Professional Documents
Culture Documents
Namata Performance MGT Workshop
Namata Performance MGT Workshop
Average Daily
Lim
Passenger Traffic
u
Roa ru
00 along major corridors
104,000
Kiambu
0
Road
d
183 1 ,
,000 34Thikaad
Ro in 2010
Kan
Waiya g und
ki o
Way
37uja5,000
Ro
380,000 ad
J
Road
422,000
00
230,0
Jogo
Road
Ngon
g
0 383
Road
3,0a0 ,0
Mo 00
22 at ng R m
La ad oa
d
ba
sa
Ro
3
Travel Demand
9/6/23 3
Justification for mrts cont…. Average Daily
Lim
uru
0 0 Passenger Traffic
Kiambu Road
399,000
477 Roa
0
2, a Road
d
,000 2 along major
6 hik
T
corridors in 2030
Kan
Waiya gun
ki Wa do
67Ju0ja,0Ro0a0d
y Roa
637,000 d
715,000
00 Jogo Roa
494,0
d
Ngon
g Road
0R0oad 673
,0
4 ta ,0 0
3La9nga 0
Mo
m
ba
sa
Ro
ad
9/6/23 4
INTP RECOMMENDATION
9/6/23 7
Institutional Framework
Management Board
STRATEGIC PLANNING
The Authority appreciates the role played by strategic
planning in the attainment of her mandate
The Authority developed her inaugural strategic plan in 2019
for the period 2019-2023
The Plan is aligned to the national development agenda
including the Kenya Vision 2030, the Big Four Agenda,
Africa Agenda 2063 and Sustainable Development Goals and
now streamlined to the Bottom up Economic Transformation
Agenda (BETA).
STRATEGIC PLANNING
The Authority’s strategic focus is in the following Key Result
Areas namely;
1. Transformation of the Public transport industry
2. Environmental Sustainability
3. Financial Stewardship
4. Institutional Capacity
KEY ACHIEVEMENTS UNDER EACH
KEY RESULT AREA
1. Transformation of the Public transport industry
S/NO Milestone Evidence
Line 1 Concept
Limuru - Kangemi - CBD - Imara Design Proposal at Finalization Stage-
Ndovu Daima - Athi River – Kitengela 48.5 28
NaMATA & KeNHA
Line 5 Ridgeways (Kiambu Rd) - Balozi Funded by Korean Govt – Draft Final
Nyati (Allsops) - Imara Daima 23.9 13 Detailed Design Report presented to all
stakeholders. Final detailed design to be
presented in September 2023
NaMATA’S ACHIEVEMENTS SINCE ITS
ESTABLISHMENTU NDER EACH KEY RESULT AREA
2. Environmental sustainability-
3. Financial stewardship
S/NO Milestone Evidence
Review detailed BRT design for Detailed design for Within the GoK 9/30/2023
BRT line 2 pilot BRT line 2 scope/Funding
of BRT line 2
Review detailed BRT design for Detailed design for Technical AFD/EIB/ 9/30/2023
clean core BRT line 3 core BRT line 3 Assistance from Swedfund/
AFD/EU EU/GIZ
Non-motorized transport Develop pedestrian walkways and Pedestrian Within the Gok 6/30/2024
(NMT) developed along cycle lanes (5km) at BRT line 2 walkways scope/Fund
BRT corridors stations, depot, park and ride, transfer and cycle ing of BRT
stations, terminal stations lanes line 2
Install street lighting and street Street Within the Gok 6/30/2024
furniture along the pedestrian lighting and scope/Fund
walkways and cycle lanes at BRT street ing of BRT
stations and depot furniture line 2
Nairobi Metropolitan Area Develop an Urban Mobility Plan within Urban 100 World Bank 6/30/2024
Urban Plan Developed NMA Mobility (KUMI)
Plan
NMA Public Develop a public transport Transition plan Technical AFD/EIB/ 12/31/2023
Transport sector transition plan Assistance from Swedfund/EU/GIZ
transitioned and AFD/EU
transformed
Develop a Bus Operating BOC framework Technical AFD/EIB/ 12/31/2023
Company (BOC) Assistance from Swedfund/EU/GIZ
Framework for the BRT line AFD/EU
2 pilot
Develop MRTS Communication Technical AFD/EIB/ 12/31/2023
communication strategy strategy Assistance from Swedfund/EU/GIZ
AFD/EU
The End. 26