You are on page 1of 116

REORIENTA

SP
1

ON
TION
2

5
STRATEGIC PERFORMANCE MANAGEMENT SYSTEM

6
1 COURSE OUTLINE
2 This Reorientation on SPMS intends to
discuss the following:
3
• Government Issuances Related to SPMS
4 • General Concepts and Objectives
• The Performance Management Team (PMT) and PMS Cycle
• Personnel Performance Measures
5 • Performance Standards Guide
• Rating Forms, Mechanisms and Computations
6
Source: Guidebook on the Strategic Performance Management System
1

QUICK OF

MAND
2

TH
3

4
GLIMPSE
E
5
GOVERNMENT ISSUANCES RELATED TO SPMS

6
House of Representatives and The Senate
1
Congress Joint Resolution No. 4
Governing Principles of the Modified Compensation and Position
2 Classification System and Base Pay Schedule of the Government

3 Item 1 (d) A performance-based incentive


scheme which integrates personnel and
4 organizational performance shall be established
to reward exemplary civil servants and well
5
performing institutions.
6
House of Representatives and The Senate
1
Congress Joint Resolution No. 4
Governing Principles of the Modified Compensation and Position
2 Classification System and Base Pay Schedule of the Government

3 Item 4 Step Increments – an employee may progress


from Step 1 to Step 8 of the salary grade allocation of
4 his/her position in recognition of meritorious
performance based on performance management
5 system approved by the CSC and/or through length
of service, in accordance with the rules and
6 regulations to be promulgated jointly by the DBM
and the CSC.
House of Representatives and The Senate
1
Congress Joint Resolution No. 4
Governing Principles of the Modified Compensation and Position
2 Classification System and Base Pay Schedule of the Government

3 Item 17(c) The CSC, in developing the Performance


Management System, shall ensure that personnel
4 performance shall be linked with organizational
performance in order to enhance the performance
5 orientation of the compensation system.

6
Office of the President
1
Administrative Order No. 241
Mandating the Speedy Implementation of R.A. 9485 otherwise
2 known as the “Anti-Red Tape Act of 2007” and its Implementing
Rules and Regulations and Strengthening the Application Thereof
3
Section 5 Agencies shall institute a Performance
4 Evaluation System based on objectively measured
output and performance of personnel and units,
5 such as the Performance Management System-
Office Performance Evaluation System developed
6 by the CSC.
Office of the President
1
Administrative Order No. 25
Creating an Inter-Agency Task Force on the Harmonization of
2 National Government Performance Monitoring, Information and  
Reporting Systems
3
A collaborative mechanism must be developed among these
4 oversight agencies that will establish a unified and integrated
Results-Based Performance Management System (RBPMS)
across all departments and agencies within the Executive
5
Branch of Government incorporating a common set
performance scorecard, and at the same time, creating an
6 accurate, accessible, and up-to-date government-wide,
sectoral, and organizational performance information system.
Civil Service Commission (CSC)
1
Memorandum Circular No. 6, s. 2012
Guidelines in the Establishment and Implementation of Agency
2 Strategic Performance Management System (SPMS)

3 Through Resolution No. 1200481 promulgated on


March 16, 2012 The CSC directs all government
4 agencies, including Local Government Units
(LGUs), to establish and implement the Strategic
5 Performance Management System (SPMS) based
on the guidelines provided thereof.
6
Department of Budget and Management (DBM)
1 Civil Service Commission (CSC)
Joint Circular No. 1, s. 2012
2 Rules and Regulation on the Grant of Step Increment/s Due to
Meritorious Performance and Step Increment/s Due to Length of Service
3
Item 5.1.1 Two (2) Step Increments due to
4 Meritorious Performance may be granted to a
qualified official or employee who has attained two
5 (2) ratings of “Outstanding” during the two (2)
rating periods within a calendar year.
6
Department of Budget and Management (DBM)
1 Civil Service Commission (CSC)
Joint Circular No. 1, s. 2012
2 Rules and Regulation on the Grant of Step Increment/s Due to
Meritorious Performance and Step Increment/s Due to Length of Service
3
Item 5.1.2 One (1) Step Increment due to
4 Meritorious Performance may be granted to a
qualified official or employee who has attained one
5 (1) rating of “Outstanding” and one (1) rating of
“Very Satisfactory”, or two (2) ratings of “Very
6 Satisfactory”, during the two (2) rating periods
within a calendar year.
Local Government Unit (LGU) of Santa Cruz
1
Executive Order No. 19, s. 2012
Establishment and Implementation of Agency SPMS of the
2 Municipality of Santa Cruz, Davao Del Sur and Designating the
Composition of The Performance Management Team
3
In order to adhere with and institutionalize this national
4 mandate, there is a need to establish and implement
the Strategic Performance Management System which
5 will be anchored to the mission and vision of this
agency by organizing the Key Players of said system to
6 follow through the SPMS process.
1 Civil Service Commission (CSC)
Memorandum Circular No. 13, s. 2011
2 Pursuant to Resolution No. 1100472 dated April 8, 2011

3 A Supervisor shall be the one who plans, programs,


delegates tasks and evaluate performance of
4 employee; monitors work outputs; maintains morale
and discipline among employees; develops
5 cooperation and ensure a well coordinated
workforce; and coordinates and cooperates with
other organizational units within the agency.4
6
4
Presidential Decree 988 Defining the Role, Duties and Responsibilities of Chiefs of Divisions in
the Departments and Agencies of the Government and Regularizing their Appointments (1976)
1
NON-COMPLIANCE
Non-compliance or violatioOR to these
VIOLATION
mandates and provisions may be ground for
2 disciplinary action(s) provided under:

3
• Book V of Executive Order 292
Administrative Code of 1987
4
• CSC Resolution No. 1101502
5 Revised Rules on Administrative Cases in the Civil Service (RRACCS)

6 Sanctions/Penalties also includes Disqualification for Performance-


Based Personnel Actions which would require the rating.
SP
1

2 TH
3
E
4

5
GENERAL CONCEPTS AND OBJECTIVES

6
1
? Why switch to Strategic Performance
Management System (SPMS)
2 The past performance evaluation and appraisal systems that
CSC implemented over the years have largely focused only
3 on individual appraisals, which were used for personnel
actions such as incentives, promotion, and separation.
However, they have not shown how employee performance
4
has contributed to or hindered organizational effectiveness.

5 To address the gaps and weaknesses found in previous evaluation


systems, the CSC recently introduced the Strategic Performance
Management System (SPMS) after its pilot test in 2011. The SPMS
6 incorporates the positive features of past initiatives.
Source: Guidebook on the Strategic Performance Management System
1
? Why switch to Strategic Performance
Management System (SPMS)
2
Using the Performance Evaluation System (PES), the LGU
and its employees have encountered many issues as far as
3 performance appraisal is concerned.
• Generally ineffective in setting individual targets
4 • Performance Target and Performance Rating were done at same
time at the end of the rating period
5 • Employees basically did it for mere compliance
• No performance standards were set
• The ratings were subjective
6 • No commitment between the rater and the ratee
Source: Strategic Performance Management System (SPMS) Manual
1
? Why switch to Strategic Performance
Management System (SPMS)
2
To address all of these issues and weaknesses
3 found in the existing performance evaluation
system, the LGU Santa Cruz adopted a new
4 system, the so called Strategic Performance
Management System (SPMS).
5

6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Concepts

A systematic process by which an agency


3 involves its employees, as individuals and as
members of a work unit, in improving
4 organizational effectiveness in the realization of
the agency’s vision, mission and strategic goals.
5

6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Concepts

The accomplishment of work performed


3 by employees is tightly linked with the
4
over-arching vision of the agency so that
the employees’ work targets and subsequently
their work accomplishments serve to advance the
5
attainment of organizational goals.
6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Concepts

An instrument that measures work


3
performance by individual employees and
4 the work units to which they belong, including
the work performance of the entire agency.
5

6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Objectives

To concretize the linkage of overall


3
performance of the Municipal Government
4 of Santa Cruz with its Municipal Comprehensive
Development Plan (MCDP) and the Philippine
5 Development Plan (PDP).

