You are on page 1of 18

Feasibility study for{Women's clothing

factory}

Students' names
Mohammed hadi magtof-1 the professor
Hawraa Faris Thamir-2
Hussein Qahtan Freeh-3
Wajdi A.Noor
Muntaha salah Mahdi-4

Date:2022/1/15
Index
Introduction
Subject
The basics of the project idea
Project requirements
Requirements costs
Marketing, competition and advertising
references
Introduction
In light of the economic depression that the country is experiencing and the almost complete
dependence on the public sector, it has become a duty to advance the economy and move the
wheel of economic development, and the best way to advance the local economy is to move
the private sector, which is the cornerstone of the economy of any developed country
Not the most important considerations

It will contribute to an increase in GDP

Employing the largest number of people and thus reducing the unemployment rate

Increasing the average per capita income and improving the standard of living

The operation of the private sector will guarantee the state to retain a part of the hard
currency in the short term by reducing imports and increasing it in the long run
through exports.
subject
It may not be a secret to you that Iraq is at the forefront of importing clothes,
especially from Turkey and China. For this reason, it is worth investing in this
sector.
In order to start the investment process in this field, the following is provided
*The human resour (ex: Tailor and designer)
*The natural resources(ex: Wool, cotton, leather, silk, dyes, and industrial materials
used in the manufacture of industrial clothing)
*Capital(ex: Sewing machines, embroidery machines, quilting machines, scissors,
carbon paper, needles.....etc.)
*Organizer
The basics of the project idea
1_ Goods that we will produce (Dresses, pants, shawls, headscarves, t-shirts, hats,
veils, shawls, skirts, shirts, hoodies, chadors, panties, jackets, sweatshirts, scarves(

2_The people for whom we will produce the goods (The production will be suitable
for all ages and target the poor and middle-income class in particular)

3_ the production mechanism followed


It requires finding the best way to produce the largest quantity of goods and services
at the lowest possible cost, in addition to reducing the waste of scarce resources
during the production process.
Project requirements
1-Location and building: Dhi Qar Governorate _ Mustafa Street _ near the baho building

2-labor
tailors
designers
Over_look
clothes iron
3-machines
sewing machines
embroidery machines
Pearl installation machine
sorbet machine
Project requirements
4-Tools (scissors, sewing needles, rulersize markers, carbon paper, detailing table,
clothes iron)

5- sewing thread (Wool, cotton, linen, silk, rayon, metallic thread)

natural fabrics (ex: Cotton, silk, wool, leather, jute and linen)
6- fabrics
industrial fabrics (ex: Chiffon, acetate, nylon, polyester,
georgette, cashmere…….atc)
Requirements costs
① fixed cost
a) renewed
element numbers Monthly salary for one Total monthly salary Total annual salary
Rent of building 700$ 8400$

tailors 10 350$ 3500$ 42000$

designers 1 900$ 900$ 10800$

Over_look 1 300$ 300$ 3600$

reverso context 1 300$ 300$ 3600$

Security guard 1 275$ 275$ 3300$

Water and electricity taxes 150$ 1800$

total 6125$ 73500$


Requirements costs
① fixed cost
b) semi fixed

hardware the number cost of one total cost


sewing machines 8 250$ 2000$
embroidery machines 2 3500$ 7000$
clothes iron 1 45$ 45$
Pearl installation machine 1 1500$ 1500$
sorbet machine 1 400$ 400$
scissors 20 2.5$ 50$
detailing table 8 20$ 160$
total 11160$
Requirements costs
2) variable costs
a) fabrics
Name fabrics Price is for 100 meters
silk 160$
Italian cashmere 100$
Corduroy 80$
leggings 100$
flannel 100$
sawfat 200$
gold water 240$
Sultan's harem 320$
String 80$
kabwe kashmir 240$
qadifuh 100$
keyboard 150$
Requirements costs
2) variable costs
b) sewing accessories
Name accessories price
strings for 1 kg $ 10-15
pearl for 1kg 5$
sutag for 100m 15$
clothes imprint for one 0.25-1$
roses for one 0.1-0.3$
buttons for 1 kg 10-15$
Requirements costs
2) variable costs
c) Ads
d) Transport fuel

3) Mixed cost
• Equipment maintenance
Requirements costs
To produce a dress with an exclusive design, the production requirements one
were as follows
production requirements cost
Fabric Sultan's harem 8$
Clothes Accessories 1$

If the fixed costs in the first month of the opening of the factory amounted to
$17,000, $11,160 of which is the costs of purchasing equipment.
If one dress was sold for $26, how many dresses would be required to be sold
in the first month to achieve the break-even point? And if the same number is
sold in the second month, will the project win or lose??
Requirements costs
The sales = fixed cost + variable costs + net profit
26x =17000 + 9x +0

x=17000/17
x = 1000 a dress

"If the same number is sold in the second month, the costs of purchasing
equipment will be neglected because it is calculated one time if a new one is
purchased. Thus, the project will profit by the cost of purchasing equipment"
Requirements costs
cost-volume-profit (CVP) graph
Marketing, competition and advertising
Competing foreign brands in the Iraqi market
 havos → Turkey
Bespikaofficial → Turkey
Eyyo.com.tr → Turkey
Bk_espada → Turkey
Storets → china
Patpat → china
 ‫ →رافية‬Egypt
Competition and Marketing
Marketing Methods:
 Marketing through personal advertising
Referral Marketing to Customers
Social Media Marketing
Advertising using posters
Delivery Services
‫‪references‬‬
‫مقا‪HH‬لة ا‪H‬حمد عمر ا‪HH‬لراويف‪HHH‬يا‪HH‬الستثمار ف‪HHH‬يا‪HH‬لقطاع ا‪HH‬لخاصعل موق‪H‬ع‪1- researche gateH‬‬
‫ب‪HH‬يج "ماكناتص‪HH‬احبا‪HH‬لسع‪H‬اده‪ "H‬عل موق‪H‬ع‪ H‬ف‪HHH‬يسب‪HH‬وك ‪2-‬‬
‫مجمع‪ H‬مالبسا‪HH‬لجوهره‪_H‬محاف‪H‬ظة ا‪HH‬لنجفا‪HH‬الشرف_ا‪HH‬لكوف‪H‬ه‪3- H‬‬
‫موق‪H‬ع‪ H‬س‪HH‬طور ‪4-‬‬
‫‪https://sotor.com/%D8%A3%D9%81%D8%B6%D9%84-‬‬
‫‪%D8%B7%D8%B1%D9%82-%D8%A7%D9%84%D8%AA‬‬
‫‪%D8%B3%D9%88%D9%8A%D9%82-‬‬
‫‪%D8%A7%D9%84%D9%86%D8%A7%D8%AC%D8%AD%D8%A9/‬‬

You might also like