3,703,608/-
AE (T) Jhang Rs. 3,326,610/-
AE (T) T.T Singh Rs. 376,998/-
Rs. 3,703,608/-
After pointing out the irregularity by audit, the amount of Rs. 9,109,272/-
was made good from the supplier.
Dismantlled material was removed from various sites while carrying out reconducting of HT/LT
proposals which was required to be returned to store but the same was not returned.
Rs .000,000
F ormation P eriod of No. of P ara No. Detected *C opliance Out-
Audit C as es Verified S tanding
DM Const. Sargodha 7/09 to 6/10 5 10,16,17,18,51 25.043 4.953 20.090
DM Const. Jhang 7/09 to 6/10 6 3,18,44,45,46,48 9.449 0.408 9.041
DM Const. Faisalabad 7/09 to 6/10 4 4,7,8,10 8.294 - 8.294
Total 42.785 5.361 37.424