6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Objectives

To ensure organizational effectiveness


3 by cascading institutional accountabilities to the
various levels of the organization anchored on
4 the establishment of a scientific basis for
performance targets and measures.
5

6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Objectives

To link performance management


3
with other HR Systems using one
4 platform, such that only one basis is used in
performance evaluation, HR planning and
5 interventions, rewards and incentives, discipline
and personnel actions.
6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Objectives

To improve organizational and individual


3 performance through a systematic
4 approach via an ongoing process of establishing
strategic performance objectives, measuring
5 performance, and collecting, analyzing, reviewing,
and reporting performance data;
6
Source: Strategic Performance Management System (SPMS) Manual
1

2
SPMS The Objectives

To align individual and organizational


3
performance with the latter’s strategic goals
4 by putting premium on performance results of
the organization.
5

6
Source: Strategic Performance Management System (SPMS) Manual
MANAGING
1

SYST
2

3 TH
4
ETHE MANAGEMENT TEAM & THE PMS CYCLE
5

6
1 PERFORMANCE MANAGEMENT TEAM
2 The Performance Management Team (PMT) will
spearhead the establishment and implementation of
3 the SPMS in the agency. The PMT shall be composed of
the following:
4 • Executive Official designated as Chairperson
• Highest Human Resource Management Officer
• Highest Human Resource Development Officer
5 • Highest Planning Officer
• Highest Finance Officer
• President of the accredited employee association
6
Source: Guidebook on the Strategic Performance Management System
1 PERFORMANCE MANAGEMENT TEAM
2 Presently, the Performance Management Team (PMT) is composed
of the following designated personnel:

3 CHAIRPER ROBINSON B. PANUDA


Municipal Accountant
RESPONSIBILITIE
SON: S consultation
• Sets OF PMT meetings with all Heads
of Offices to discuss the office performance
ANITA S. LUMANOG
4 MEMBERS Human Resource Management Officer
commitment and rating system and tools.
• Ensures that office performance management
: AURORA S. HERBITO
targets, measures, and budget are aligned
with those of goals of the agency.
Municipal Planning and Development Coordinator
• Recommends approval of the office
5 ALEJANDRA A. MANTO
performance and rating system and tools.

ICO-Assistant Municipal Treasurer • Acts as appeals body and final arbiter.


• Identifies potential top performers for awards.
JONATHAN P. DELA CRUZ • Adopts its own internal rules, procedures,
6 President, SCMEU and strategies to carry out its responsibilities.

Source: Strategic Performance Management System (SPMS) Manual


1 PERFORMANCE MANAGEMENT
SYSTEM (PMS) CYCLE

2
Stage 1. Performance
Planning and Commitment
3 is done prior to the start of the
performance period where
heads of offices meet with the
staff and agree on the outputs
4 that should be accomplished
based on the goals and
objectives of the organization.
5

6
Source: Guidebook on the Strategic Performance Management System
1 PERFORMANCE MANAGEMENT
SYSTEM (PMS) CYCLE

2
Stage 2. Performance
Monitoring and Coaching
3 is done regularly during the
performance period by the
Heads of Agency, Planning
Office, Division and Office
4 Heads, and the individual. The
focus is creating an enabling
environment to improve team
5 performance and develop
individual potentials.

6
Source: Guidebook on the Strategic Performance Management System
1 PERFORMANCE MANAGEMENT
SYSTEM (PMS) CYCLE

2
Stage 3. Performance
Review and Evaluation
3 is done at regular intervals to
assess both the performance
of the individual and the office.

6
Source: Guidebook on the Strategic Performance Management System
1 PERFORMANCE MANAGEMENT
SYSTEM (PMS) CYCLE

2
Stage 4. Performance
Rewarding and
3 Development Planning
is based on the results of the
performance review and
evaluation when appropriate
4 developmental interventions
shall be made available to
specific employees.
5

6
Source: Guidebook on the Strategic Performance Management System
1

MEASURHO
PERFO
2

WE W
ING
3

5
PERSONNEL PERFORMANCE MEASURES

6
GENERAL
1
CONCEPT
2
The SPMS focuses on measures of performance results that are
reviewable over the period of the implementation and provides a
3 scientific and verifiable basis in assessing organizational
performance and the collective performance of individuals in the
4 organization.

6
GENERAL
1
CONCEPT
2
It is a tool for managing performance in ways whereby work
accomplishments are monitored throughout the span of the
3 performance rating period, and not merely paid attention at the
end of such period when ratings are already determined.
4

6
GENERAL
1
CONCEPT
2 • Outputs are measured through
performance measures:
3

4
QUANT Number or Percentage of
accomplished task or workload

ITY
5 EFFECTIV Getting the right
things done

ENESS
6
TIMELI Meeting timeframe as
set in the work plan
FOLLOW
1

5
STANDA
THE
PERFORMANCE STANDARDS GUIDE

6
1 PERFORMANCE STANDARDS GUIDE
2 The Performance Standards Guide serves as the
yardstick in rating every accomplishment or output as
3 agreed upon by and between the work unit head as
rater and the individual employees as ratees.
4
The agreed office standards indicates the rating scale
for every expected output relative to the performance measures
5 which are in-line with the success indicators determined by both
the head of the work units and their respective employees
accordingly.
6
Source: Strategic Performance Management System (SPMS) Manual
1 PERFORMANCE STANDARDS GUIDE
2 A numerical rating scale ranging from 1 to 5 - with 1 as the lowest
and 5 as the highest, shall be the basis in rating the outputs.

3 SAMPLE FILE
RATING EFFECTIVENESS STANDARD RATING TIMELINESS STANDARD
EXPECTED OUTPUT
(per output) (per output) (per output) (per output)
201 FILE 5 All Documents Completely Filed 5 Filed 5 days after receipt of validated appointment

4
4 Lacking 1 Document 4 Filed 10 days after receipt of validated appointment
3 Lacking 2 Documents 3 Filed 15 days after receipt of validated appointment
2 Lacking 3 Documents 2 Filed 20 days after receipt of validated appointment
1 Lacking more than 3 Documents 1 Filed 30 days or more after receipt of validated appointment
201 INDEX CARD 5 No Error 5 Prepared less than 30 minutes per index card
4 1-2 Errors 4 Prepared 30 minutes per index card

5
3 3 Errors 3 Prepared 1 hour per index card
2 4-5 Errors 2 Prepared 2 hours per index card
1 More than 5 Errors 1 Prepared more than 2 hours per index card
ABSTRACT OF BIDS 5 No Error 5 Prepared immediately after Opening of Canvass
4 4 Prepared 1-3 working days after Opening of Canvass
3 3 Prepared 4-5 working days after Opening of Canvass

6
2 With Error 2 Prepared 6-7 working days after Opening of Canvass
1 1 Prepared more than 7 working days after Opening of Canvass
From the Office Performance Standard Guide of the MMO-Human Resource Management Section

Source: Guidebook on the Strategic Performance Management System


RATING OF
1

OUTP
2

5
FORMS, MECHANISM AND COMPUTATIONS

6
1

2
SPMS Rating Forms

• Output Rating Sheet


3 • Monthly Performance Output Report
4 • Summary of Accomplishments
• Individual Performance Commitment & Review
5
• Quarterly Accomplishment Report
6 • Office Performance Commitment & Review
1

2
SPMS Rating Forms

4
To be Accomplished by Head of Office/
5
•Supervisor/Rater only Report
Quarterly Accomplishment
6 • Office Performance Commitment & Review
• Output Rating Sheet
1

MUNICIPALITY OF SANTA CRUZ DESCRIP


2 TION
MMO-Human Resource Management Section
• Most Basic Rating Form
OUTPUT RATING SHEET • Used to Monitor Output
3 Ratee’s Name: ______________________________________
• A Verifiable data and basis

Output: _____________________________________________
Date/Time Requested/Received: ___________________ The Rating Process
4 Date/Time Accomplished: __________________________
essentially begins
Date Submitted by Ratee to Rater: ________________
Rating: with the Output
5 Quantity: ______ Effectiveness: ______ Timeliness: _____
Remarks: ___________________________________________
Rating Sheet (ORS)
___________________________________________
Rater’s Signature/Date: ____________________________
6 Date Returned by Rater to Ratee: __________________
MECHANISM
1
The Rating of ORS basically follows four (4) General Steps:
2
INPUT Task at hand. Functions, responsibilities,
request, etc. that are expected to be done.
3
OUTPUT Performance. Perform and accomplish
the functions, responsibilities, request, etc.
4

5
ORS Filling-Up. Fill-up ORS accordingly.

6 RATING For Rating. Together with the ORS, submit


the accomplished document, report, etc. to
immediate supervisor for rating.
MECHANISM Sample No.1 Application for Leave
1

1 INPU Four (4) employees requested


2
3
applications for leave dated When done, she will fill

T June 15, 2014. ORS up the Output Rating


Sheet accordingly.

4
2 OUTP
UTEgal will prepare the
ALLAN EGAL
APPLICATIONS FOR LEAVE
Allan 06/15/2023

5 documents as requested.
06/17/2023
06/17/2023
She accomplished it on June 17, 2023,
two (2) days after the requests.
6
MECHANISM Sample No.1 Application for Leave
1

4 RATI Rina Fe will submit the document to


2 the HRMO for review and signing

NG with the ORS attached. ALLAN EGAL


APPLICATIONS FOR LEAVE
06/15/2023
06/17/2023
3 The HRMO will review the correctness and 06/17/2023
completeness of the documents submitted 4 5 3
and rate it accordingly based on the
4 Performance Standards Guide. 06/17/2023
06/17/2023

5 EXPECTED RATING
QUALITY
STANDARD
RATING TIME STANDARD
OUTPUT (per output) (per output) (per output)
(per output)
Application for 5 No Error 5 Acted immediately after request

6
Leave
4 1-2 Minor Error 4 Acted on the following working day after request
3 3 Minor Errors 3 Acted on the 2nd working day after request
2 4 Minor Errors 2 Acted on the 3rd working day after request
1 5 Minor Errors 1 Acted after 3rd working day after request
MECHANISM Sample No.2 Payroll (Job Order)
1

1 INPU Personnel hired on Job Order


2
3
(JO) Contract submitted When done, she will fill

T supporting documents for ORS up the Output Rating


payroll dated June 15, 2014. Sheet accordingly.

