3. ASPECTS OF PROJECT ANALYSIS
Risk
Financial Analysis
Return
Feasibility Study
◙ The Feasibility study is concerned with the
first FOUR Phases of Capital Budgeting viz.,
planning, analysis, selection (appraisal), and
financing; and involves market, technical,
ecological, financial and economic analysis.
◙ The Schematic diagram of the feasibility study
is shown in Figure 3.1 next slide.
Generation of Ideas
Fig. 3.2
Feasibility Initial Screening
Study: A
Schematic Is the Idea Prima Facie Promising?
Diagram Yes
Plan Feasibility Analysis
Terminate
Collection of
Demand
Secondary
Forecasting
Information
Situational
Analysis & Characteriza
Specification tion of the
of Objectives Market
Conduct
Market
Market
Planning
Survey
… Cont’d
d. Characterization of the market:
Based on the information gathered from
secondary sources and through the market
survey, the market for the product/service may be
described in terms of the following:-
♦ Effective demand in the past and present
♦ Methods of distribution & sales promotion
♦ Price
♦ Consumer
♦ Supply and competition (from substitutes &
near-substitutes)
♦ Government policy
… Cont’d
Effective Demand in the Past and Present
☺To measure effective demand in the past and
present the starting point typically is apparent
consumption which is defined as:
Production + Imports – Exports – Change in Stock Level
☺The figure for apparent consumption has to be
adjusted for consumption of the product by the
producers and the effect of abnormal factors. The
consumption series, after that adjustments, may be
obtained for several years.
YEAR Local Import Export Apparent Growth
Production Consumption Rate
2000 875,000 250,000 125,000
2001 1,250,000 375,000 137,250
2002 1,550,000 550,000 162,500
2003 1,800,000 800,000 189,750
2004 2,200,000 1,200,000 237,500
2005 3,050,000 1,800,000 377,250
2006 3,450,000 2,600,000 399,500
2007 3,850,000 3,200,000 477,890
2008 4,150,000 4,200,000 765,650
2009 4,500,000 5,600,000 895,500
Average 2,667,500 2,057,500 376,779
Required: Calculate the apparent consumption of the product and Compute the
corresponding growth rate
Methods of Demand Forecasting
Y = a + bX
Where; Y = Trend value
a = Intercept of the relationship
b = Slop of the relationship
X = Independent variable (time)
… Cont’d
b
a = Ῡ – b̅X
Where, X = Mean of X
Ῡ = Mean of Y
Advantages of the LSM
(i) It uses all the observations
(ii) The straight line is derived by an objective, statistical
procedure
(iii) A measure of goodness of fit is available
Disadvantages of LSM
(i)It is more complex compared to other methods
Illustration – Trend Projection Method
To illustrate the use of Trend Projection Method, the
following demand data for a product will be used as
shown in Exhibit 3.1 below:
Exhibit 3.1 Demand Data
Year Demand Year Demand
2003 10* 2010 20
2004 13 2011 22
2005 14 2012 23
2006 17 2013 22
2007 18 2014 24
2008 18 2015 24
2009 19 2016 25
*In thousand units
Required: Find the least Squares Regression line for the data given in
Exhibit 3.1
Exhibit 3.2 Calculations in the Least Square Method
X (time) Y XY X2
0 10 0 0
1 13 13 1
2 14 28 4
3 17 51 9
4 18 72 16
5 18 90 25
6 19 114 36
7 20 140 49
8 22 176 64
9 23 207 81
10 22 220 100
11 24 264 121
12 24 288 144
13 25 325 169
∑X=91 ∑Y=269, ∑XY=1988 ∑X2 =819
… Cont’d
(2) Exponential Smoothing Method:
In this method forecasts are modified in the light
of observed errors.
2018
Year Domestic Production Forecasted Export Forecasted Supply
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
(1) Location
Location analysis has to identify locations suitable
for the industrial project under consideration.
Traditional approach to industrial location
focused, on the proximity of raw materials and
market place, mainly with the intention of
minimizing transport costs. However, the modern
view requires consideration of not only
commercial, technical and financial factors, but
also of the social and environmental impact a
project might have.
… Cont’d
A project potentially located in a number of
alternative regions (several alternative locations
may have to be considered).
The choice of location is influenced by a variety
of considerations:
◘ Proximity to raw materials and markets
◘ Availability of infrastructure
◘ Availability of labor (especially for labor-intensive
projects)
◘ Technological and process characteristics
◘ Government policies (incentives, restrictions), and
◘ Other factors like climatic conditions, ease in coping
with pollution, general living conditions, etc.
