would include metal cuttings, packaging material, tins, welding

electrodes, etc. Human wastes generated from the construction work could constitute

aesthetic issues for the project area. Wastes if allowed to accumulate could lead to

contamination of soil and groundwater as well as the existing water body, particularly

if percolation and run off into the waters is allowed.


 
Impacts on Public Health and Safety:

The site preparation phase of the project would definitely bring about the movement

of different people including skilled and unskilled labour force and service providers.

This has its own attendant health and safety problems.


MITIGATION MEASURES:
Site Preparation and Construction Phases;
Impact on Air quality:
Measures to reduce dust, such as water suppression, shall be used where possible.
Regular maintenance and servicing of construction equipment that contribute to air emission shall be

implemented.
Only modern and well maintained equipment and machinery for construction activities;
Movements of men and materials shall be properly coordinated to optimize vehicle use and reduction of resultant

vehicular emissions.
Appropriate PPEs such including Nose masks shall be provided and the use by workers on site shall be enforced.

Impact on Noise Level:


All equipment are maintained as per manufacturer’s recommendations and operated as per original

specifications.
Activities associated with high levels of noise are limited to daylight hours.
Construction equipment with lower sound power levels are selected and used.
Project personnel are used appropriate Personal Protective Equipment (PPE) to reduce exposure to noise

impact (e.g. mufflers).


Impact on Biodiversity (Loss of Biodiversity):
Messrs KPB39L shall ensure:
 Site clearing is carried out in a manner that will allow some of the terrestrial fauna within the project site migrate or

escape to other areas

 Work areas are clearly marked to prevent clearing or disturbance outside areas designated for work or for clearing.

 Areas that are cleared but not used for the project shall be restored and re-vegetated.

 Re-vegetation procedures shall use native species where possible and control of invasive plants, including removal and

replacement of existing invasive plants.

Impact on Soil and Ground water:


Messrs KPB39L shall ensure:

Exposed areas of soil are re-vegetated as soon as possible.

Areas of exposed soil and soil stockpiles are reduced as much as practicable.

Excavation works are not be executed under aggressive weather conditions.

Work areas are clearly defined and where necessary demarcated to avoid unnecessary disturbance of areas outside

the project footprint

Any hydrocarbons, fuels, lubricants and chemicals to be used are stored in properly labeled oil storage tanks

(surrounded with bund wall), with hoses and gauges kept within the bund.

Waste storage areas are located on hard standing (or in a bund wall, where necessary) to prevent potential

contamination of soil and ground water


Impact on Surface Water and Hydrobiology
Messrs KPB39L shall ensure:
 Excavated portions of the soils in the area are properly compacted to avoid mass movements of loose
soil materials into the water course in the areas by all the possible agents of denudation
 Cleared vegetation/materials are properly taken care of not to be washed into surface water course
arbitrarily
 Proper sewage and waste management facilities are put in place for workers, such as mobile toilets,
waste bins so as not to leave the workers to self-help.
 Any hydrocarbons, fuels, lubricants and chemicals to be used are stored in properly labeled oil storage
tanks..
 Spill control and response plans to respond to spills and leaks are implemented.

Impact on Waste Management


Messrs KPB39L shall ensure:
 An efficient Waste Management Plan are put in place and implemented
 Waste generated from the site preparation activities are properly stored to avoid contamination of
ground and surface water.
 Waste generated from site preparation activities are disposed off using approved Waste Disposal
Service Provide.
Impact on Waste Management
Messrs KPB39L shall ensure:
 An efficient Waste Management Plan shall be put in place and implemented

 Waste generated from the site preparation activities are properly stored to avoid contamination of ground water aquifers

via percolation.

 Waste generated from site preparation activities are disposed off using government approved Waste Disposal Service

Providers.

Workmen Injuries and Fatalities:


 Appropriate Personnel Protective Equipment shall be provided and the used shall be enforced

 First Aid Box and First Aiders shall be provided on site;

 Medical Facilities such as retainer hospital shall be provided to handle critical medical cases among workmen on site
Impact on Public Health, Safety and Security
Messrs KPB39L shall ensure:
 The local communities are informed of the project activities prior to commencement of work.

 Construction contractor are briefed on the socio-cultural norms and sensitivities of the neighboring communities before

commencement of work in the area.

 Construction workers camp are developed and workforce management protocols that include workforce behavior and

interactions with the local communities shall be implemented and enforced.

A grievance resolution mechanism (which tracks grievances and responses; and respond in a timely manner with

corrective actions identified where appropriate) are developed and implemented.

 Prohibition of unauthorized access to the to the site are maintained.


Impact on Traffic and Transportation
Messrs KPB39L shall ensure:
 Journey Management Plans that take into consideration peak hour travelling times during the day and
try to avoid travelling during this time is implemented
 Drivers shall adhere to speed limits of less than 40 km/h in the project area.
 Drivers’ competency is assessed and where required training shall be provided.

Fire and Explosion


Messrs KPB39L shall ensure:
 Put in place leak detection systems and automated shut down systems
 A dedicated fire fighting system designed in accordance with NFPAIP model code of Practice 19
 Fire Prevention Systems including flame arresting devices, earthling and lightening arrestor shall be
put in place;
 Fire Response Plan supported with necessary resources shall be put in place
 Safety and Fire drills/ trainings in the use of fire-fighting equipment and evacuation shall be put in
place
 A robust Emergency Response Plan that considers the roles of neighboring facilities shall be put in
place;
 Fire Alarms and firefighting systems shall be regularly inspected and maintained.
 Fire and Safety signage shall be pasted at strategic location within the project site.
ENVIRONMENTAL MONITORING PLAN:
Monitoring Plan for Environmental Parameters;

Environmental Parameter Components to Monitor

Ambient Air Quality SOX, COX NOX V.O.Cs, Particulates,

Noise Ambient Noise level and vibration

Ground Water Quality BOD, C.O.D,T.S.S, PH, Cations, Anions, Heavy


metals and Coliform.

Soil Microbiology and TC

Wastes Types and volumes of wastes generated, collected


and disposed.
CONCLUSION AND RECOMMENDATIONS:

In the light of the detailed description of baseline environmental characteristics of the project
area, and the exhaustive impact identification in the EIA report we can without fear make the
following conclusions:
I. The proposed Twenty-nine Floor (29) luxury residential apartment development project
has potential environmental and socio-economic benefits;
II. The proposed Twenty-nine Floor (29) luxury residential apartment development project
shall bolster the economic growth and prosperity of the proposed project area, businesses
and workers.
III. Environmental Impacts such as noise, air pollution and contamination of soil, Surface and
ground water may arise from the project during construction, Operation and
Decommissioning Phases
IV. There are sufficient scientific/ engineering solutions available to effectively mitigate the
impacts on the project that may arise in the course of implementation and they are
already recommended as mitigation measures.
V. A detailed Environmental Management Plan (E.M.P) has been prepared to ensure
sustainability of the project.
VI. The Institutional framework that permits the implementation of the project make
provision for monitoring by regulators. This allows for best practice in project
implementation and avoidance of environmental mishap.