ORGANIZATION

AL STRUCTURE
S/4 HANA PP 1

VW SAP Consultant
TOPICS TO BE COVERED
 Client
 Company Code
 Plant
 Storage Location
 MRP Controllers
 Capacity Planners
 Production Schedulers
 SAP Calendar

VW SAP Consultant 2
CLIENT
 Client represents the highest element in the organizational structure.
 Client represents a company or group of companies.
 From the SAP system’s landscape perspective , normally there are 3 clients
 Development (DEV)
 Quality (QAS)
 Production (PRD)

VW SAP Consultant 3
COMPANY CODE
 Company code is a level below the client in the SAP system.
 At this level company legally reports income statements & balance sheets.
 It’s an org unit of S/4 HANA finance.

Creation or Change of company code following is a config path used


SAP IMG  Enterprise Structure  Definition  Financial Accounting  Edit, Copy, Delete, Check Company Code  Edit Company
Code Data

VW SAP Consultant 4
PLANT
 Plant is an org unit within logistics.
 Plant can be a manufacturing site, a head office, a maintenance plant within a company.
 At plant level below mentioned tasks can be performed
 Managing inventory
 Managing demand
 Planning production
 Executing & controlling production
 Performing MRP

In the org structure we can assign only one company code to a plant, but we can assign multiple plants
to the same company code.
Creation or Change of plant following is a config path used
SAP IMG  Enterprise Structure  Definition  Logistics-General  Define, Copy, Delete, Check Plant

VW SAP Consultant 5
After creation of a plant it has to be assigned to a company code & it is mandatory.

Below is the configuration path to do this assignment


SAP IMG  Enterprise Structure  Assignment  Logistics-General  Assign Plant to Company Code

VW SAP Consultant 6
STORAGE LOCATION
 Storage location is a physical or virtual storage site for materials.
 Even storage tanks or silos can be treated as storage locations.
 The limitation is that in sap system there is no provision to define maximum storage capacity
but this provision is available in EWM SAP S/4 HANA.
 Within a plant many storage locations can be created, but we can assign a storage location to
one plant only.

Creation or Change of location following is a config path used


SAP IMG  Enterprise Structure  Definition  Material Management  Maintain Storage Location

VW SAP Consultant 7
MRP CONTROLLERS
 MRP controller can be an individual role or group of roles performing the same task. It’s
defined based on the role, responsibility or area of working instead of individuals.
 The MRP controller is primarily responsible for attending to the requirements of materials.
 MRP controller is assigned to MRP 1 view of the material master.
 This MRP controller can be used as one of the selection criteria when we run several reports.

To configure MRP controllers


SAP IMG  Production  Material Requirements Planning  Master Data  Define MRP Controllers

VW SAP Consultant 8
CAPACITY PLANNERS
 Capacity planner or capacity planner group is responsible for evaluating the current work
center or resource capacity. If required levelling of capacity can be performed.
 The capacity planners are assigned in capacity header data of work center or resource.
 This can be utilized as one of the selection criteria in all capacity evaluation & levelling
reports.

To configure capacity planner


SAP IMG  Production  Capacity Requirements Planning Master Data  Capacity Data  Set up Capacity Planner

VW SAP Consultant 9
PRODUCTION SCHEDULERS
 Production scheduler is responsible for ensuring that production execution & operations takes
place as per production plan.
 Production schedulers can be assigned in work scheduling view of material master.

To configure production scheduler


SAP IMG  Production  Shop Floor Control  Master Data  Define Production Scheduler

VW SAP Consultant 10
SAP CALENDAR
 For planning & scheduling to effectively take place, it’s imperative that a calendar exist in the
system.
 This calendar is then assigned to the plant.
 The SAP calendar creation function includes three individual steps:
• Defining holidays
• Creating holiday calendar
• Defining a factory calendar and assigning a holiday calendar to it.

To configure new calendar


SAP IMG  SAP NetWeaver  General Settings  Maintain Calendar

T-Code: SCAL

VW SAP Consultant 11