4
2 OUTP
UT will prepare the payroll
SALMAN SALIK
PAYROLL (JO) Dela Cruz, J., et.al.
Salman 06/15/2023

5 after submission of documents.


06/16/2023
06/16/2023
She accomplished it the following day,
June 16, 2014.
6
MECHANISM Sample No.2 Payroll (Job Order)
1

4 RATI Clovy will submit the document to


2 the HRMO/immediate supervisor for
review and assessment with the ORS
NG
SALMAN SALIK
attached. PAYROLL (JO) Dela Cruz, J., et.al.
06/15/2023
06/16/2023
3 The HRMO/immediate supervisor will review the
correctness and completeness of the document
06/16/2023

submitted and rate it accordingly based on the


Performance Standards Guide.
OUTP
4 UT immediate supervisor
The HRMO/
will return the document (output) to
Clovy for correction.

5
X There are errors in encoding. Clovy will correct the error
as directed/advised.
One (1) Name misspelled
6 One (1) Entry miscalculated
MECHANISM Sample No.2 Payroll (Job Order)
1

2 RATI She will return the corrected


document to the HRMO/ immediate

NG supervisor for review and assessment. SALMAN SALIK


PAYROLL (JO) Dela Cruz, J., et.al.
06/15/2023
06/16/2023
3 The HRMO will review the correctness and 06/16/2023
completeness of the document submitted 1 3 4
and rate it accordingly based on the
4 Performance Standards Guide. 06/16/2023
06/16/2023

5 EXPECTED RATING
QUALITY
STANDARD
RATING TIME STANDARD
OUTPUT (per output) (per output) (per output)
(per output)
Payroll 5 No Error 5 Prepared within the day after submission of all supporting doc.

6
4 1 Error 4 Prepared 1-2 working days after submission of all supporting doc.
3 2 Errors 3 Prepared 3-5 working days after submission of all supporting doc.
2 3 Errors 2 Prepared 6-8 working days after submission of all supporting doc.
1 More than 3 Errors 1 Prepared 9 working days after submission of all supporting doc.
MECHANISM Sample Output No.3 Issuance of
1 Certified Copy of Registered Document

1 INPU A client request for Issuance of


2
3
Certified Copy Of Registered When done, she will fill

T Documents at 9:00 am. ORS up the Output Rating


Sheet accordingly.

4
2
The Administrative Aide will:
OUTP Verify the requested document to Name of Ratee
UT the computer (CRIS) or the
Registry Books.
CERTIFIED COPY
9:00 am

5 Generate copy from the computer


9:30 am
9:31 am
or photocopy from the original
document.

6 Check the veracity of the data


contained in the document.
Accomplished it at 9:30 am.
MECHANISM Sample Output No.3 Issuance of
1 Certified Copy of Registered Document

4 RATI She will submit the document to the


2 MCR/ immediate supervisor for
review and assessment with the ORS
NG attached. Name of Ratee
CERTIFIED COPY

3 The MCR, before signing, will review 9:00 am


9:30 am
the correctness and completeness of 9:31 am
the document submitted and rate it
accordingly based on the 1 5 4

4 Performance Standards Guide.


06/16/2014
06/16/2014

5 EXPECTED RATING
QUALITY
STANDARD
RATING TIME STANDARD
OUTPUT (per output) (per output) (per output)
(per output)
Certified Copies 5 No Error 5 Prepared certified document within 25 minutes after receipt

6 4
3
4
3
Prepared certified document within 30 minutes after receipt
Prepared certified document within 35 minutes after receipt
2 1 Minor Error 2 Prepared certified document within 40 minutes after receipt
1 1 Prepared certified document within 45 minutes and beyond
MECHANISM
1
After Rating, the rater will return the ORS to the ratee.
2 DESCRIP
TION
The Output Rating Sheet (ORS),
3 will be kept and consolidated weekly or at
GAAM LAO
ALLAF NEEG
R
RIINNAAIO F
E NE S
G
G AF A
O
O
M
M
RA
RA O
AO
L
LEOEAAVVEE
VE/1E 5/2001144
the end of the month for the
L IC
IN A
A T F N S
G A F M R
A O L E A
0V 6
APPPR PLRIICN AA TFIO
F
IOE
E
N G S A F
ORMO R
AO OLEAAE A0
V 6 E0551/2/2
/1
4014144 accomplishment of the Monthly
4
APPRLIIC N A T
FIOE N GS A
F FM
O M A L V0 76
E /1
/2 5 /2040
APPRLIIC N A T
I OE
F NG
TIO N GS A O R
A OL 0E 6
AV 0
V/1 6
E
7/2/1
/2 5 0/21 14 7/2014
AAPPRPL NAA
IIC
RILIC SFAFOM R OLE0EA 6/1/17
0 6E /150/2100461/1
477/2/2001144
APPPR NA T F
FEE
TIO NS SAF
G AM
ENGFORRLLE
OM R
A AO LE 0 A6/10
V
066E
6
7E
/1
/1
/2 5 0
/2 1
/21406
0
4 4614/1
1 Performance Output Report (MPOR)
AAPPRLIC
IC
LIN
IIC
NATF IO
IONNSSFO
06A6 V
06/1 /15/20
7/2 501 4/1
6/1 7/2/2001144
A TIO OR L0E06A 0 V
/1 7E
/1 0 /2 4016414
1401 /17 7/2 14
APPPPLLIC A T
ATION S F 6
060/1 /16 7/1
067/1/2501/25/2 /2
1 066/17/20010144
/1
A
P P LIC 0 7 /2 0 0 4 /2
A 066/1/17/201140646/1/177/20144
006/17/20006/1 /17/20114
5 06 7/20

Practically, it would be difficult to monitor


and verify daily/weekly outputs without
6 utilizing the ORS.
MECHANISM How to Consolidate?
1
Sample Output: Service Record Formula: Quantity x Rating
2 Formula:
Effectiveness: 2 xQuantity
5 = 10 x Rating
Timeliness: 3 x 5 = 15
1 Week
st 1x3=3

(Qty.- EFFECTIV (Qty.- TIMELINE


QUANTITY
3 Rating) ENESS Rating) SS
(2-5) 10
MONDAY 3 (1-3) 3 (3-5) 15

4 TUESDAY 5 (3-5)
(2-3)
15
6
(2-5)
(2-3)
10
6
(1-4) 4
WEDNESDAY 2 (2-5) 10 (2-4) 8
5 THURSDAY - - - - -
FRIDAY 1 (1-5) 5 (1-4) 4

6 Total Service Records


Accomplished in Week 1 11 49 47
No need to get the average yet.
MECHANISM How to Consolidate?
1
Sample Output: Service Record It would be easier to accomplish the
2 Formula: Quantityratings
x Rating
2nd Week MPOR if you consolidate weekly

(Qty.- EFFECTIV (Qty.- TIMELINE


QUANTITY
3 Rating) ENESS Rating) SS
(2-5) 10
(3-4) 12
MONDAY 5 (1-4) 4 (2-5) 10
(2-3) 6
4 (5-5) 25
TUESDAY 12 (4-3) 12 (11-5) 55
(1-4) 4
(3-4) 12

5 WEDNESDAY 2 (1-5)
(1-4)
5
4
(2-5) 10

THURSDAY 6 (4-5) 20 (3-5) 15


6 (2-4) 8 (3-3) 9
FRIDAY 1 (1-3) 3 (1-2) 2
Total Service Records
Accomplished in Week 2 26 109 117
• Monthly Performance Output Report
1
Republic of the Philippines
Province of Davao del Sur
MUNICIPALITY OF SANTA CRUZ
DESCRIPT
2 MONTHLY PERFORMANCE OUTPUT REPORT
ION
Name : _________________________ Office/Division: ___________________________ Month: _____________________
• Consolidation
QUANTITY EFFECTIVENESS TIMELINESS of daily/weekly
EXPECTED OUTPUT WEEK WEEK WEEK
outputs
3
TOTAL TOTAL TOTAL
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
STRATEGIC PRIORITIES
1                                     
2                                     
3                                     
CORE FUNCTIONS

The MPOR
4
1                                   
2                                     


 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  may serve as
5                                     
SUPPORT FUNCTIONS

the Monthly
                                 
Accomplishment
5
2                                     
3                                     


 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Report
                                       
                  WEEK 1 WEEK 2 WEEK 3 WEEK 4 TOTAL
MAN DAY(S) LOST THRU ABSENCE                                    

6
MAN HRS./MINUTES LOST THRU TARDINESS/UNDERTIME                            
                                   
OBSERVATION/REMARKS
 
  CONFIRMED:       Above entries are true & correct:                
     
                     
Rater       Ratee                
MECHANISM How to Consolidate?
1
Sample Output: Service Record Fill up the MPOR accordingly with the
2 output ratings gathered per week
EFFECTIV TIMELINE
QUANTITY
ENESS SS
3 Week 1 11 49 47
Week 2 26 109 117

