What is the real problem here?

1st
Problem
Run Ratio reduced from 95% to 85% withn a month.

2nd
Problem
Delay in delivery of cars to the sales company as per
promise.

3rd
Problem
Too many cars needed off-line operations of one type or
another before shipping.

The longer waiting period for cars in the overflow


4th
problem
parking area where they were supposed to leave this
area within the same or the following shift

5th
Problem
Non-stoppage of line even when TPS and Jidoka
system was operated in production