Employees must ensure that the company’s interests are never compromised
- Incorporate TIC
where cooling
Reactor Rupture of High pressure C 3 3C fluid in the jacket
(R-101) reactor vessel and temperature maintains the 3D
in tank temperature of
(exothermic the reactor
runaway)
- Incorporate
pressure relief
valves
-Thermal -Regular
expansion of inspection of
fluid due to sun pressure control
Storage exposure or valves
Tank external heat
(E-106) source
- Pressure gauge
-Inadequate readings should
ventilation due D 2 2D be recorded 3D
to pressure relief regularly
Explosion valve failure
-Safety showers
-Automated are designed to
pressure control pour water on
system personnel in
malfunction case of fire
- proper
•
ventilation
-minimizing
•
potential
ignition sources
Methanol
getting in • -Installing fire
contact with D 2 2D detection and 3D
Vaporizer Explosions • Vaporizer
sparks, hot (E-101) suppression
(E-101) surfaces, or systems
open flames
- Safety Showers
are designed to
pour water on
personnel in
case of fire
Incorporate FIC
Flooding of the Reboiler duty is C 3 3C to control the 3D
column above set point steam flow to
Distillation the reboiler,
Column decreasing it
(E-103)
-Non - installation of
Release of installation of carbon Review
Absorber hazardous gas gas D 4 4D absorbers not
(E-102) to atmosphere Capturers maintenance of required
gas absorption
system
-Failure of flue
gas capturing
system
HAZOP