4
Week 3 40 176 174
Week 4 26 119 114
Week 5 19 84 88
QUANTITY EFFECTIVENESS TIMELINESS

5 EXPECTED OUTPUT
1
WEEK
2 3 4 5 TOTAL 1
WEEK
2 3 4 5 TOTAL 1
WEEK
2 3 4 5 TOTAL
CORE FUNCTIONS    
1 Service Record  11 26  40 26 19 49 109 176 119 84 47 117 174 114 88

6 2 Leave Application
SUPPORT FUNCTIONS
1 Payroll
2 Minutes of Meeting
MECHANISM How to Consolidate?
1
Sample Output: Service Record Get the Total of all performance
2 measurement at the end of the month

QUANTITY EFFECTIVENESS TIMELINESS

3 EXPECTED OUTPUT
1
WEEK
2 3 4 5 TOTAL 1
WEEK
2 3 4 5 TOTAL 1
WEEK
2 3 4 5 TOTAL
CORE FUNCTIONS    
1 Service Record  11 26  40 26 19 122 49 109 176 119 84 537 47 117 174 114 88 540

4 2 Leave Application
SUPPORT FUNCTIONS
1 Payroll
2 Minutes of Meeting

5
COMPUTATION
Again, it would be easier to
Quantity 11 + 26 + 40 + 26 + 19 = 122 accomplish the MPOR if you
6 Effectiveness 49 + 109 + 176 + 119 + 84 = 537 consolidate ratings weekly
47 + 117 + 174 + 114 + 88 = 540
Timeliness
• Summary of Accomplishments
1
Republic of the Philippines
Province of Davao del Sur

2 MUNICIPALITY OF SANTA CRUZ

DESCRIPT SUMMARY OF ACCOMPLISHMENT

• ION
Consolidation
3
_________________________________

of all monthly Period

ratings Ratee's Name: ________________________________


Ratee's Position: ______________________________
Ratee's Work Station: __________________________

The ACCOMPLISHMENT

4 Summary
EXPECTED OUTPUT

STRATEGIC PRIORITIES 
QUALITY EFFECTIVENESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
TIMELINESS

consolidates 1                                                 
2                                                 
all the ratings 3                                                 

5
CORE FUNCTIONS
at the end of 1                                                 
the semester 2 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4                                                 
5                                                 
SUPPORT FUNCTIONS 

6
1                                                 
2                                                 
3                                                 
4                                                 
5                                                 
                                                   
MECHANISM How to Consolidate?
1
Sample Output: Service Record Get the Total of all performance
2 measurement at the end of the semester
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS

3 CORE FUNCTIONS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06
2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87

4 SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

COMPUTATION
5
Quantity 122+ 120 + 135 + 90 + 50 + 180 = 697
Effectiveness 537+ 480 + 325 + 421 + 220 + 750 = 2733
6 Timeliness 540 + 555 + 290 + 410 + 185 + 850 = 2830
MECHANISM How to Consolidate?
1
Sample Output: Service Record Get the Average of each performance
2 measures base on each total ratings
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS

3 CORE FUNCTIONS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06
2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87

4 SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

6
MECHANISM How to Consolidate?
1
Sample Output: Service Record FORMULA: For Quantity
2 Accomplishment/Target x 100%
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS

3 CORE FUNCTIONS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06
2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87

4 SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

COMPUTATION Service Record Ratin Percentage of Actual


5 Target: 1068 g Accomplishment
Accomplishment: 697 5 130 percent or more than the set target
4 115 to 129 percent more than the set
6 697/1068 = 0.65 x 100% = 65% target
However, if the Target Quantity is Fixed, 3 Equal to the set target or 101 to 114
its rating shall be an automatic 5. percent more than the set target
MECHANISM How to Consolidate?
1
Sample Output: Service Record FORMULA: For Effectiveness/Timeliness
2 Total Rating/Total Quantity
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS

3 CORE FUNCTIONS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06
2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87

4 SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

COMPUTATION Service Record Average Rating Equivalent Numerical Rating


5 Total Quantity: 697 (From Summary (To be reflected on the IPCR’s Actual
Total Effectiveness: 2733 MPOR) Accomplishment)
Total Timeliness: 2830 5.00 5
6 Effectiveness: 2733/697 = 3.92 4.00 - 4.99 4
Timeliness: 2830/697 = 4.06 3.00 - 3.99 3
2.00 - 2.99 2
MECHANISM How to Consolidate?
1
Sample Output: Service Record FORMULA: For Effectiveness/Timeliness
2 Total Rating/Total Quantity
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS

3 CORE FUNCTIONS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06
2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87

4 SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

COMPUTATION Service Record Average Rating Equivalent Numerical Rating


5 Total Quantity: 697 (From Summary (To be reflected on the IPCR’s Actual
Total Effectiveness: 2733 MPOR) Accomplishment)
Total Timeliness: 2830 5.00 5
6 Effectiveness: 2733/697 = 3.92 4.00 - 4.99 4
Timeliness: 2830/697 = 4.06 3.00 - 3.99 3
2.00 - 2.99 2
• Individual Performance Commitment & Review
1
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)

2
I, _________________________________________________ of the ______________________, Division of _____________________ commit to deliver and agree to be rated on the attainment of the
following targets in accordance with the indicated measures for the period _______________ to ________________ 20_____.

     

DESCRIPT Ratee
Date    

• ION
Individual Reviewed by: Date: Approved by: Date:          

3
                 
Rating for the  
Immediate Supervisor
 
 
 
Head of Office
 
         
 
 
given semester Success Indicators
Output  Actual Accomplishments Rating Remarks
as targeted (Targets + Measures)
Q (1) E (2) T (3) A (4)  
       
STRATEGIC PRIORITY NO:                

4
Output No. 1:                
The IPCR Output No. 2:
 
 
 
   
Total  
 
 
 
 
 
 
 
 
 
 
shall be CORE FUNCTIONS:
Output No. 1:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
accomplished Output No. 2:
 
 
 
   
Total  
 
 
 
 
 
 
 
 
 
 
using the SUPPORT FUNCTIONS:                

5 Summary as
Output No. 1:
Output No. 2:
 
 
 
 
 
 
 
 
Total  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
reference.     Final Average Rating            
Comments and Recommendations for Development Purposes              

Discussed with Date Assessed by         Date Final Rating by

6
    I certify that I discussed my assessment            
    of the performance with the employee.            
                 
Employee   Supervisor           Head of Office

LEGEND: 1 - Quantity 2 - Effectiveness 3 - Timeliness 4 - Average


MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT QUANTITY


ACCOMPLISHMENT
EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
CORE FUNCTIONS
1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error              
within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
           

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Get your Reviewed IPCR as agreed by you and your supervisor


during the target setting before the start of the semester.
MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT QUANTITY


ACCOMPLISHMENT
EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
CORE FUNCTIONS
1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error              
within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
           

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Core Function
Output: Service Record
Success Indicator: Prepared 1068 Service Record with no error within 20 minutes upon request.
MECHANISM How to Accomplish the IPCR?

1 EXPECTED EXPECTED RATING


OUTPUTOUTPUT(per output)
QUALITY STANDARD
QUANTITY
(per output)
ACCOMPLISHMENT
RATING
(per output) EFFECTIVENESS
TIME STANDARD
(per output)TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
Service Record
CORE FUNCTIONS 5 No Error 5 Prepared /issued immediately upon request
• Prepared/Issued
1  Service Record 4 122  120 135 90 50 180 697 2 537 4480 325 421
Prepared
220 750 /issued
2733 3.92within 15 290
540 555 minutes upon
410 185 850request
2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
3 3 Prepared /issued within 20 minutes upon request
SUPPORT FUNCTIONS
1  Payroll 2 20 With
13 21Error
10 15 7 86 5 100 2 65 105 50Prepared
63 27 /issued
410 4.76within
94 3065 minutes
105 49 upon
54 30request
397 4.61
2  Minutes of Meeting 1 1 7 2 0 0 2 12 5 5 1 35 10 0Prepared/issued
0 8 58 more
4.83 5 than
35 30
10 minutes
0 0 upon request
10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
           

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Actual Accomplishment
Prepared 697 Service Records with error within 20 minutes upon request
Based on the office’s Performance Standard Guide
MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT QUANTITY


ACCOMPLISHMENT
EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
CORE FUNCTIONS
1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
           

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Core Function
Output: Leave Application
Success Indicator: Prepared 300 Leave Applications with 3 errors on the 2nd working day after request.
MECHANISM How to Accomplish the IPCR?

