You are on page 1of 15

WELCOME

KANNUR INTERNATIONAL AIRPORT PROJECT

CAD Standard
Date – 10th February 2014
Content with Title Block
CAD Compliance Check List
File Format & Release
File Reference
Layer Reference & Description
Layers Properties-Color, Line Type & Line Weight Control

Right

Wrong
ByLayer Property

Right

Wrong
Xrefs Path Type & Reference Type
Units & Coordinates
Orientation
eTransmit
Revision Cloud

Revision Clouds and Triangles


Each area where changes/revisions
made since the last issue / submission
i shall be ringed with a cloud and marked
with an equilateral triangle containing
the current revision letter.

ii Revision clouds and its triangle label


shall be placed on the paper space.
Arc length of cloud shall be 15 as a
iii
general rule to maintain consistency.
Revision clouds shall be 1.0mm thick
iv (gray or colour 252) and triangles shall
be placed on layer REV.
Clouding and revision triangles
v denoting the previous revision shall be
removed from the CAD file.
To follow

1. Model space & paper space


2. Associate Leader & Associative Hatch
3. Text Style
4. Dimension Style
5. Block & Attributes
6. Survey Xref in Layout drawings
7. Content
8. Legend
9. Reference
10. Abbrevation
11. Drawing numbers
12. CAD Compliance Check List
13. Index Sheet
THANK YOU

You might also like