Professional Documents
Culture Documents
Extactor MD04 v1
Extactor MD04 v1
• Material Master
• Bill of Material
• Sales Orders (MTO
process)
• Delivery Schedule
• Purchase
• All the information
save into Z tables
BI System
• Work Center • Planned Requisition
• Routings Independent • Production Order
Requirement (MTS
process)
Tcode MD04
Table 1 Header
Table 2 Details
Extractor
Considerations: In this example it is a single material and the detail table is 17 records, for example if
there are a total of 100 materials and assuming that the MRP result generates 15 records, the detail
table would have 1,500 records.