1 EXPECTED EXPECTED RATING


OUTPUTOUTPUT(per output)
QUALITY STANDARD
QUANTITY
(per output)
ACCOMPLISHMENT
RATING
(per output) EFFECTIVENESS (per output)TIMELINESS
TIME STANDARD
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
LeaveCORE
Application
FUNCTIONS 5 No Error 5 Prepared immediately after request
1  Service Record 4 1-2 Minor
122  120 135 90Error
50 180 697 2 537 4480 325 421
Prepared
220 750on the 3.92
2733 following working
540 555 day185
290 410 after
850request
2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 nd 537 410 672 678 90 186 2573 4.87
3 3 Minor Errors 3 Prepared on the 2 working day after request
SUPPORT FUNCTIONS
1  Payroll 2 20 413Minor
21 Errors
10 15 7 86 5 100 2 65 105 Prepared
50 63 27 on
410the4.76
3rd 94
working day49after
65 105 54 request
30 397 4.61
2  Minutes of Meeting 1 1 57Minor
2 Errors
0 0 2 12 5 5 1 35 10 Prepared
0 0 8 after 3 working
58 4.83
rd 5 35 day
10 after
0 request
0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
Prepared 528 Leave Applications with 1-2  
errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Actual Accomplishment
Prepared 528 Leave Applications with 1-2 errors on the following working day.
Based on the office’s Performance Standard Guide
MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT QUANTITY


ACCOMPLISHMENT
EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
CORE FUNCTIONS
1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors  


on the 2nd working day after request.
Prepared 528 Leave Applications with 1-2  
errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working              

5 Minutes of Meeting
days after submission of all supporting documents
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Support Function
Output: Payroll
Success Indicator: Prepared 30 Payrolls with 2 errors 3-5 working days after submission of all supporting documents
MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT RATING


EXPECTED OUTPUT
(per output)
QUALITY STANDARD
QUANTITY
(per output) (per output)
RATING ACCOMPLISHMENT
EFFECTIVENESS
TIME STANDARD
(per output) TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
Payroll
CORE FUNCTIONS 5 No Error 5 Prepared within the day after submission of all supporting doc.
1  Service Record 4 1122Error
 120 135 90 50 180 697 2 4537 Prepared
480 325 1-2750
421 220 working
2733days
3.92 after
540 submission of all
555 290 410 185supporting
850 2830 doc.
4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
3 2 Errors 3530 Prepared 3-5 working days after submission of all supporting doc.
SUPPORT FUNCTIONS
1  Payroll 2 320Errors
13 21 10 15 7 86 5 2100 65 Prepared
105 50 636-8 working
27 410 days
4.76 after
94 submission
65 105 49of all
54supporting
30 397 doc.
4.61
2  Minutes of Meeting 1 More
1 7 than
2 3 Errors
0 0 2 12 5 15 35 Prepared
10 0 09 working
8 58 days after
4.83 5 submission
35 10 of 0 all0supporting
10 60 doc.5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

5 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc..
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Actual Accomplishment
Prepared 86 Payrolls with 1 error 1-2 working day after submission of all supporting doc.
Based on the office’s Performance Standard Guide
MECHANISM How to Accomplish the IPCR?

1 EXPECTED OUTPUT QUANTITY


ACCOMPLISHMENT
EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
CORE FUNCTIONS
1  Service Record 122  120 135 90 50 180 697 2 537 480 325 421 220 750 2733 3.92 540 555 290 410 185 850 2830 4.06

2 2  Leave Application 107 84 135 137 20 45 528 5 530 415 676 657 85 170 2527 4.78 537 410 672 678 90 186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll 20 13 21 10 15 7 86 5 100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 7 2 0 0 2 12 5 5 35 10 0 0 8 58 4.83 5 35 10 0 0 10 60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

5 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions  
5 days after the meeting.
           

    Total            
    Final Average Rating            

6 Support Function
Output: Minutes of Meeting
Success Indicator: Prepared 6 Minutes of Meeting with 2 revisions 5 days after the meeting.
MECHANISM How to Accomplish the IPCR?

1 EXPECTED EXPECTED RATING


OUTPUTOUTPUT(per output)
QUALITY STANDARD
QUANTITY
(per output)
ACCOMPLISHMENT
RATING
(per output) EFFECTIVENESS
TIME STANDARD
(per output)TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.
Minutes of FUNCTIONS
CORE Meeting 5 No Revision 5 Prepared 1-2 working days after the meeting
1  Service Record 4 1 Revision
122  120 135 90 50 180 697 2 537 4480 325 421
Prepared
220 750 3-4
2733working
3.92 540days
555 after the185
290 410 meeting
850 2830 4.06

2 2  Leave Application 3 107 84 135 137 20 45


2 Revisions 528 5 530 3415 676 657 85 170 2527 4.78 537 410 672 678 90
Prepared 5 working days after the meeting186 2573 4.87
SUPPORT FUNCTIONS
1  Payroll
2 20
3 Revisions 15 7 86
13 21 10 5
2 Prepared 6-7 working days after the meeting
100 65 105 50 63 27 410 4.76 94 65 105 49 54 30 397 4.61
2  Minutes of Meeting 1 1 More
7 2 than
0 3 Revisions
0 2 12 5 5 1 35 10 0Prepared
0 8 more than 75 working
58 4.83 35 10 days
0 after
0 10 the meeting
60 5

3
Success Indicators  
Output
(Targets + Measures) Actual Accomplishments Rating Remarks
      Q (1) E (2) T (3) A (4)    
CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

4 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

5 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1
5 days after the meeting. revision 1-2 working days after the meeting.
  5   4   5      

    Total            
    Final Average Rating            

6 Actual Accomplishment
Prepared 12 Minutes of Meeting with 1 revision 1-2 working days after the meeting.
Based on the office’s Performance Standard Guide
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING PERCENTAGE
If anDISTRIBUTION
Corresponding Percentages employee has outputs in all three categories
5 were assigned to arrive at the as reflected on the IPCR:
Final Rating in a given semester.
• Strategic Priorities - 45%
• Core Functions - 45%
6 • Support Functions - 10%
Total - 100%
 
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING PERCENTAGE
If anDISTRIBUTION
Corresponding Percentages employee has outputs only in two out of
5 were assigned to arrive at the three categories, as reflected on the IPCR:
Final Rating in a given semester.
• Strategic Priorities - 50%
• Core Functions - 50%
6 Total - 100%
 
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING PERCENTAGE
If anDISTRIBUTION
Corresponding Percentages employee has outputs only in two out of
5 were assigned to arrive at the three categories, as reflected on the IPCR:
Final Rating in a given semester.
• Strategic Priorities - 80%
• Support Functions - 20%
6 Total - 100% 
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING PERCENTAGE
If anDISTRIBUTION
Corresponding Percentages employee has outputs only in two out of
5 were assigned to arrive at the three categories, as reflected on the IPCR:
Final Rating in a given semester.
• Core Functions - 80%
• Support Functions - 20%
6 Total - 100% 
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4      
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4      

    Total            
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING PERCENTAGE
If anDISTRIBUTION
Corresponding Percentages employee has outputs only in one out of
5 were assigned to arrive at the three categories, as reflected on the IPCR:
Final Rating in a given semester.
• Strategic Priorities - 100%
• Core Functions - 100%
6 • Support Functions - 100% 
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4   3    
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4  4.33    

    Total        2.93    
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4      

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5      
5 days after the meeting. revision 1-2 working days after the meeting.
    Total            
    Final Average Rating            

4
OVERALL RATING Getting the Average Rating
Core Functions – 80% Core Functions:
5 Support Functions – 20% Service Record: 2 + 3 + 4 = 9/3 =3
(See Percentage Distribution) Leave Application: 5 + 4 + 4 = 13/3 = 4.33
---------
6 7.33/2 = 3.665 x 80%
= 2.93
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4   3    
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4  4.33    

    Total        2.93    
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4  4.33    

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5  4.67    
5 days after the meeting. revision 1-2 working days after the meeting.
    Total         .90    
    Final Average Rating            

4
OVERALL RATING Getting the Average Rating
Core Functions – 80% Support Functions:
5 Support Functions – 20% Payroll: 5 + 4 + 4 = 13/3 = 4.33
(See Percentage Distribution) Minutes: 5 + 4 + 5 = 14/3 = 4.67
---------
6 9/2 = 4.5 x 20%
= .90
MECHANISM How to Accomplish the IPCR?

1  
Output

 
Success Indicators
(Targets + Measures)
 
 
Actual Accomplishments Rating
Q (1) E (2) T (3) A (4)    
Remarks

CORE FUNCTIONS                
Service Record Prepared 1068 Service Record with no error   Prepared 697 Service Records with error   2   3   4   3    
within 20 minutes upon request. within 20 minutes upon request.

2 Leave Application Prepared 300 Leave Applications with 3 errors   Prepared 528 Leave Applications with 1-2  
on the 2nd working day after request. errors on the following working day.
5   4   4  4.33    

    Total        2.93    
SUPPORT FUNCTIONS:                
Payroll Prepared 30 Payrolls with 2 errors 3-5 working  Prepared 86 Payrolls with 1 error 1-2 working   5   4   4  4.33    

3 Minutes of Meeting
days after submission of all supporting documents day after submission of all supporting doc.
Prepared 6 Minutes of Meeting with 2 revisions   Prepared 12 Minutes of Meeting with 1   5   4   5  4.67    
5 days after the meeting. revision 1-2 working days after the meeting.
    Total         .90    
    Final Average Rating        3.83    

4
OVERALL RATING Final Average Rating Range Adjectival Rating
4.51-5.00 Outstanding (O)
Core Functions – 80% 2.93 + .90 3.51-4.50 Very Satisfactory (VS)
5 Support Functions – 20%
=3.83 2.51-3.50 Satisfactory (S)
(See Percentage Distribution) 1.51-2.50 Unsatisfactory (US)
1.00-1.50 Poor (P)

6
The employee attained a rating of Very Satisfactory
WORKSH
SP
1

2
O
OP
N
3

5
STRATEGIC PERFORMANCE MANAGEMENT SYSTEM

6
W WORKSHOP INSTRUCTION
O Assuming that it is the end of the semester and
R the rating period, perform the following tasks,
accordingly:
K • Accomplish the MPOR for the month of June using the
S rated ORS provided. (Please use your mobile phone calendars)
• Accomplish the Summary of Accomplishments using the
H MPOR provided including the accomplished MPOR for June.
• Accomplish the IPCR provided.
O • Find the Final Average and Adjectival Rating of the IPCR.