… Cont’d
In terms of a basic location model, the optimum
location is one where the total cost viz.,
transportation cost, production cost and
distribution costs is minimized. This generally
implies that:
(i) Projects based largely on imported material may
need to be located at ports or near terminals.
(ii) A project producing perishable products or
agro-processing industries are market oriented and it
is advantageous to locate such production near the
major consumption centers.
… Cont’d
(iii) A resource-based projects like a cement plant or
a steel mill should be located close to the source of
basic material.
(iv) Petroleum products and pharmaceutical can be
located at source or near consumption centers or
even at some intermediation point.
… Cont’d
As far as financial feasibility of alternative
locations is concerned, the following data-as
well as related financial risks, should be
assessed.
♠ Production costs (including environmental
protection costs)
♠ Marketing costs
♠ Investment costs
♠ Revenues
♠ Taxes, subsidies, grant and allowance
♠ Net cash flows
… Cont’d
(2) Site Selection
Once the broad location is decided upon, a
specific project site alternative should be defined
in the feasibility study. This will require evaluation
of the characteristics of each site.
When selecting sites within the selected location,
the following requirements and conditions are to
be assessed:-
● Ecological conditions on site (soil, site hazards,
climate etc.)
● Environment impact (restrictions, standards, guidelines)
● Socio-economic conditions (restrictions, incentives,
requirements)
… Cont’d
● Local infrastructure at site location (existing
industrial infrastructure, economic and social
infrastructure, availability of critical project inputs
such as labor and factory supplies)
● Strategic aspects (corporate strategies regarding
possible future expansion, supply and marketing
polices
● Cost of land
● Site preparation and development requirements
and costs (which include the work involved in
obtaining utility connections & the related costs ).
… Cont’d
● Topography, altitude and climate may be
important for a project as well as access to water,
electric power, roads and railways transport.
● Recruitment of managerial staff and labor may
be a critical factor for the viability of the project.
Development of housing, schools, medical and
social center is necessary to attract the required staff
and labor force.
NB: Plant location and site selection can be
undertaken simultaneously.
3.5 Machineries and Equipment
Land
Building & Site Development
Equipment & Machinery
Indigenous
Imported
Know-how
Training
Miscellaneous Fixed Assets
Preliminary & Pre-operating
Base Costs
Provision for Contingency (10%)
Working Capital
Total Investment Costs
Project Life
Type of Fixed Asset Total Cost Rate Applied Year 1-5 Year 6-10
Plant & Machinery 0.00 10% 0.00 0.00
Building & Civil Work 0.00 5% 0.00 0.00
Equipment & Furniture 0.00 10% 0.00 0.00
Leased land 0.00 As per the life of 0.00 0.00
the lease
Auto, trucks, motor vehicles, etc. 0.00 20% 0.00 0.00
Pre-operating Costs (Amortization) 0.00 20% 0.00 0.00
Total Depreciation & Amortization 0.00 0.00 0.00
… Cont’d
(ii) Costs of Financing
Financial costs such as interest on term loans
should be shown as a separate item, because they
have to be excluded when computing the
discounted cash flows of the project, but are to be
included for financial planning.
When forecasting overhead costs, attention should
be given to the problem of inflation
Means of Finance
Year Year
20x1 20x2 20x3 20x4 20x5 20x1 20x2 20x3 20x4 20x5
1. Installed
Capacity(Qty/year)
2. No. of working days
3. No. of shifts
4. Est. production per day
(Qty)
5. Est. Annual production
(Qty)
6. Est. Output as % of
plant capacity
7. Sales (Qty) after
adjusting stocks
8. Value of Sales in ETB.
Cost of Production
J Operating Profit (G – H – I)
2. Profit before tax with interest added back 2. Increase in Working Capital
3. Depreciation Provision for the year 3. Decrease in secured medium & long-term
borrowings
4. Increase in secured medium & long-term 4. Decrease in unsecured loans & deposits, Decrease
borrowings for the project in bank borrowings for working capital
5. Increase in unsecured loans &deposits 5. Decrease in liabilities for deferred payment
(including interest) to machinery suppliers
6. Increase in bank borrowings for working capital 6. Increase in investments in other companies
7. Increase in liabilities for deferred payment 7. Interest on loans (term & bank borrowings)
(including interest) to machinery suppliers
8. Sale of fixed Assets 8. Taxation