AL STRUCTURE
S/4 HANA PP 1
VW SAP Consultant
TOPICS TO BE COVERED
Client
Company Code
Plant
Storage Location
MRP Controllers
Capacity Planners
Production Schedulers
SAP Calendar
VW SAP Consultant 2
CLIENT
Client represents the highest element in the organizational structure.
Client represents a company or group of companies.
From the SAP system’s landscape perspective , normally there are 3 clients
Development (DEV)
Quality (QAS)
Production (PRD)
VW SAP Consultant 3
COMPANY CODE
Company code is a level below the client in the SAP system.
At this level company legally reports income statements & balance sheets.
It’s an org unit of S/4 HANA finance.
VW SAP Consultant 4
PLANT
Plant is an org unit within logistics.
Plant can be a manufacturing site, a head office, a maintenance plant within a company.
At plant level below mentioned tasks can be performed
Managing inventory
Managing demand
Planning production
Executing & controlling production
Performing MRP
In the org structure we can assign only one company code to a plant, but we can assign multiple plants
to the same company code.
Creation or Change of plant following is a config path used
SAP IMG Enterprise Structure Definition Logistics-General Define, Copy, Delete, Check Plant
VW SAP Consultant 5
After creation of a plant it has to be assigned to a company code & it is mandatory.
VW SAP Consultant 6
STORAGE LOCATION
Storage location is a physical or virtual storage site for materials.
Even storage tanks or silos can be treated as storage locations.
The limitation is that in sap system there is no provision to define maximum storage capacity
but this provision is available in EWM SAP S/4 HANA.
Within a plant many storage locations can be created, but we can assign a storage location to
one plant only.
VW SAP Consultant 7
MRP CONTROLLERS
MRP controller can be an individual role or group of roles performing the same task. It’s
defined based on the role, responsibility or area of working instead of individuals.
The MRP controller is primarily responsible for attending to the requirements of materials.
MRP controller is assigned to MRP 1 view of the material master.
This MRP controller can be used as one of the selection criteria when we run several reports.
VW SAP Consultant 8
CAPACITY PLANNERS
Capacity planner or capacity planner group is responsible for evaluating the current work
center or resource capacity. If required levelling of capacity can be performed.
The capacity planners are assigned in capacity header data of work center or resource.
This can be utilized as one of the selection criteria in all capacity evaluation & levelling
reports.
VW SAP Consultant 9
PRODUCTION SCHEDULERS
Production scheduler is responsible for ensuring that production execution & operations takes
place as per production plan.
Production schedulers can be assigned in work scheduling view of material master.
VW SAP Consultant 10
SAP CALENDAR
For planning & scheduling to effectively take place, it’s imperative that a calendar exist in the
system.
This calendar is then assigned to the plant.
The SAP calendar creation function includes three individual steps:
• Defining holidays
• Creating holiday calendar
• Defining a factory calendar and assigning a holiday calendar to it.
T-Code: SCAL
VW SAP Consultant 11