P We’ll Check and Process after accomplishing all the tasks.


W
O
R
K
S
H
O
P
1
W Republic of the Philippines

O
Province of the Davao del Sur
MUNICIPALITY OF SANTA CRUZ

MONTHLY PERFORMANCE OUTPUT REPORT


R Name: JUAN B. DELA CRUZ Office/Division: MMO Month: JUNE 2014

K EXPECTED OUTPUT
QUANTITY
WEEK
EFFECTIVENESS
WEEK
TIMELINESS
WEEK

S CORE FUNCTIONS
1 Plans, Programs and Project Proposal
1

1
2 3 4 5 TOTAL

1
 
1

4
2 3 4 5 TOTAL

4
 
1

4
2 3 4 5 TOTAL

H CORE FUNCTIONS
1 Abstract of Bids
2 Minutes of Meeting
1 1
1
2
1
3 4
5
7
5
3 3
5
6
5

O
SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR) 1 1 5 5 5 5
2 Acknowledgment Letter 5 2 1 1 9 25 8 4 4 41 20 8 4 4 36

P
3 Communications (Reply) 1 1 3 3 5 5
W QUANTITY EFFECTIVENESS TIMELINESS

O
EXPECTED OUTPUT WEEK WEEK WEEK
1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL
CORE FUNCTIONS    
1 Plans, Programs and Project Proposal 1 4 4

R CORE FUNCTIONS
1 Abstract of Bids
2 Minutes of Meeting
1 1
1
3 4
5
3 3
5

K SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR)
2 Acknowledgment Letter
1
5 2 1 1
5
25 8 4 4
5
20 8 4 4

S
3 Communications (Reply) 1 3 5

H
O
P
W
QUANTITY EFFECTIVENESS TIMELINESS
EXPECTED OUTPUT WEEK WEEK WEEK
1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL

O
CORE FUNCTIONS    
1 Plans, Programs and Project Proposal 1 4 4
CORE FUNCTIONS
1 Abstract of Bids 1 1 3 4 3 3

R 2 Minutes of Meeting
SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR) 1
1

5
5

5
5

K 2 Acknowledgment Letter
3 Communications (Reply)
5
1
2 1 1 25
3
8 4 4 20
5
8 4 4

S
H PRO
B . DEL
JUAN POSAL
JECT P
RO
A CRU
Z
JUAN
ABSTRA
B . DEL
CT OF B
IDS
A CRU
Z

14
06/10/20 /10/2014
JUAN
ABSTRA
B . DEL
CT OF B
IDS
A CRU
Z

14
06/26/20 /26/2014

O
4
06/4/201 /4/2014 06 06
06 3 3
4 3 4
4 1 1
1

P
W
QUANTITY EFFECTIVENESS TIMELINESS
EXPECTED OUTPUT WEEK WEEK WEEK
1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL

O
CORE FUNCTIONS    
1 Plans, Programs and Project Proposal 1 4 4
CORE FUNCTIONS
1 Abstract of Bids 1 1 3 4 3 3

R 2 Minutes of Meeting
SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR) 1
1

5
5

5
5

K 2 Acknowledgment Letter
3 Communications (Reply)
5
1
2 1 1 25
3
8 4 4 20
5
8 4 4

S
H JUAN
MINUTE
B . DEL
S OF M
EE T
A CRU
ING
Z
JUAN
ACCOM
B . DEL
PLISHE
A CRU
D DTR
4
Z

06/4/201 /4/2014
JUAN
COMMU
NICATIO
N (R
A CRU
B . DEL PLY)
E
4
Z

06/26/201 /26/2014

O
14
06/30/20 /30/2014 06 06
06 5 5
5 5 3
5 1 1
1

P
W
QUANTITY EFFECTIVENESS TIMELINESS
EXPECTED OUTPUT WEEK WEEK WEEK
1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL

O
CORE FUNCTIONS    
1 Plans, Programs and Project Proposal 1 4 4
CORE FUNCTIONS
1 Abstract of Bids 1 1 3 4 3 3

R 2 Minutes of Meeting
SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR) 1
1

5
5

5
5

K 2 Acknowledgment Letter
3 Communications (Reply)
5
1
2 1 1 25
3
8 4 4 20
5
8 4 4

S
H JUAN
ACKNO
WLEDG
ME NT
A CRU
B . DEL LETTER
Z
JUAN
ACKNO
WLEDG
MENT
A CRU

14
Z
B . DEL LETTER

06/17/20 /17/2014
JUAN
ACKNO
WLEDG
MENT
A CRU
Z
B . DEL LETTER

14
06/26/20 /26/2014
JUAN
ACKNO
WLEDG
MENT
A CRU
Z
B . DEL LETTER

14
06/30/20 /30/2014

O
4
06/9/201 /9/2014 06 06 06
06 4 4 4
4 4 4 4
5 2 1 1
5

P
W
QUANTITY EFFECTIVENESS TIMELINESS
EXPECTED OUTPUT WEEK WEEK WEEK
1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL 1 2 3 4 5 TOTAL

O
CORE FUNCTIONS    
1 Plans, Programs and Project Proposal 1 1 4 4 4 4
CORE FUNCTIONS
1 Abstract of Bids 1 1 2 3 4 7 3 3 6

R 2 Minutes of Meeting
SUPPORT FUNCTIONS
1 Accomplished Daily Time Record (DTR) 1
1 1

1 5
5 5

5 5
5 5

K 2 Acknowledgment Letter
3 Communications (Reply)
5
1
2 1 1 9
1
25
3
8 4 4 41
3
20
5
8 4 4 36
5

S
H
RU Z
. DE LA C RU Z
JUA NB ELsACC UZ

GET THE TOTAL of all


B . Did R
JU A N
trAacNctBtoB.o. fDB L A
E s CRUZ
AbJstrU Eid
fDBid LA RUZ
s CR
AbbsJUstrU AaN t . fB
o DBELsA 6/2Z0414
aN c B
. fDid id
E s 0606
A C /2 U 0106/26/2014
A sJ
Ab JUtr AaN
ActBo f B
L
C /2
R 6U/2Z
2Z014 6/20414
b s tra c tB o
f . BD E
id L
s A 06
C /2
R 6/
U 14 06/2/2 01
AbsJtrU
aA c NtBo . D L A
E s06 014 /26/
/2 6/ 2 0 06/ 26 14
2 0

O
A JUA t of Bid06/26/214 /2014
N 06
Abstract of Bids06/26/6/20214
0 06/26 4
Abstrac
performance measurement
1
06/26/20
06/2/2014 /26/2014
6 06/2 06 14
06/26/20

P using simple addition


W Republic of the Philippines

O Province of Davao del Sur


MUNICIPALITY OF SANTA CRUZ

R
SUMMARY OF ACCOMPLISHMENT
JANUARY-JUNE 2014
Period
Ratee’s Name: JUAN B. DELA CRUZ

K Ratee’s Position: Administrative Assistant


Ratee’s Work Station: MMO

S
ACCOMPLISHMENT
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

CORE FUNCTIONS

H 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

O 2 Minutes of Meeting
SUPPORT FUNCTIONS
1 Accomplished DTR
1

1
1

1
1

1
1

1
1

1
1

1
6

6
3

5
4

5
4

5
4

5
5

5
5

5
5

5
27

30
4.5

5
4

5
3

5
4

3
5

1
5

5
5

5
26 4.33

24 4

P
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69
W ACCOMPLISHMENT

O
EXPECTED OUTPUT QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

CORE FUNCTIONS

R
1  Plans, Prog. and Proj. Proposal 1 1 1 3 5 4 4 4 12 4 3 4 4 11 3.67
CORE FUNCTIONS
1 Abstract of Bids 4 1 3 2 2 12 4 17 5 14 10 7 53 4.42 15 4 13 9 6 47 3.92

K
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4
2 FORMULA:Letter
Acknowledgment For Quantity
22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3

S Accomplishment/Target x 100%
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13

Ratin
9 3 55 4.23 13 8 10

Percentage of Actual
15 10 5 61 4.69

H COMPUTATION Plans, Prog. & Proj. Proposals


Target: 1
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 3
4
target
115 to 129 percent more than the set
3/1 = 3 x 100% = 300%
P
target
3 Equal to the set target or 101 to 114
percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Quantity


S Accomplishment/Target x 100%
Ratin Percentage of Actual
H COMPUTATION Abstract of Bids
Target: 10
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 12
4
target
115 to 129 percent more than the set
12/10 = 1.2 x 100% = 120%
P
target
3 Equal to the set target or 101 to 114
percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Quantity


