Organization Chart
• Reason:
• Organize the mold staff of the group
– Follow-up customer / mold maker
– Mold testing
– Mold construction phase
– Production plant transfer phase
– Industrialization of molds in production plant
CONFIDENTIAL
Organization Chart
Modal Set up of
Mold
tracking production production
developement
release plant
production
Production molds
Follower molds
Responsable molds
Project manager
CONFIDENTIAL
Organization Chart
CEO
J. Martinez
Dir Tech
Jorge Dib
technical
support
JM / Eloi / Karim
CONFIDENTIAL
Organization Chart
projects Industrialization Shopping Commercial
CEO CEO CEO CEO
J. Martinez J. Martinez
J. Martinez J. Martinez
CONFIDENTIAL
Organization Chart
WORK TEAMS
IND
J. Martinez
Technical support
per plant
J.M / Karim / JD / Eloi
Team 1 team 2
CONFIDENTIAL
Organization Chart
Mold resp Mold resp Project
Prod plant manager
adjudication mold ma 1 4 4
dfm 1 4 4
mfa (moldflow) 1 4 4
CONFIDENTIAL
Organization Chart - Responsable Mold
Mold adjudication
- Commercial:
- It is presented from commercial minimum 3 offers of approved suppliers
- Purchase targets are shown
Molds
- Moldes Management requests the offers it deems necessary
MOLDS
- Presents supplier within agreed conditions address
- According to agreed address table
- >25% profit – no authorization
- 10 – 25% authorization Dir OP
- <10% CEO authorization
SUPPLIER NOMINATION
- CONFIDENTIAL
Organization Chart - Responsable Mold
DFM MFA
- Imputs. Imputs:
- 3D - 3D
- 2D - Material
- Technical specifications - Assigned machine
- FMEA - IN Injection Parameters
- Standards -
- LLAA Outputs
- Molds Standard MFR and acceptance
- Refrigeration and PtOs
- Outputs Injection
- - OUT parameters for FOTP
- - CAD PIECE
- - Cad Mold
- Timing construction
CONFIDENTIAL
Organization Chart - Responsable Mold
Preliminary Project Review
Responsible molds leads the review through Check List XXXXXXX of the mold project.
In a meeting, the production team (responsible for plant molds) is summoned for joint
review. It is not necessary to sign "Production molds" for the validation of the check
- OK to STEEL
- OK to MILL
CONFIDENTIAL
Organization Chart - Responsable Mold
MONITORING TIMING CONSTRUCTION
Responsible Mold is responsible for the monitoring and validation of mold timing
Escalation in case of KO
-
- PM
- RESP PROY
CONFIDENTIAL
Organization Chart - Responsable Mold
FOT PREPARATION - Documentation, parameters
2 weeks before FOT the documentation for the preparation of FOTP is reviewed together with the supplier
- Delivery of parameters to molder for FOT (parameters based on Material sheet and similar processes in the
group.
- Objective of the test
- Cycle
- Scrap
- Number of pieces (PM)
- Shipment(PM)
- Required documentation and dates.
-
- Output
- Video
- Parameters (cycle obtained)
- Checks T0/T1..
- Check Mold Test
- Pdca
- Estimated date for T “+1”
CONFIDENTIAL
Organization Chart - Responsable Mold
Follow-up TESTS mold (T0 - T1 -T2….)
Quality / Molds / PM
CONFIDENTIAL
Organization Chart - Responsable Mold
PREPARATION DOC PLANT
Responsible for Molds, collects all the pertinent information of the mold.
This documentation should be found in the project folders following the following scheme:
Flat 2D
3D mold
Mold Maker Release Parameter Sheet
Material sheet (it is given in ILS system)
Peripheral Documentation – Mold Feature Specification)
Digital documentation in folders according to image
List of critical spare parts
Mold maintenance plan in case of requiring any specific
The mold must be introduced in the document "mold grapher" with all the specifications required in this
dichero
CONFIDENTIAL
Organization Chart - Responsable Mold
Liberación molde Moldista
Quality / Molds / PM
- After OK for internal/customer quality and PM of compliance or authorization if one point is NOK.
CONFIDENTIAL
Organization Chart - Responsable Molde
FOT Novatec (production plant)
CONFIDENTIAL
Organization Chart - Plant Molds
Fine Tuning Novatec (production plant)
Responsible plant molds leads the mold level tests and is responsible for the set-up and validation of mold.
INPUTS
-Point treated in previous slider
Documents / Outputs
Check list reception mold
Check tests / mold release
PDCA
- Mold incidents
CONFIDENTIAL
Organization Chart - Plant Molds
Release / validation mold transfer production
For the acceptance of the process, the transfer + project closure must be made with points not opened
or validated by Management through monthly monitoring PM and Group Directive.
CONFIDENTIAL
Organization Chart - Relations
RELATIONS
CONFIDENTIAL