Forecasting Error

C
Djj
Material Resourse Planning

C
Djj
Components of MRP:
1. Master Production Schedule

2. Bill of Material

3. In-hand Inventory
C
Djj
Master Production Schedule:

C
Djj
Bill of Material:

C
Djj
In-hand Inventory:

C
Djj
1. Demand of a Product P is given as below:
Week 1 2 3 4 5 6
Demand P 1000 1000 1000 1000 1200 1200

A bottleneck operation is mentioned as production


of R. Find minimum production rate of R to meet
the demand. No initial inventory is available.
C
Djj
Week 1 2 3 4 5 6
Demand P 1000 1000 1000 1000 1200 1200
Demand R

C
Djj
Week 1 2 3 4 5 6
Demand P 1000 1000 800 1000 1200 1200
Demand R

C
Djj
Week 1 2 3 4 5 6
Demand P 1000 800 500 1000 700 1200
Demand R

C
Djj
Week 1 2 3 4 5 6
Demand P 500 1000 1200 1000 1400 600
Demand R

C
Djj
2. Demand of a Product P is given as below:
Week 6 7 8
Demand P 30 50 70

C
Djj
3. Data for a production process is given as under:
Holding Cost – Rs. 2 per unit per month
Regular Prod. Cost – Rs. 20 per unit
Overtime Prod. Cost – Rs. 24 per unit
Month Regular Prod. Overtime Prod. Demand
Capacity Capacity
1 100 C
Djj
20 90
2 100 20 130
3 80 40 110
For minimum cost plan, planned production in overtime in
the third month
4. Data for a production process is given as under:
Holding Cost – Rs. 4 per unit per month
Regular Prod. Cost – Rs. 20 per unit
Overtime Prod. Cost – Rs. 25 per unit
Month Regular Prod. Overtime Prod. Demand
Capacity Capacity
1 100 C
Djj 20 90
2 110 20 130
3 90 40 110
For minimum cost plan, planned production in overtime in
the third month
5. A manufacturer has following data regarding a
product:
Fixed cost per month = Rs. 50,000
Variable Cost per unit = Rs. 200
Selling price per unit = Rs. 300
Production capacity = 1500 units per month
If the production is carried out at 80% of the rated
C
Djj

capacity, then the monthly profit is


Manufacturing Resource Planning
Manufacturing Resource Planning (MRP II) is an integrated
information system used by businesses. Manufacturing Resource
Planning (MRP II) evolved from early Materials Requirement
Planning (MRP) systems by including the integration of additional
data, such as employee and financial needs.
C
Djj

The system is designed to centralize, integrate, and process


information for effective decision making in scheduling, design
engineering, inventory management, and cost control in
manufacturing.