S Accomplishment/Target x 100%
Ratin Percentage of Actual
H COMPUTATION Minutes of Meeting
Target: 6
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 6
4
target
115 to 129 percent more than the set
6/6 = 1 x 100% = 100%
P
target
3 Equal to the set target or 101 to 114
percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Quantity


S Accomplishment/Target x 100%
Ratin Percentage of Actual
H COMPUTATION Accomplished DTR
Target: 6
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 6
4
target
115 to 129 percent more than the set
6/6 = 1 x 100% = 100%
P
target
If the Target Quantity is Fixed, its rating 3 Equal to the set target or 101 to 114
shall be an automatic 5. percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Quantity


S Accomplishment/Target x 100%
Ratin Percentage of Actual
H COMPUTATION Accomplished DTR
Target: 50
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 98
4
target
115 to 129 percent more than the set
98/50 = 1.96 x 100% = 196%
P
target
3 Equal to the set target or 101 to 114
percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Quantity


S Accomplishment/Target x 100%
Ratin Percentage of Actual
H COMPUTATION Accomplished DTR
Target: 10
g
5
Accomplishment
130 percent or more than the set

O Accomplishment: 13
4
target
115 to 129 percent more than the set
13/10 = 1.3 x 100% = 130%
P
target
3 Equal to the set target or 101 to 114
percent more than the set target
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Plans, Prog. & Proj. Poposal
Total Quantity: 3
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 12
Total Timeliness: 11 5.00 5
4.00 - 4.99 4
P Effectiveness: 12/3 = 4
Timeliness: 11/3 = 3.67
3.00 - 3.99
2.00 - 2.99
3
2
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Abstract of Bids
Total Quantity: 12
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 53
Total Timeliness: 47 5.00 5
4.00 - 4.99 4
P Effectiveness: 53/12 = 4.42
Timeliness: 47/12 = 3.92
3.00 - 3.99
2.00 - 2.99
3
2
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Minutes of Meeting
Total Quantity: 6
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 27
Total Timeliness: 26 5.00 5
4.00 - 4.99 4
P Effectiveness: 27/6 = 4.5
Timeliness: 26/6 = 4.33
3.00 - 3.99
2.00 - 2.99
3
2
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Accomplished DTR
Total Quantity: 6
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 30
Total Timeliness: 24 5.00 5
4.00 - 4.99 4
P Effectiveness: 30/6 = 5
Timeliness: 24/6 = 4
3.00 - 3.99
2.00 - 2.99
3
2
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Acknowledgment Letter
Total Quantity: 98
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 434
Total Timeliness: 421 5.00 5
4.00 - 4.99 4
P Effectiveness: 434/98 = 4.43
Timeliness: 421/98 = 4.30
3.00 - 3.99
2.00 - 2.99
3
2
ACCOMPLISHMENT

W EXPECTED OUTPUT

CORE FUNCTIONS
QUANTITY EFFECTIVENESS TIMELINESS
JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE. JAN FEB MAR APR MAY JUN TOTAL AVE.

O 1  Plans, Prog. and Proj. Proposal


CORE FUNCTIONS
1 Abstract of Bids
1

4 1
1

3 2
1

2
3

12
5

4
4

17 5
4

14 10
4

7
12 4

53 4.42 15
3

4
4

13 9
4

6
11 3.67

47 3.92

R
2 Minutes of Meeting 1 1 1 1 1 1 6 3 4 4 4 5 5 5 27 4.5 4 3 4 5 5 5 26 4.33
SUPPORT FUNCTIONS
1 Accomplished DTR 1 1 1 1 1 1 6 5 5 5 5 5 5 5 30 5 5 5 3 1 5 5 24 4

K
2 Acknowledgment Letter 22 18 5 22 22 9 98 5 102 83 23 93 92 41 434 4.43 103 85 25 84 88 36 421 4.3
3 Communications (Reply) 3 2 2 3 2 1 13 5 13 7 10 13 9 3 55 4.23 13 8 10 15 10 5 61 4.69

FORMULA: For Effectiveness/Timeliness Average Equivalent Numerical


S Total Rating/Total Quantity Rating Rating
(From (To be reflected on the
H COMPUTATION Accomplished DTR
Total Quantity: 13
Summary
MPOR)
IPCR’s Actual
Accomplishment)

O
Total Effectiveness: 55
Total Timeliness: 61 5.00 5
4.00 - 4.99 4
P Effectiveness: 55/13 = 4.23
Timeliness: 61/13 = 4.69
3.00 - 3.99
2.00 - 2.99
3
2
Ratee: JUAN B. DELA CRUZ

W
Date:
Reviewed by: Date: Approved by: Date:
PEDRO I. SANTIAGO

O
Head of Office
Success Indicators
Output Actual Accomplishments Rating
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  

R STRATEGIC PRIORITIES
1. Plans, Prog. and Proj. Proposal
 
 
 
Submitted 1 Proposal with 2 revisions 5
working days after approval of the budget.
 
 
Submitted 3 Proposals with 1 revision 3-4
working days after approval of the budget.
 

Total  
5
 
 
4
 
 
 
3
 
 
 
4
 
1.80
 
 

K CORE FUNCTIONS:
1. Abstract of Bids
 
 
 
Prepared 10 Abstract of Bids with no error 4-5
working days after Opening of Canvass.
 
 
Prepared 12 Abstract of Bids with no error
4-5 working days after Opening of Canvass.
 
4
 

 
 
 
4
 
 
 
3
 
 
 
3.67
 
 

S 2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67
  days after the meeting. working days after the meeting.        
             
    Total       1.65

H
SUPPORT FUNCTIONS:            
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67
  days after the end of the month. days after the end of the month.        
             

O
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33
  working days after instruction. working days after instruction.        
             
3. Communications (Reply) Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5 4 4 4.33

P
  1-14 working days after instruction. 6-10 working days after instruction.        
    Total       0.44
    Final Average Rating       3.89  
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.        
    Total       1.80
CORE FUNCTIONS:            
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67

R
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.        
             
2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67
  days after the meeting. working days after the meeting.        

K
             
    Total       1.65
SUPPORT FUNCTIONS:            
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67

S
  days after the end of the month. days after the end of the month.        
             
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33
  working days after instruction. working days after instruction.        

H
             
3. Communications (Reply) Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5 4 4 4.33
  1-14 working days after instruction. 6-10 working days after instruction.        
    Total       0.44
    Final Average Rating       3.89  

O OVERALL RATING
Strategic Priorities – 45%
Strategic Priorities:
P Core Functions – 45% Plans, Program & Project Proposal: 4 x 45%
Support Functions – 10% 5 + 4 + 3 = 12/3 = 4 = 1.80
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:            
1. Abstract of Bids Prepared 10 QUALITY
Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67

R
EXPECTED OUTPUT RATING RATING TIME STANDARD
  working
(per STANDARD
output) days after Opening of Canvass. (per output)
4-5 working days after Opening of Canvass.
(per output)        
(per output)
             
2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67

K
  Plans, Programs and 5 after the
days Nomeeting.
Revisions 5 working
Submitted
days after1-2
the working
meeting. days after approval   of  the budget
   
  Project Proposal   4 With 1 Revision 4   Submitted 3-4 working days after approval of the budget 
     
   
3 With 2 Revisions 3 Submitted 5 working days after Total approval    
of the  
budget 1.65
SUPPORT FUNCTIONS:            

S
1. Accomplished DTR 2
Submitted With
6 DTR3with
Revisions
no revision 6 working 2 Submitted
Submitted 10 working
6 DTR with days
no revision 4-5after approval
working 5
of5the budget
4 4.67
  1 after the
days More
endthan 3 month.
of the Revisions 1 days after
Submitted
the end15of or
themore working days after  approval
month.   of  the budget
 
             
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33

H  
 
3. Communications (Reply)
working days after instruction.
 
working days after instruction.
 
Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5
 
 
 
 
4
 
 
4
 
 
4.33

O
  1-14 working days after instruction. 6-10 working days after instruction.        
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Plans, Program and Project Proposal
Submitted 3 Proposals with 1 revision 3-4 working days after approval of the budget.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:              
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
               
2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67  
  days after the meeting. working days after the meeting.          

K
               
    Total       1.65
SUPPORT FUNCTIONS:              
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  

S
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  
  working days after instruction. working days after instruction.          

H
               
3. Communications (Reply) Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5 4 4 4.33  
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
    Final Average Rating       3.89  

O OVERALL RATING
Strategic Priorities – 45%
Core Functions: 3.67 + 3.67 = 7.34
P Core Functions – 45%
Support Functions – 10%
Abstract: 4 + 4 + 3 = 11/3 = 3.67
Minutes: 3 + 4 + 4 = 11/3 = 3.67
7.34/2 = 3.67 x 45%
= 1.65
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:              
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R  
 
2. Minutes of Meeting
working days after Opening of Canvass.
 
4-5 working days after Opening of Canvass.
 
Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3
 
 
 
 
4
 
 
4
 
 
3.67
 
 
 

K
  days after the meeting. working days after the meeting.          
               
