Professional Documents
Culture Documents
Wheel Loader
WA900 World Population
Total 54 Units
32
7
3
2
10
KMS World Loader Population
WA800’s, WA900’s & WA1200’s
Total 401 Units
34
21
161 102
10 12 61
Market WA800 & WA900’s
Engine 12,000-14,000 hr
Transmission 12,000-14,000 hr
Differential 12,000-14,000
hr
Brakes 14,000-18,000 hr
Final drive 12,000-14,000
hr
Hydraulic pumps 11,000-13,000
Actual, component life may vary depending
hr conditions.
on job site
PPC controls
Walk through cab
Walk Through Cab
Cab Features
Viscous dampening
mounts that have rubber
over silicone oil to reduce
vibration and noise
Acoustically insulated
49% of cab is glass for
greater visibility
Adjustable suspension
seat
Tilt steering
Sliding windows
Bucket Features
Feature Benefit
Thick lip 3” (70 mm) WA900-3 and • Ties the bucket together for long
WA800-3 life while protecting the integrity
One piece back sheet 1” (25 mm) • Adds rigidity and strength
thick
Spade nose
rock bucket
Back of Machine
• Batteries: 4 total, 2 left & 2
right forward of the CWT
• Fuel sight gauge & cutoff
valve
• Fuel tank
• Port for optional quick fuel
fill
• Engine compartment
Engine bypass filter (2)
Fuel filters (2)
Fuel strainer
Top
Stop bolts on
follower plate Tube to center
Thick mounting ring with twice of reservoir
as many mounting holes
Optional Equipment
Right Sizing
CUSTOMER EXAMPLE
APPLICATION MINING
WHEEL LOADER TYPE WA-900-3
BUCKET CAPACITY cu. yd. 17.0
MATERIAL WEIGHT (LOOSE) … SWELL 30% lbs./cy. 3,000
FILL FACTOR % 96%
LOAD PER BUCKET st 24.48
TRUCK CAPACITY st 100
CYCLES PER TRUCK 4
LOAD PER TRUCK st 97.92
LOADER CYCLE TIME sec. 33.0
SPOTTING TIME (less
( lessone
oneshovel
bucket
cycle)
cycle) 50 sec. 17
LOADING TIME PER TRUCK sec. 149
TRUCKS PER HOUR 24.16
THEORETICAL MAXIMUM PRODUCTION st 2,366
EXPECTED PRODUCTION
IN A 50 MIN. HOUR: 83% st 1,972
AT AN AVAILABLITY OF: 90% st 1,774
AT AN UTILIZATION OF: 90% st 1,597
(COMBINED FACTORS) lcy 1,065
(COMBINED FACTORS) bcy 819
We have provided you with this production estimate to assist you in your evaluation of our
wheel loader. The calculations are based upon information you have supplied us. This
estimate is based on our engineering and field experience. Actual production may differ based
on the conditions encountered at the site.
Production Estimate
CUSTOMER EXAMPLE
APPLICATION MINING
WHEEL LOADER TYPE WA-900-3 HL
BUCKET CAPACITY cu. yd. 15.0
MATERIAL WEIGHT (LOOSE) … SWELL 30% lbs./cy. 3,000
FILL FACTOR % 96%
LOAD PER BUCKET st 21.60
TRUCK CAPACITY st 150
CYCLES PER TRUCK 7
LOAD PER TRUCK st 151.20
LOADER CYCLE TIME sec. 35.0
SPOTTING TIME (less
( lessone
oneshovel
bucket
cycle)
cycle) 50 sec. 15
LOADING TIME PER TRUCK sec. 260
TRUCKS PER HOUR 13.85
THEORETICAL MAXIMUM PRODUCTION st 2,094
EXPECTED PRODUCTION
IN A 50 MIN. HOUR: 83% st 1,745
AT AN AVAILABLITY OF: 90% st 1,570
AT AN UTILIZATION OF: 90% st 1,413
(COMBINED FACTORS) lcy 942
(COMBINED FACTORS) bcy 725
We have provided you with this production estimate to assist you in your evaluation of our
wheel loader. The calculations are based upon information you have supplied us. This
estimate is based on our engineering and field experience. Actual production may differ based
on the conditions encountered at the site.
The WA900-3 Will...
4 pass a 100
ton truck
7 pass a 150
ton truck
Better match
than the
992G
Truck Matching
Truck Line-up
Loader HD785-5 HD1500-5 730E 830E 930E
85 ton 100 ton 150 ton 200 ton 240 ton 320 ton
WA800-3
STD 14.4 yd3 4 5 -- -- -- --
HL 13.1 yd3 -- -- 8 -- -- --
WA900-3
STD 17.0 yd3 -- 4 -- -- -- --
HL 15.0 yd3 -- -- 7
WA1200-3
STD 26.0 yd3 -- -- 4 5 6 --
HL 23.5 yd3 -- -- -- -- 7 9
In Conclusion
We Have Cat
Surrounded