Professional Documents
Culture Documents
Wind Industry
Wind Industry
GSM Communication
AT Protocol
WEB PORTAL
SCADA
E-MAIL
ALERTS
AT-CLOUD
Smart Earthing Monitoring Additional Sensors Data Center
System Communication Hub User Interface
Up to 3 sensors with analog output (DR: 0 - 3,3V) Transducer device RF Link (ISM Band)
Analog 4x input ports (RD: 0 - 10V)
Up to 5 sensors with digital output (UART TTL: 3,3V)
4x input ports (Current loop: 0 / 4 - 20mA)
Earthing loop verification: Evaluation of noise level present in the ground conductor
Incorrect connection/non connection to ground system Identification of hazardous situations
Improper connections with other grounded elements Excessive leakage currents (insulation faults)
Presence of phase-neutral imbalances
2.- In Operation
Evaluation of current ground flow related with abnormal electrical activity in the facility (degradation of wind generators and MV cables isolation and transformers, arresters,
switchgears in park substation)
Monitoring of earthing system corrosion level
Establishment of an alert system linked to different and customizable criteria