    QUALITY Total       1.65
EXPECTED
SUPPORT OUTPUT
FUNCTIONS:
RATING
 
RATING  
TIME STANDARD          
STANDARD

S
(per output) (per output) (per output)
1. Accomplished DTR Submitted 6 DTR with (per no revision 6 working
output) Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  
  Abstract of Bids days
5 after the
Noend of the month.
Error 5 days after the end
Prepared of the month.
immediately after Opening of  Canvass        
               
4 With Error 4 Prepared 1-3 working days after Opening of Canvass
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  

H   3
working days after instruction. 3 workingPrepared 4-5
days after working days after Opening
instruction.   of  Canvass
     
    2 2   Prepared 6-7 working days after Opening   of  Canvass
     
3. Communications (Reply) Prepared
1 10 Communications with 2 revisions
1 Prepared 13 Communications with 1 revision 5 4
Prepared more than 7 working days after Opening of Canvass 4 4.33  

O
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Abstract of Bids
Prepared 12 Abstract of Bids with no error 4-5 working days after Opening of Canvass.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:              
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R  
 
2. Minutes of Meeting
working days after Opening of Canvass.
 
4-5 working days after Opening of Canvass.
 
Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3
 
 
 
 
4
 
 
4
 
 
3.67
 
 
 

K
  days after the meeting. working days after the meeting.          
               
    QUALITY Total       1.65
EXPECTED
SUPPORT OUTPUT
FUNCTIONS:
RATING
 
RATING  
TIME STANDARD          
STANDARD

S
(per output) (per output) (per output)
1. Accomplished DTR Submitted 6 DTR with (per no revision 6 working
output) Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  
  Minutes of Meeting days
5 after the
Noend of the month.
Revision 5 days after the end
Prepared 1-2of working
the month.days after the meeting         
               
4 1 Revision 4 Prepared 3-4 working days after the meeting
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  

H   3
working 2 Revisions
days after instruction. 3 workingPrepared 5 working
days after days after the meeting
instruction.          
    2 3 Revisions 2   Prepared 6-7 working days after the meeting          
3. Communications (Reply) Prepared
1 10 Communications
More than 3 Revisions with 2 revisions
1 Prepared 13 Communications with 1 revision 5
Prepared more than 7 working days after the meeting 4 4 4.33  

O
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Minutes of Meeting
Prepared 6 Minutes with 1 revision 3-4 working days after the meeting.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:              
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
               
2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67  
  days after the meeting. working days after the meeting.          

K
               
    Total       1.65
SUPPORT FUNCTIONS:              
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  

S
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  
  working days after instruction. working days after instruction.          

H
               
3. Communications (Reply) Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5 4 4 4.33  
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
    Final Average Rating       3.89  

O OVERALL RATING
Strategic Priorities – 45%
Support Functions: 4.67 + 4.33 + 4.33 = 13.89
Accomplished DTR: 5 + 5 + 4 = 14/3 = 4.67
P Core Functions – 45%
Support Functions – 10%
Acknowledgment Letter: 5 + 4 + 4 = 13/3 = 4.33
Communication (Reply): 5 + 4 + 4 = 13/3 = 4.33
13.33/3 = 4.44 x 10%
= 0.44
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
QUALITY
STRATEGIC PRIORITIES
EXPECTED OUTPUT RATING
  RATING   TIME STANDARD          
STANDARD
1. Plans, Prog. and Proj. Proposal(perSubmitted
output) 1 Proposal with 2 revisions 5 (per output)
Submitted 3 Proposals with 1 (per
revision 3-4output) 5 4 3 4  

O
(per output)
  working days after approval of the budget. working days after approval of the budget.          
  Accomplished Daily   5 No Revision 5 Submitted 2-3 working days after the end
Total   of  the month
  1.80
CORE
TimeFUNCTIONS:
Record (DTR)   4 With Revision 4   Submitted 4-5 working days after the end   of  the month
     
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
3 3 Submitted 6 working days after the end of the month
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
   
2 2   Submitted 7 working days after end of  the month        
2. Minutes of Meeting 1
Prepared 6 Minutes with 2 revisions 5 working 1 PreparedSubmitted more
6 Minutes withthan 7 working
1 revision 3-4 days after 3 the4 end 4 of the3.67
month 

K
  days after the meeting. working days after the meeting.          
               
    Total       1.65
SUPPORT FUNCTIONS:              

S
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  

H  
 
3. Communications (Reply)
working days after instruction.
 
working days after instruction.
 
Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5
 
 
 
 
4
 
 
4
 
 
4.33
 
 
 

O
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Accomplished Daily Time Record (DTR)
Submitted 6 DTR with no revision 4-5 working days after the end of the month.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
QUALITY
STRATEGIC PRIORITIES
EXPECTED OUTPUT RATING
  RATING   TIME STANDARD          
(per output) STANDARD (per output) (per output)
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
(per output)
  working days after approval of the budget. working days after approval of the budget.          
  Endorsement Letter   5 No Error 5 Within 1 working day after instruction
Total       1.80
CORE FUNCTIONS:
Transmittal Letter   4 1 Error 4   Within 2 working days after instruction          
1.Acknowledgment
Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
Letter 3 2 Errors 3 Within 3 working days after instruction
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
Request Letter 2 3-5 Errors 2   Within 4 working days after instruction  
           
2. Minutes of Meeting 1
Prepared 6 6Minutes
or more Errors
with 2 revisions 5 working1 PreparedWithin 5 or more
6 Minutes with 1working
revision days
3-4 after instruction
3 4 4 3.67  

K
  days after the meeting. working days after the meeting.          
               
    Total       1.65
SUPPORT FUNCTIONS:              

S
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  

H  
 
3. Communications (Reply)
working days after instruction.
 
working days after instruction.
 
Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5
 
 
 
 
4
 
 
4
 
 
4.33
 
 
 

O
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Acknowledgment Letter
Prepared 98 Letters with 1 error within 2 working days after instruction.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
QUALITY
STRATEGIC PRIORITIES
EXPECTED OUTPUT RATING
  RATING   TIME STANDARD          
(per output) STANDARD (per output) (per output)
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
(per output)
  working days after approval of the budget. working days after approval of the budget.          
  Communications   5 No Revision 5 Prepared 1-5 working days afterTotal instruction
      1.80
CORE FUNCTIONS:
(Reply)   4 1 Revision 4   Prepared 6-10 working days after instruction          
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
3 2 Revisions 3 Prepared 1-14 working days after instruction
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
   
2 3 Revisions 2   Prepared 15 or more working days after  instruction        
2. Minutes of Meeting 1
Prepared 6 More than
Minutes with3 2Revisions 1 Prepared 6 Minutes with 1 revision 3-4
revisions 5 working 3 4 4 3.67  

K
  days after the meeting. working days after the meeting.          
               
    Total       1.65
SUPPORT FUNCTIONS:              

S
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  

H  
 
3. Communications (Reply)
working days after instruction.
 
working days after instruction.
 
Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5
 
 
 
 
4
 
 
4
 
 
4.33
 
 
 

O
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
 
Actual Accomplishment   Final Average Rating       3.89  

P
Communication (Reply)
Prepared 13 Communications with 1 revision 6-10 working days after instruction.
Based on the Performance Standard Guide
Success Indicators
Output Actual Accomplishments Rating

W
(Targets + Measures)
      Q (1) E (2) T (3) A (4)  
STRATEGIC PRIORITIES              
1. Plans, Prog. and Proj. Proposal Submitted 1 Proposal with 2 revisions 5 Submitted 3 Proposals with 1 revision 3-4 5 4 3 4  

O
  working days after approval of the budget. working days after approval of the budget.          
    Total       1.80
CORE FUNCTIONS:              
1. Abstract of Bids Prepared 10 Abstract of Bids with no error 4-5 Prepared 12 Abstract of Bids with no error 4 4 3 3.67  

R
  working days after Opening of Canvass. 4-5 working days after Opening of Canvass.          
               
2. Minutes of Meeting Prepared 6 Minutes with 2 revisions 5 working Prepared 6 Minutes with 1 revision 3-4 3 4 4 3.67  
  days after the meeting. working days after the meeting.          

K
               
    Total       1.65
SUPPORT FUNCTIONS:              
1. Accomplished DTR Submitted 6 DTR with no revision 6 working Submitted 6 DTR with no revision 4-5 working 5 5 4 4.67  

S
  days after the end of the month. days after the end of the month.          
               
2. Acknowledgment Letter Prepared 50 Letters with no error within 3 Prepared 98 Letters with 1 error within 2 5 4 4 4.33  
  working days after instruction. working days after instruction.          

H
               
3. Communications (Reply) Prepared 10 Communications with 2 revisions Prepared 13 Communications with 1 revision 5 4 4 4.33  
  1-14 working days after instruction. 6-10 working days after instruction.          
    Total       0.44
    Final Average Rating       3.89  

O OVERALL RATING Final Average Rating Range


4.51-5.00
Adjectival Rating
Outstanding (O)
Strategic Priorities – 45% 1.80 + 1.65 + 0.44
P
3.51-4.50 Very Satisfactory (VS)
Core Functions – 45%
Support Functions – 10%
=3.89 2.51-3.50
1.51-2.50
Satisfactory (S)
Unsatisfactory (US)
1.00-1.50 Poor (P)
EN
THANK
YOU!

You might also like