Professional Documents
Culture Documents
Pump Modification
Pump Modification
Breakdown Status
< 6 Month
Time Taken to Execute Project
Boring in Pump shaft Pump shaft and • Project execution time 90 Days
Pump body Added SS part Boring in SS part
pump seal mechanical seal
Shaft diameter is12 mm. Increase shaft diameter form 12 mm to 15 mm Project Partners
Impeller is fixed with shaft by only ss Impeller diameter increase to 15 mm and tighten 3K/annum
key. with bolt
Transforming for growth .
Transforming for growth
Connecting, pioneering, trusted
Connecting, pioneering, trusted